thepermitmap

Street · 2384 of 8,565 by permit count

Building permits on Sudbury St

The City of Toronto has 79 building permits on record for Sudbury St, going back to 1998. Those permits created 711 homes and removed 0, a net change of +711. Declared construction value totals $81.5M. The most recent permit was issued Feb 5, 2026 at 180 Sudbury St.

Permits on record
791998–2026
Declared construction value
$81.5Mas filed, not adjusted
Homes created
711dwelling units
Homes removed
0net +711

Permits issued per year

20002026 (part year)

Most common work

  • Fire Damage12 · 15%
  • Building Permit Related(PS)10 · 13%
  • Interior Alterations9 · 11%
  • Building Permit Related(MS)8 · 10%
  • Unknown6 · 8%
  • Other(PS)5 · 6%
  • Building Permit Related (DR)2 · 3%
  • Backflow Prevention Devices (Water only)2 · 3%
  • Fire Alarm2 · 3%
  • Other(BA)2 · 3%
  • New Building2 · 3%
  • Piping: SFD/Semi2 · 3%

Structures worked on

  • Apartment Building35 · 44%
  • SFD - Townhouse7 · 9%
  • Stacked Townhouses6 · 8%
  • Unknown6 · 8%
  • Other3 · 4%
  • Multiple Unit Building3 · 4%
  • Art Gallery3 · 4%
  • Commercial3 · 4%
  • Dry Cleaning Depot3 · 4%
  • Fitness Centre3 · 4%
  • 3+ Unit - Townhouse2 · 3%
  • Multiple Use/Non Residential1 · 1%

Where this street runs

Little Portugal 41 permits
West Queen West 37 permits

Most recent permits

Issued Work What was filed Value Status
Feb 5, 2026 Fire Alarm Addition of new fire alarm devices & control relays for CSA B44 elevator modernization $54K Open
Dec 30, 2025 Building Permit Related(MS) HVAC - Proposal for interior alterations to change shell unit into a proposed art gallery. Unit M109. Open
Dec 30, 2025 Interior Alterations Proposal for interior alterations to change shell unit into a proposed art gallery. Unit M109. $50K Open
Dec 30, 2025 Building Permit Related(PS) Plumbing - Proposal for interior alterations to change shell unit into a proposed art gallery. Unit M109. Open
Dec 24, 2025 Building Permit Related(MS) HVAC - Proposal to alter the floor structure to infill the pool. Open
Oct 24, 2025 Other(FS) Proposal to install a new fire alarm system and control relays for elevatior modernization. $54K Closed
Aug 7, 2025 Interior Alterations Proposal to alter the floor structure to infill the pool. $50K Open
Jun 17, 2025 Other(PS) Proposal to replace kitec plumbing. $6K Closed
Dec 9, 2022 Other(PS) Replacement of insuite kitec domestic piping $4K Closed
Sep 7, 2022 Piping: Other Buildings REPLACEMENT OF IN-SUITE KITEC DOMESTIC WATER PIPING $5K Closed
Aug 15, 2022 Electromagnetic Locks Proposal to install one electromagnetic lock in the existing apartment building. $5K Open
Feb 17, 2022 Other(PS) Proposal to remove and replace the existing kitec plumbing including all existing fixtures. $20K Closed
Nov 30, 2021 Demolition Demolition of a two-storey building to the topside of the foundation. Disconnection of watermain and sewers at property line. For future pedestrian access tower for King-Liberty SmartTrack Station Demolition
Mar 17, 2021 Other(PS) Proposal to replace the Kitec water distribution piping in an existing townhouse unit within a larger complex - UNIT 1801 $9K Closed
Dec 8, 2020 Fire Damage STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. Closed
Dec 8, 2020 Fire Damage STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. Open
Dec 8, 2020 Fire Damage STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. Open
Dec 4, 2020 Fire Damage STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. Open
Aug 13, 2020 Building Permit Related(PS) Plumbing - NEW PARTITION WALL CREATING TWO BEDROOMS FROM EXISTING ONE BEDROOM. RENOVATION OF EXISTING MASTER BATHROOM. Closed
Aug 10, 2020 Interior Alterations NEW PARTITION WALL CREATING TWO BEDROOMS FROM EXISTING ONE BEDROOM. RENOVATION OF EXISTING MASTER BATHROOM. $40K Closed
Nov 29, 2019 Piping: Other Buildings New plumbing layout for an exisitng bathroom - drain added for new shower. $2K Closed
Aug 12, 2019 Piping: SFD/Semi replace kitec watermains with 1" Uponor Pex pipe $263K Closed
Feb 23, 2018 Piping: SFD/Semi Proposal to replace KITEC Piping within townhouse units on properties 1-47 Sudbury Street. $510K Open
Nov 10, 2017 Interior Alterations Interior alterations 1-INTERIOR RENO TO HAIR SALON (Personal Grooming Establishment)2-HVAC PLAN3-PLUMBING-ADD 6 FIXTURES $40K Open
Nov 9, 2017 Building Permit Related(PS) Plumbing - Interior alterations 1-INTERIOR RENO TO HAIR SALON2-HVAC PLAN3-PLUMBING-ADD 6 FIXTURES Open
Nov 9, 2017 Building Permit Related(MS) HVAC - Interior alterations 1-INTERIOR RENO TO HAIR SALON2-HVAC PLAN3-PLUMBING-ADD 6 FIXTURES Open
Aug 24, 2017 Other(PS) In suite kitec plumbing replacement. $5K Closed
Mar 14, 2017 Temporary Structures Proposal to erect a temporary structure at the front of exiting commerical building for "House of Vans" event. Mar 28-April 2/2017. Closed
Jan 30, 2017 Building Permit Related(PS) Plumbing - Construct washroom enlargement on thrid floor Closed
Dec 28, 2016 Interior Alterations Construct washroom enlargement on thrid floor $25K Closed
Nov 3, 2016 Building Permit Related(PS) Plumbing - Interior alterations to drycleaners - Nicee Drycleaner Closed
Nov 3, 2016 Building Permit Related(MS) HVAC - Interior alterations to drycleaners - Nicee Drycleaner Closed
Oct 26, 2016 Interior Alterations Interior alterations to drycleaners - Nicee Drycleaner $150K Closed
Sep 23, 2015 Interior Alterations Proposal to open existing concrete firewall on ground floor and install new vertical platform lift with fire door installed in firewall. $63K Open
Sep 23, 2015 Building Permit Related(PS) Plumbing - Proposal to open existing concrete firewall on ground floor and install new vertical platform lift with fire door installed in firewall. Open
Apr 27, 2015 Backflow Prevention Devices (Water only) Backflow preventor installation $15K Open
Sep 9, 2014 Sprinklers add sprinkler system to basement, first and second floors $28K Closed
Dec 19, 2013 New Building PHASE 2 - Proposal to construct a 8 sty tower with 135 residential units. See PHASE 1 - 08 183862. $11.0M New build
Jul 19, 2012 Building Permit Related(PS) Plumbing - Proposal for interior alterations to add a washroom in the basement of existing SFD-townhouse (unit 2807). Open
Jul 19, 2012 Interior Alterations Proposal for interior alterations to add a washroom in the basement of existing SFD-townhouse (unit 2807). $5K Open

The 40 most recent of 79 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
79
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-618