Type of work · 78 of 103 by permit count
HVAC: Groups A & B permits in Toronto
The City of Toronto has 257 hvac: groups a & b permits on record for Toronto, going back to 2001. Declared construction value totals $60.1M. The most recent permit was issued Jun 22, 2026 at 95 Wellington St W.
- Permits on record
- 2572001–2026
- Declared construction value
- $60.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Jun 22, 2026 | 95 Wellington St W | HVAC: Groups A & B | Proposed HVAC stand alone for tenant space (Refer to permit #BP -12 163867 MS ) - see 25 141200 | $1K | Open |
| Jun 17, 2026 | 655 Spadina Ave | HVAC: Groups A & B | Proposal for HVAC Replacement | $64K | Open |
| Jun 16, 2026 | 27 King's College Crcl | HVAC: Groups A & B | Proposal for HVAC Replacement | $10K | Open |
| May 27, 2026 | 246 Bloor St W | HVAC: Groups A & B | Proposal for HVAC Replacement | $30K | Open |
| May 21, 2026 | 16 Bancroft Ave | HVAC: Groups A & B | Proposal for HVAC Replacement | $27K | Open |
| Mar 9, 2026 | 1159 St Clair Ave W | HVAC: Groups A & B | REV02: Proposed revision to add new furnace in basement as per drawingsREVISION - add new kitchen exhaust and new furnaceProposed new kitchen exhaust system and a new furnace. | — | Open |
| Feb 26, 2026 | 605 Rogers Rd | HVAC: Groups A & B | Proposal for installation of two new exhaust hoods, two exhaust fans & one make-up air fan in existing restaurant kitchen. | $20K | Closed |
| Nov 13, 2025 | 325 Huron St | HVAC: Groups A & B | Proposal for University of Toronto CBTC fMRI Remedial Work - the project is located at the Centre for Biological Timing and Cognition (CBTC) portion of our Ramsay Wright Laboratories Building | $809K | Open |
| Nov 3, 2025 | 1226 Yonge St | HVAC: Groups A & B | Proposal to install a new kitchen exhaust hood. | $30K | Closed |
| Oct 31, 2025 | 158 Cumberland St | HVAC: Groups A & B | Proposal to install HVAC System in main restaurant and rear patio. | $20K | Closed |
| Jul 31, 2025 | 50 Gould St | HVAC: Groups A & B | Revision to replacement of existing steam condensate tank.Installation of new relief vent for existing condensate receiver tank. | — | Open |
| Jul 7, 2025 | 803 King St W | HVAC: Groups A & B | Proposal to replace existing HVAC units. | $30K | Open |
| Mar 28, 2025 | 105 Vanderhoof Ave | HVAC: Groups A & B | Proposal to install an exhaust system within the central kitchen. | $15K | Closed |
| Mar 13, 2025 | 200 Old Sheppard Ave | HVAC: Groups A & B | Proposed installation of new air conditioning units for cooling centre in library | $100K | Closed |
| Mar 13, 2025 | 30 Highcastle Rd | HVAC: Groups A & B | Proposed installation of new air conditioning units for cooling centre in gym | $100K | Closed |
| Mar 12, 2025 | 101 Dean Park Rd | HVAC: Groups A & B | Proposed installation of new air conditioning units for cooling centre in gym | $100K | Closed |
| Oct 28, 2024 | 2075 Bayview Ave | HVAC: Groups A & B | HVAC for hallway renovation | $100K | Open |
| Oct 21, 2024 | 61 Front St W | HVAC: Groups A & B | REV 01 - Revision description in application formThe scope of work includes the removal and isolation of existing mechanical, electrical, IT and security infrastructure in the lower concourse area, in the concourse area, in the truck tunnel, and at platform level as part of the Union Station Enhance | — | Open |
| Aug 21, 2024 | 145R King St W | HVAC: Groups A & B | Interior alterations of concourse level, the re-alignment and redistribution of electrical, mechanical and plumbing. | $2.5M | Closed |
| Aug 20, 2024 | 1515 Bloor St W | HVAC: Groups A & B | Replacing existing air handling unit and its heating pipes with a new one with heating and cooling and new condensate unit. | $368K | Open |
| Jun 27, 2024 | 5 Exbury Rd | HVAC: Groups A & B | Installation of new air conditioning units for cooling centre in gym | $100K | Closed |
