Street · 3613 of 8,565 by permit count
Building permits on Valhalla Inn Rd
The City of Toronto has 43 building permits on record for Valhalla Inn Rd, going back to 2001. Those permits created 298 homes and removed 0, a net change of +298. Declared construction value totals $77.7M. The most recent permit was issued Jul 9, 2025 at 1 Valhalla Inn Rd.
- Permits on record
- 432001–2025
- Declared construction value
- $77.7Mas filed, not adjusted
- Homes created
- 298dwelling units
- Homes removed
- 0net +298
Permits issued per year
20012025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 9, 2025 | Garage Repair/Reconstruction | Proposed localized garage repairs. | $437K | Closed |
| Jul 13, 2022 | Garage Repair/Reconstruction | Proposal for underground garage repairs to a residential complex with a shared garage for the Apartment Buildings and Townhouse Blocks. Address includes 1, 5, 9, 15, 23, and 27 Valhall Inn Road. | $250K | Open |
| Apr 9, 2018 | Building Permit Related(PS) | Plumbing - The main floor bathroom will be expanded to accommodate a shower. This will involve the demolition of an existing wall and the construction of two others. A main floor bedroom wall will also be built to separate it from the living room. On the upper floor of the unit, the master bathroom | — | Closed |
| Mar 16, 2018 | Interior Alterations | The main floor bathroom will be expanded to accommodate a shower. This will involve the demolition of an existing wall and the construction of two others. A main floor bedroom wall will also be built to separate it from the living room. On the upper floor of the unit, the master bathroom will be exp | $20K | Open |
| Dec 31, 2015 | Electromagnetic Locks | Install 3 mag locks on ground, 2nd & 3rd floors Bldg C Phase 3 | $2K | Closed |
| Oct 1, 2015 | Building Permit Related(MS) | HVAC - Construct new (29) storey hi-rise, 278 units and (2) levels underground parking.Bldg C Phase 3. June01/15 Revised drawings submitted with proposed increase of number of Appartment Units from 278 to 298. | — | Open |
| Jul 30, 2015 | Building Permit Related(PS) | Plumbing - Construct new (29) storey hi-rise, 278 units and (2) levels underground parking. Bldg C Phase 3. June01/15 Revised drawings submitted with proposed increase of number of Appartment Units from 278 to 298. | — | Open |
| Jul 30, 2015 | New Building | Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3.June01/15 Revised drawings submitted with proposed increase of number of Appartment Units from 278 to 298. | $50.0M | New build |
| Dec 10, 2014 | Building Permit Related (DR) | Drain - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 | — | Open |
| Jul 11, 2014 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in the basement mechanical room of a 4 Story Apartment Building. | $3K | Closed |
| Feb 27, 2014 | New Building | REVISION: Reducing number of suites from 336 to 335. Suites 3301, 3302 and 3303 combined into two suites, 3301 and 3302.(Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 329 units plus 7 units on podium TOTAL UNITS 336, two levels of below grade parking and three levels of above | — | New build |
| Jan 30, 2014 | Partial Permit - Structural Framing | Part Permit - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 | — | Closed |
| Nov 21, 2013 | Electromagnetic Locks | (10) Maglocks to (2) levels of underground parking and (4) levels of above grade residential. Phase 2, Tower B | $5K | Open |
| Nov 8, 2013 | Partial Permit - Shoring | Part Permit - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 | — | Closed |
| Nov 8, 2013 | Partial Permit - Foundation | Part Permit - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 | — | Closed |
| Mar 21, 2013 | Sales Pavilions | Temporary sales pavilion for site of future condos and townhouses. Revised to show sound wall on west side of pavillion. | — | Closed |
| Feb 21, 2013 | Building Permit Related(MS) | HVAC - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. | — | Closed |
| Jan 17, 2013 | Building Permit Related(PS) | Plumbing - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. | — | Closed |
| Oct 16, 2012 | Electromagnetic Locks | Installation of 3 maglocks | $5K | Closed |
| Oct 15, 2012 | New Building | Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. TOWNHOUSES NOT PART OF THIS PERMIT Revision #1: Revision of (2) stage fire alarm system to single stage | — | New build |
| Jul 26, 2012 | Partial Permit - Structural Framing | Part Permit - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. | — | Open |
| Apr 27, 2012 | Building Permit Related(MS) | HVAC - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. | — | Closed |
| Apr 23, 2012 | Partial Permit - Structural Framing | Part Permit - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. | — | Open |
| Apr 13, 2012 | Unspecified | This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 2746171 | — | Closed |
| Feb 23, 2012 | Building Permit Related(PS) | Conditional Permit - Plumbing - Proposal to construct Phase 1 of 3-phase project: 3 storey back to back townhouse block W4 with 16 residential units. | — | Closed |
| Feb 23, 2012 | Building Permit Related(MS) | Conditional Permit - HVAC - Proposal to construct Phase 1 of 3-phase project: 3 storey back to back townhouse block W4 with 16 residential units. | — | Closed |
| Feb 23, 2012 | Building Permit Related(PS) | Conditional Permit - Plumbing - Proposal to construct Phase 1 of 3-phase project: 3 storey combined back to back townhouse block (W1, W2, W3) with 52 residential units. | — | Closed |
| Feb 23, 2012 | Building Permit Related(MS) | Conditional Permit - HVAC - Proposal to construct Phase 1 of 3-phase project: 3 storey combined back to back townhouse block (W1, W2, W3) with 52 residential units. | — | Closed |
| Feb 23, 2012 | Building Permit Related(PS) | Conditional Permit - Plumbing - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. | — | Closed |
| Feb 21, 2012 | Unspecified | This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 2747534 | — | Closed |
| Feb 21, 2012 | Unspecified | This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 2747533 | — | Closed |
| Jan 30, 2012 | New Building | Conditional Permit - Proposal to construct Phase 1 of 3-phase project: 3 storey back to back townhouse block W4 and W5 with 16 residential units. | — | New build |
| Jan 30, 2012 | New Building | Conditional Permit - Proposal to construct Phase 1 of 3-phase project: 3 storey combined back to back townhouse block (W1, W2, W3, W6) with 52 residential units. | — | New build |
| Dec 20, 2011 | Partial Permit - Foundation | Part Permit - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. | — | Closed |
| Jul 7, 2011 | Inside and Outside Drains | Drain - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. | — | Open |
| May 4, 2011 | Partial Permit - Shoring | Part Permit - Shoring along the east property line. Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. | — | Closed |
| May 4, 2011 | Partial Permit - Foundation | Part Permit - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. | — | Closed |
| May 4, 2011 | Inside and Outside Drains | Drain - Site services for Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Also for townhouses (68 units) on permits 10-286862 and 10-286867 | $27.0M | Open |
| Jan 10, 2011 | Demolition | Proposed demolition of existing highrise hotel building. | — | Demolition |
| Mar 25, 2010 | Building Permit Related(PS) | Plumbing - Temporary sales pavilion for site of future condos and townhouses 2 barrier free washrooms, staff lunch room fixtures | — | Closed |
The 40 most recent of 43 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.