thepermitmap

Street · 3613 of 8,565 by permit count

Building permits on Valhalla Inn Rd

The City of Toronto has 43 building permits on record for Valhalla Inn Rd, going back to 2001. Those permits created 298 homes and removed 0, a net change of +298. Declared construction value totals $77.7M. The most recent permit was issued Jul 9, 2025 at 1 Valhalla Inn Rd.

Permits on record
432001–2025
Declared construction value
$77.7Mas filed, not adjusted
Homes created
298dwelling units
Homes removed
0net +298

Permits issued per year

20012025 (part year)

Most common work

  • Building Permit Related(PS)7 · 16%
  • Building Permit Related(MS)6 · 14%
  • New Building5 · 12%
  • Partial Permit - Structural Framing3 · 7%
  • Electromagnetic Locks3 · 7%
  • Partial Permit - Foundation3 · 7%
  • Unspecified3 · 7%
  • Garage Repair/Reconstruction2 · 5%
  • Inside and Outside Drains2 · 5%
  • Partial Permit - Shoring2 · 5%
  • Building Permit Related (DR)1 · 2%
  • Interior Alterations1 · 2%

Structures worked on

  • Apartment Building28 · 65%
  • SFD - Townhouse6 · 14%
  • Commercial3 · 7%
  • Unspecified3 · 7%
  • Other1 · 2%
  • Motel/Hotel1 · 2%
  • Apartment Hotel1 · 2%

