Type of work · 74 of 103 by permit count
Shoring permits in Toronto
The City of Toronto has 349 shoring permits on record for Toronto, going back to 2001. Declared construction value totals $1.3B. The most recent permit was applied for Sep 10, 2026 at 1802 Bayview Ave.
- Permits on record
- 3492001–2026
- Declared construction value
- $1.3Bas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Sep 10, 2026 | 1802 Bayview Ave | Shoring | Shoring and excavation for remediation purposes | — | Open |
| Sep 10, 2026 | 29 Pleasant Blvd | Shoring | Proposal for standalone shoring for soil remediation | $10.0M | Open |
| Jul 28, 2026 | 701 Fleet St | Shoring | Proposal for stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of the future proposed recreational facility | $2.0M | Open |
| Jul 22, 2026 | 5359 Dundas St W | Shoring | Shoring and excavation for soil remediation | $2.0M | Open |
| Jul 10, 2026 | 888 Dupont St | Shoring | REV: Revision to Standalone Shoring and Excavation Permit 26 110316 BLD 00 BA by adding Tiebacks to Ossington and Dupont Right of Way.Proposal for stand alone shoring and excavation for remediation purposes for future 17 storey mixed use building. | — | Open |
| Jun 9, 2026 | 259 Lake Shore Blvd E | Shoring | Shoring and Excavation for the purpose of remediation | $1.0M | Open |
| May 25, 2026 | 191 College St | Shoring | Standalone Shoring and Excavation permit for remediation purposes. | $200K | Open |
| May 21, 2026 | 1951 Yonge St | Shoring | Shoring and excavation for remediation purposes | $3.0M | Open |
| May 14, 2026 | 333 College St | Shoring | Shoring and excavation for remediation purposes. | $1.5M | Open |
| May 6, 2026 | 55 Lake Shore Blvd E | Shoring | Proposal to install perimeter shoring and excavate all contaminated soil (full depth excavation) | $8.5M | Open |
| Feb 19, 2026 | 49 Ontario St | Shoring | Revision include removing rakers and installing tiebacks underneath neighbouring property at 474 Adelaide St E.Shoring and excavation to remediate soil contaminants. | — | Open |
| Dec 10, 2025 | 1925 Victoria Park Ave | Shoring | PROPOSED SHORING AND EXCAVATION PERMIT FOR REMEDIATION PURPOSES. 269 LINEAR METERS | $100K | Open |
| Nov 28, 2025 | 7 Hart House Crcl | Shoring | Revision to exterior modification to the shoring based on site condition to allow the new east underground addition for mech/elec rooms, new east rehabilitated landscape, new north alley duct bank (1,852 sm) interior reconfiguration of squash court into mech/elec spaces (1,854 sm) | $5K | Open |
| Nov 28, 2025 | 325 Gerrard St E | Shoring | Proposal for standalone shoring and excavation for soil remediation purpose. | $200.0M | Open |
| Nov 26, 2025 | 399 Bathurst St | Shoring | Proposal for Shoring required for the construction of an exit tunnel and stair from an existing building. | $20.0M | Closed |
| Sep 26, 2025 | 1938 Bloor St W | Shoring | Standalone shoring and excavation for soil remediation. | $200K | Open |
| Jul 28, 2025 | 316 Campbell Ave | Shoring | Standalone shoring and excavation for the purposes of site remediation. | $15.0M | Open |
| Jun 9, 2025 | 4630 Kingston Rd | Shoring | Proposal for a standalone Shoring and Excavation permit for Remediation PurposesSee also 24 151205 DEM and 21 250499 ESC 25 SA | $100K | Open |
| May 26, 2025 | 616 Delaware Ave N | Shoring | Proposal for shoring and excavation of existing site to allow for new residential fourplex. | $35K | Open |
| May 12, 2025 | 2 Tecumseth St | Shoring | Shoring for soil remediation | — | Open |