| Jun 13, 2024 | 25 Havenview Rd | HVAC: Groups A & B | Proposed replacement of a air handling unit in the library of an existing elementary school. | $100K | Closed |
| Jun 12, 2024 | 260 Ingleton Blvd | HVAC: Groups A & B | Proposed Commercial Kitchen Ventilation_Mechanical Stand Alone | $75K | Open |
| May 30, 2024 | 60 Maniza Rd | HVAC: Groups A & B | Proposed installation of a new air conditioning units for cooling centre in gym of an existing elementary school. | $100K | Closed |
| May 22, 2024 | 20 Bernadine St | HVAC: Groups A & B | Proposed installation of a new air conditioning units for cooling centre in gym of an existing elementary school. | $100K | Closed |
| May 22, 2024 | 75 Hupfield Trl | HVAC: Groups A & B | Proposed installation of a new air conditioning units for cooling centre in gym of an existing elementary school. | $100K | Closed |
| May 22, 2024 | 101 Birchmount Rd | HVAC: Groups A & B | Proposed installation of new air conditioning units for cooling centre in gym. | $100K | Open |
| Mar 20, 2024 | 75 Alexmuir Blvd | HVAC: Groups A & B | Repair of ventilation system & replacement of make-up air units. | $500K | Closed |
| Mar 4, 2024 | 454 Eglinton Ave W | HVAC: Groups A & B | HVAC and Plumbing Interior renovations for a take-out restaurant. | $5K | Closed |
| Jan 23, 2024 | 3601 Victoria Park Ave | HVAC: Groups A & B | Proposed Commercial Kitchen Ventilation and Fire Suppression Systems | $35K | Closed |
| Dec 15, 2023 | 100 Queen's Park | HVAC: Groups A & B | Removal and disposal of existing HVAC system and installation of a new Air Handling Unit (AHU SF-26) | $691K | Open |
| Dec 7, 2023 | 2885 Kennedy Rd | HVAC: Groups A & B | Rev 01- Include an additional 2 rooftop units, due to age, to also be replaced like for like. Total rooftop units to be replaced will now be 18. PROPOSED: Replacement of 16 rooftop units, due to age, units to be replaced like for like. | — | Closed |
| Nov 9, 2023 | 665 College St | HVAC: Groups A & B | PROPOSED: PATIO HEATING | $10K | Closed |
| Nov 1, 2023 | 555 University Ave | HVAC: Groups A & B | Like for like replacement of the parking garage supply and exhaust fans. The existing fans are at the end of their servicable life and warrant replacement. The fans and motors will be replaced with new. There are three fans on parking level one, four fans on P2, four fans on P3 and four fans on P4. | $1.1M | Closed |
| Oct 19, 2023 | 200 Elizabeth St | HVAC: Groups A & B | proposing to remove existing HVAC and replace with a new system | — | Closed |
| Oct 19, 2023 | 1009 Sheppard Ave W | HVAC: Groups A & B | Revision 01: Exhaust duct¿s penetration location has changed from the foundation wall to the windowlocated on the same wall. Insulated metal panel will replace the glass in the upper portion of window.City of Toronto NCP # SR3787065442/ WS3790506297.Installation design of the residential washer & dr | — | Closed |
| Sep 6, 2023 | 2015 Lawrence Ave W | HVAC: Groups A & B | City of Toronto NCP # SR3787065442/ WS3790506297.Rev 01: relocate washer and dryer to current shower room, connect to existing sanitary line. Make connections to existing domestic hot and cold water | — | Closed |
| Aug 8, 2023 | 100 Front St W | HVAC: Groups A & B | Replacement of one existing ventilation supply air unit that is at the end of functional life. Like for like capacity and function. | $650K | Open |
| Jul 6, 2023 | 21 Kenmark Blvd | HVAC: Groups A & B | Air condiitoning installation in the Gym | — | Closed |
| May 15, 2023 | 380 Victoria St | HVAC: Groups A & B | Refurbishment of existing air handling units and installation of new heat pump system for existing air handling units. (350 Victoria St.) (related to 23 133333 PSA 00 PS) | $6.0M | Closed |
The 40 most recent of 257 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.