Street · 2285 of 8,565 by permit count
Building permits on Van Horne Ave
The City of Toronto has 83 building permits on record for Van Horne Ave, going back to 1993. Those permits created 5 homes and removed 0, a net change of +5. Declared construction value totals $22.4M. The most recent permit was issued Aug 19, 2026 at 575 Van Horne Ave.
- Permits on record
- 831993–2026
- Declared construction value
- $22.4Mas filed, not adjusted
- Homes created
- 5dwelling units
- Homes removed
- 0net +5
Permits issued per year
20032026 (part year)
Most common work
Structures worked on
Where this street runs
Don Valley Village 64 permits
Pleasant View 19 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 19, 2026 | Multiple Projects | Revision to the roof Proposal to construct interior alterations to existing library and a new 275 m2 addition | — | Open |
| Apr 10, 2026 | Building Permit Related(MS) | HVAC - Proposed garden suite at the rear of existing dwelling | — | Open |
| Apr 10, 2026 | New Laneway / Rear Yard Suite | Proposed garden suite at the rear of existing dwelling | $180K | Open |
| Apr 10, 2026 | Building Permit Related(PS) | Plumbing - Proposed garden suite at the rear of existing dwelling | — | Open |
| Mar 30, 2026 | Deck | Proposal to reduce the size of the rear deck. | $8K | Open |
| Mar 3, 2026 | Garage Repair/Reconstruction | Localized Garage Roof Slab Repairs | $650K | Open |
| Oct 27, 2025 | Building Permit Related(PS) | Plumbing - Proposed new second unit in basement of existing dwelling | — | Open |
| Oct 27, 2025 | Second Suite (New) | Proposed new second unit in basement of existing dwelling | $20K | Open |
| Mar 24, 2025 | Sign Building Permit Related | 1 ground sign**Divine Mercy Catholic Elementary School** | — | Closed |
| Mar 17, 2025 | Garage Repair/Reconstruction | REV 01 - Area of work has been revised to only include two sections of Level A, and Level B of garage roof slab as shown in attached drawings. Levels C and D of garage roof slab have been omitted from overall scope of workGarage roof slab repairs to the existing rental townhouses | — | Open |
| Mar 14, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct interior alterations to existing library and a new 275 m2 addition | — | Open |
| Mar 14, 2025 | Building Permit Related(PS) | Plumbing - Proposal to construct interior alterations to existing library and a new 275 m2 addition | — | Open |
| Mar 4, 2025 | Second Suite (New) | Revision - structure changes based on site situation and add a fire rated door between the two units | — | Closed |
| Feb 6, 2025 | Other(SR) | Proposal for a rooftop solar panel installation | $24K | Closed |
| Nov 14, 2023 | Balcony/Guard Repairs | Proposed balcony panel and railing replacement. | $700K | Closed |
| Sep 14, 2023 | Garage Repair/Reconstruction | Garage roof slab repairs at two columns | $60K | Open |
| Jun 30, 2023 | Balcony/Guard Repairs | PROPOSED: BALCONY CONCRETE REPAIRS AND PAINTING | $576K | Closed |
| May 4, 2023 | Addition(s) | propose to construct a new gazebo | $75K | Closed |
| Feb 13, 2023 | Building Permit Related (DR) | Foundation Inside Drain - Three storey elementary school with child care - St. Matthias Catholic School | — | Closed |
| Feb 13, 2023 | Site Service | Site Servicing - Three storey elementary school with child care - St. Matthias Catholic School | $575K | Closed |
| Feb 13, 2023 | New Building | Three storey elementary school with child care - St. Matthias Catholic School | $16.3M | New build |
| Feb 13, 2023 | Building Permit Related(PS) | Plumbing - Three storey elementary school with child care - St. Matthias Catholic School | — | Closed |
| Feb 13, 2023 | Building Permit Related(MS) | HVAC - Three storey elementary school with child care - St. Matthias Catholic School | — | Closed |
| Sep 16, 2022 | Back Water Valve (Sewer only) | bwv installation | — | Closed |
| Aug 23, 2022 | Building Permit Related (DR) | Drain - Proposal to construct a below grade entrance in the rear yard. | — | Closed |
| Aug 23, 2022 | Walk-Out Stair | Proposal to construct a below grade entrance in the rear yard. | $48K | Closed |
| Aug 3, 2022 | Demolition | Demolish the existing two storey elementary school - St. Matthias Catholic School | — | Demolition |
| Feb 10, 2022 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Three storey elementary school with child care - St. Matthias Catholic School | — | Closed |
| Jul 16, 2021 | Balcony/Guard Repairs | Balcony repairs and balcony guard replacement (132 balconies) | $700K | Closed |
| Apr 1, 2021 | Interior Alterations | Revision 01 - REMOVE LOADBEARING WALLS AND INTERIOR ALTERATIONS ON MAIN FLOOR. THIS APPLICATION IS FOR REVISION OF BUILDING PERMIT 20 130395 BLDProposal for interior alterations to the main floor, with the removal of a load bearing wall. | — | Open |
| Nov 27, 2020 | Addition(s) | Underground grarage entrance enclosure | $30K | Closed |
| Aug 12, 2020 | Certified Portables | ADD Two PORTABLE(S) TO SITE Certified existing Portable from another school site | $100K | Open |
| May 4, 2020 | Multiple Projects | EIFS overcladding and balcony repairs | $900K | Closed |
| May 27, 2019 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Nov 6, 2018 | Building Permit Related(MS) | HVAC - Proposed fire damage restoration to townhouse. | — | Closed |
| Aug 1, 2018 | Multiple Projects | Revision for reinforcement of existing roof trusses. | — | Closed |
| Jun 4, 2018 | Non-Certified Portables | ADD ONE PORTABLE(S) TO SITE Elementary School St Matthias Catholic School. | $10K | Open |
| May 2, 2018 | Fire Damage | Proposed fire damage restoration to townhouse. | — | Closed |
| Oct 23, 2017 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Oct 19, 2017 | Re-Roofing/Re-Cladding | EIFS overcladding of both end walls and partial returns. | $350K | Closed |
The 40 most recent of 83 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.