Street · 1385 of 8,565 by permit count
Building permits on Vanley Cres
The City of Toronto has 140 building permits on record for Vanley Cres, going back to 1999. Declared construction value totals $45.3M. The most recent permit was issued Jul 6, 2026 at 35-75 VANLEY CRES.
- Permits on record
- 1401999–2026
- Declared construction value
- $45.3Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 6, 2026 | Demolition | Proposed demolition of existing Quonset hut including its foundations. | — | Demolition |
| Jul 3, 2026 | Building Permit Related(MS) | HVAC - PROPOSE TO CONSTRUCT STORAGE BUILDING INCLUDING SLAB ON GRADE ON HELICAL PILES AND PREFABRICATED STEEL SUPERSTRUCTURE | — | Open |
| Jul 2, 2026 | New Building | Proposal for rehabilitation of pavement, replacement of the storage structure and construct a new storage bunker. | $3.0M | New build |
| Jun 4, 2026 | Demolition | Demolition of Building NO.275 within subject property. | — | Demolition |
| Mar 26, 2026 | Addition(s) | Rev 01-GROUND FLOOR INTERIOR LAYOUT REVISEDProposal for a two-storey addition to the existing commercial school | — | Open |
| Mar 9, 2026 | Building Permit Related(MS) | Rev 01HVAC - Proposal for a two-storey addition to the existing commercial school | — | Open |
| Mar 9, 2026 | Building Permit Related(PS) | Rev 01Plumbing - Proposal for a two-storey addition to the existing commercial school | — | Open |
| Dec 10, 2025 | Interior Alterations | Proposal for interior alterations to existing Waste Management Facility. | $6.0M | Open |
| Nov 12, 2025 | Interior Alterations | Revision 01: Proposal to revise, removing upper roof bay windows, replace with metal panelUpgrades to existing structural and architectural elements; interior and exterior. | — | Closed |
| Jul 8, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - The site currently posses a waste management facility and a 4-story office building. The proposal includes a new 5-story office building with an underground parking | — | Open |
| Dec 2, 2024 | Alternative Solution | The current version of the OBC 2012 does not set out any supporting clauses for the calculation of CLT fire-rating. As such, AECOM had been asked by the City of Toronto Building Permit Department to submit an alternative solution permit. The use of CLT in a 1 hour rated assembly is now supported by | — | Closed |
| Nov 15, 2024 | Alternative Solution | The current version of the OBC 2012 does not set out any supporting clauses for the calculation of CLT fire-rating. As such, AECOM had been asked by the City of Toronto Building Permit Department to submit an alternative solution permit. See application for details. | — | Closed |
| Nov 6, 2024 | Alternative Solution | Alternative Solution:The current version of the OBC 2012 does not set out any supporting clauses for the calculation of CLT fire-rating. As such, AECOM had been asked by the City of Toronto Building Permit Department to submit an alternative solution permit. The use of CLT in a 1 hour rated assembly | — | Closed |
| Aug 27, 2024 | Fire Alarm | Proposal to replace the fire arlarm control panel and devices in an existing commercial building.Convenience address is 35 Vanley Crs. | $58K | Closed |
| Jun 13, 2024 | Backflow Prevention Devices (Water only) | Proposal to remove defective 1-1/2 dcva backflow preventor and install new 1-1/2" dcva backflow preventor horizontally includng wye strainer | $3K | Closed |
| Jan 19, 2024 | Special Ventilation System | PROPOSED: Exhaust Ventilation Improvement for Dufferin TS Machine Shop and Storage Rooms | $120K | Closed |
| Dec 14, 2023 | Fire Alarm | Proposal for fire larm system renewal, including all field devices | $247K | Open |
| Dec 11, 2023 | Building Permit Related(PS) | Plumbing - The site currently posses a waste management facility and a 4-story office building. The proposal includes a new 5-story office building with an underground parking | — | Open |
| Dec 11, 2023 | Building Permit Related(MS) | HVAC - The site currently posses a waste management facility and a 4-story office building. The proposal includes a new 5-story office building with an underground parking | — | Open |
| Dec 11, 2023 | New Building | The site currently posses a waste management facility and a 4-story office building. The proposal includes a new 5-story office building with an underground parking | — | New build |
| Sep 26, 2022 | Other(BA) | To complete the removal/disposal of the existing vehicular weigh scales at the City of Toronto Dufferin solid waste transfer station and to supply/install new prefabricated galvanized vehicular weigh scales including the provision of lighting within the weigh scale pits. | $564K | Open |