Most recent permits

Issued Work What was filed Value Status
Jul 9, 2025 Garage Repair/Reconstruction Proposed localized garage repairs. $437K Closed
Jul 13, 2022 Garage Repair/Reconstruction Proposal for underground garage repairs to a residential complex with a shared garage for the Apartment Buildings and Townhouse Blocks. Address includes 1, 5, 9, 15, 23, and 27 Valhall Inn Road. $250K Open
Apr 9, 2018 Building Permit Related(PS) Plumbing - The main floor bathroom will be expanded to accommodate a shower. This will involve the demolition of an existing wall and the construction of two others. A main floor bedroom wall will also be built to separate it from the living room. On the upper floor of the unit, the master bathroom Closed
Mar 16, 2018 Interior Alterations The main floor bathroom will be expanded to accommodate a shower. This will involve the demolition of an existing wall and the construction of two others. A main floor bedroom wall will also be built to separate it from the living room. On the upper floor of the unit, the master bathroom will be exp $20K Open
Dec 31, 2015 Electromagnetic Locks Install 3 mag locks on ground, 2nd & 3rd floors Bldg C Phase 3 $2K Closed
Oct 1, 2015 Building Permit Related(MS) HVAC - Construct new (29) storey hi-rise, 278 units and (2) levels underground parking.Bldg C Phase 3. June01/15 Revised drawings submitted with proposed increase of number of Appartment Units from 278 to 298. Open
Jul 30, 2015 Building Permit Related(PS) Plumbing - Construct new (29) storey hi-rise, 278 units and (2) levels underground parking. Bldg C Phase 3. June01/15 Revised drawings submitted with proposed increase of number of Appartment Units from 278 to 298. Open
Jul 30, 2015 New Building Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3.June01/15 Revised drawings submitted with proposed increase of number of Appartment Units from 278 to 298. $50.0M New build
Dec 10, 2014 Building Permit Related (DR) Drain - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 Open
Jul 11, 2014 Backflow Prevention Devices (Water only) Proposal to install a backflow prevention device in the basement mechanical room of a 4 Story Apartment Building. $3K Closed
Feb 27, 2014 New Building REVISION: Reducing number of suites from 336 to 335. Suites 3301, 3302 and 3303 combined into two suites, 3301 and 3302.(Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 329 units plus 7 units on podium TOTAL UNITS 336, two levels of below grade parking and three levels of above New build
Jan 30, 2014 Partial Permit - Structural Framing Part Permit - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 Closed
Nov 21, 2013 Electromagnetic Locks (10) Maglocks to (2) levels of underground parking and (4) levels of above grade residential. Phase 2, Tower B $5K Open
Nov 8, 2013 Partial Permit - Shoring Part Permit - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 Closed
Nov 8, 2013 Partial Permit - Foundation Part Permit - Construct new (29) storey hi-rise, 278 units and (2) levels underground garage Bldg C Phase 3 Closed
Mar 21, 2013 Sales Pavilions Temporary sales pavilion for site of future condos and townhouses. Revised to show sound wall on west side of pavillion. Closed
Feb 21, 2013 Building Permit Related(MS) HVAC - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. Closed
Jan 17, 2013 Building Permit Related(PS) Plumbing - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. Closed
Oct 16, 2012 Electromagnetic Locks Installation of 3 maglocks $5K Closed
Oct 15, 2012 New Building Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. TOWNHOUSES NOT PART OF THIS PERMIT Revision #1: Revision of (2) stage fire alarm system to single stage New build
Jul 26, 2012 Partial Permit - Structural Framing Part Permit - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. Open
Apr 27, 2012 Building Permit Related(MS) HVAC - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Closed
Apr 23, 2012 Partial Permit - Structural Framing Part Permit - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Open
Apr 13, 2012 Unspecified This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 2746171 Closed
Feb 23, 2012 Building Permit Related(PS) Conditional Permit - Plumbing - Proposal to construct Phase 1 of 3-phase project: 3 storey back to back townhouse block W4 with 16 residential units. Closed
Feb 23, 2012 Building Permit Related(MS) Conditional Permit - HVAC - Proposal to construct Phase 1 of 3-phase project: 3 storey back to back townhouse block W4 with 16 residential units. Closed
Feb 23, 2012 Building Permit Related(PS) Conditional Permit - Plumbing - Proposal to construct Phase 1 of 3-phase project: 3 storey combined back to back townhouse block (W1, W2, W3) with 52 residential units. Closed
Feb 23, 2012 Building Permit Related(MS) Conditional Permit - HVAC - Proposal to construct Phase 1 of 3-phase project: 3 storey combined back to back townhouse block (W1, W2, W3) with 52 residential units. Closed
Feb 23, 2012 Building Permit Related(PS) Conditional Permit - Plumbing - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Closed
Feb 21, 2012 Unspecified This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 2747534 Closed
Feb 21, 2012 Unspecified This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 2747533 Closed
Jan 30, 2012 New Building Conditional Permit - Proposal to construct Phase 1 of 3-phase project: 3 storey back to back townhouse block W4 and W5 with 16 residential units. New build
Jan 30, 2012 New Building Conditional Permit - Proposal to construct Phase 1 of 3-phase project: 3 storey combined back to back townhouse block (W1, W2, W3, W6) with 52 residential units. New build
Dec 20, 2011 Partial Permit - Foundation Part Permit - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. Closed
Jul 7, 2011 Inside and Outside Drains Drain - (Phase 2 of 3, Tower B) Proposed new 35 storey apartment building with 336 units, two levels of below grade parking and three levels of above grade parking. Open
May 4, 2011 Partial Permit - Shoring Part Permit - Shoring along the east property line. Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Closed
May 4, 2011 Partial Permit - Foundation Part Permit - Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Closed
May 4, 2011 Inside and Outside Drains Drain - Site services for Proposal to construct Phase 1 of 3-phase project: 22 storey apartment building (Tower 'A') with 216 residential units with (1) level of underground and (3) levels above grade parking. Also for townhouses (68 units) on permits 10-286862 and 10-286867 $27.0M Open
Jan 10, 2011 Demolition Proposed demolition of existing highrise hotel building. Demolition
Mar 25, 2010 Building Permit Related(PS) Plumbing - Temporary sales pavilion for site of future condos and townhouses 2 barrier free washrooms, staff lunch room fixtures Closed

The 40 most recent of 43 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
43
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-420