| Feb 4, 2025 | 1086 Yonge St | Shoring | Excavation and shoring for soil remediation for four (4) floors of below grade construction; this permit is ONLY for soil remediation. | $60.0M | Open |
| Jan 20, 2025 | 175 Eileen Ave | Shoring | Standalone excavation site works for boundary control works to support upcoming (RSC) Record of Site Condition | $5K | Open |
| Jan 20, 2025 | 1467 Bathurst St | Shoring | STAND ALONE SHORING PERMIT...REMEDIATION PERMIT APPLICATION for remedial shoring and excavation required to excavate contaminated soils materials PROJECT 490 ST CLAIR AV W | $45.0M | Open |
| Jan 16, 2025 | 241A Church St | Shoring | Standalone shoring for soil remediation. | $1.0M | Closed |
| Jan 8, 2025 | 403 Keele St | Shoring | Proposal for partial shoring and excavation for the purpose of soil remediation.See 22 140177 STE 04 SA for future development. | $350K | Open |
| Dec 10, 2024 | 405 Mount Pleasant Rd | Shoring | Shoring and excavation permit for the purpose of soil remediation for future development of Outdoor Sports Field and Outdoor Space for Greenwood College | $3.7M | Closed |
| Oct 29, 2024 | 60 Fieldway Rd | Shoring | Standalone shoring and excavation for the purposes of site remediation. Includes site at the 58 Fieldway and 60 Fieldway Rd. (VN) | $300K | Open |
| Aug 23, 2024 | 51 Woodland Park Rd | Shoring | Proposal for shoring along the rear of the building due to recent heavy rains. The sloped ground at the back of the house now poses a significant risk of sliding or erosion. | $50K | Closed |
| Jun 24, 2024 | 875 The Queensway | Shoring | Standalone shoring and excavation for the purposes of site remediation. | — | Closed |
| Jun 13, 2024 | 3526 Lake Shore Blvd W | Shoring | REV 02- Revision for shoring as part of existing environmental remediation and restoration works.Standalone shoring and excavation for site remediation purposes. | — | Open |
| May 14, 2024 | 34 Southport St | Shoring | Proposal for shoring and excavation for the purpose of soil remediation. | $50K | Open |
| May 9, 2024 | 1375 Queen St W | Shoring | Shoring and Excavation work for remedial work. | $1.0M | Open |
| May 8, 2024 | 227 Gerrard St E | Shoring | Shoring and excavation for the purpose of soil remediation ONLY. | — | Open |
| Feb 9, 2024 | 75 Eastdale Ave | Shoring | Proposal to install shoring below the trench beam in the parking garage of an exisitng apartment building. | $40K | Closed |
| Jan 23, 2024 | 462 Wellington St W | Shoring | Shoring & excavation for a 15 storey retirement home with retail and office space. Retention of the existing heritage building. | $95.0M | Closed |
| Jan 18, 2024 | 58 Fieldway Rd | Shoring | STANDALONE SHORING AND EXCAVATION FOR REMEDIATION PURPOSES | — | Closed |
| Dec 6, 2023 | 555 Rexdale Blvd | Shoring | Provide tie-backs of existing retaining wall to prevent further rotation. | $150K | Closed |
| Nov 30, 2023 | 170 Queens Wharf Rd | Shoring | PROPOSED: Environmental remediation of existing soils, ground reinforcement, new connections to municipal services, construction of large retaining walls, site lighting. | $12.0M | Open |
| Oct 11, 2023 | 406 Keele St | Shoring | REVISION 01: purpose of soil remediationShoring and excavation permit for the purpose of soil remediation | — | Open |
| Sep 18, 2023 | 316 Bloor St W | Shoring | Proposal for a standalone shoring installation of 42 caissons along the northern boundary of the site as shown in the shoring plans related to TTC Spadina LRT station platform extension. | $100K | Open |
The 40 most recent of 349 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.