| Apr 5, 2022 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Interior alterations to existing recycling facity to remove office space, repair roof as required, replace existing sprinkler system, replace lighting and fire alarm system. Upgrade ventilation, install new washrooms and new sprinkler control room and remove landscaping | — | Closed |
| Apr 1, 2022 | New Building | To construct new concrete structure for open parking deck addition to existing commercial school (Toronto College of Dental Hygiene) | $100K | New build |
| Mar 31, 2022 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - To construct new concrete structure for open parking deck addition to existing commercial school (Toronto College of Dental Hygiene) | — | Open |
| Feb 10, 2022 | Retaining Wall | Replacement of existing retaining wall | $1.0M | Open |
| Nov 16, 2021 | Building Permit Related(MS) | HVAC - Proposal for interior alteration to offices at front, removal of existing wall partition and structural floor and installation of overhead doors. | — | Open |
| Sep 7, 2021 | Interior Alterations | Revision #01 - Changes to exterior elevation and added (2) man doors.Interior alterations for proposed overhead door - Leon's Auto Body | — | Open |
| Aug 9, 2021 | Multiple Projects | Revision 01. Proposal for interior alteration to offices at front, removal of existing wall partition and structural floor and installation of overhead doors. | — | Open |
| May 5, 2021 | Addition(s) | Proposed a new rear yard addition and mezzanine to an existing automotive commercial building | $100K | Open |
| May 5, 2021 | Building Permit Related(MS) | HVAC - Proposed a new rear yard addition and mezzanine to an existing automotive commercial building | — | Open |
| Oct 7, 2020 | Other(PS) | alterations to drainage plan from tipping floor to basement to waste management site | $400K | Closed |
| Jul 31, 2020 | Building Permit Related(PS) | Plumbing - Interior alterations to existing recycling facity to remove office space, repair roof as required, replace existing sprinkler system, replace lighting and fire alarm system. Upgrade ventilation, install new washrooms and new sprinkler control room and remove landscaping to for additional | — | Closed |
| Jul 31, 2020 | Building Permit Related(MS) | HVAC - Interior alterations to existing recycling facity to remove office space, repair roof as required, replace existing sprinkler system, replace lighting and fire alarm system. Upgrade ventilation, install new washrooms and new sprinkler control room and remove landscaping to for additional park | — | Closed |
| Jul 31, 2020 | Interior Alterations | Interior alterations to existing recycling facity to remove office space, repair roof as required, replace existing sprinkler system, replace lighting and fire alarm system. Upgrade ventilation, install new washrooms and new sprinkler control room and remove landscaping for additional parking space | $1.0M | Open |
| Jun 4, 2020 | Interior Alterations | Scope of work involve the construction of some partition walls to enclose a storage area. HVAC equipment will be added to help control de humidity levels throughout the year. | $450K | Closed |
| Jun 4, 2020 | Building Permit Related(MS) | HVAC - Scope of work involve the construction of some partition walls to enclose a storage area. HVAC equipment will be added to help control de humidity levels throughout the year. | — | Open |
| Jun 4, 2020 | Building Permit Related(PS) | Plumbing - Scope of work involve the construction of some partition walls to enclose a storage area. HVAC equipment will be added to help control de humidity levels throughout the year. | — | Open |
| Nov 29, 2019 | Other(BA) | Structural restoration of existing tipping floor, push wall and install new tipping floor topping protection system | $4.5M | Closed |
| Sep 17, 2019 | Building Permit Related(PS) | Plumbing - Interior alterations to the existing office, truckers washroom (abandoned), file room and 2 washrooms at the Dufferin Transfer Station to be re-purposed to an office. Water service and sanitary drainage in the decommissioned washrooms will be disabled, capped and the service will be remov | — | Closed |
| Sep 17, 2019 | Building Permit Related(MS) | HVAC - Interior alterations to the existing office, truckers washroom (abandoned), file room and 2 washrooms at the Dufferin Transfer Station to be re-purposed to an office. Water service and sanitary drainage in the decommissioned washrooms will be disabled, capped and the service will be removed f | — | Closed |
The 40 most recent of 140 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.