thepermitmap

Street · 6139 of 8,565 by permit count

Building permits on Stonehouse Cres

The City of Toronto has 15 building permits on record for Stonehouse Cres, going back to 2001. Declared construction value totals $260K. The most recent permit was issued Feb 23, 2022 at 6 Stonehouse Cres.

Permits on record
152001–2022
Declared construction value
$260Kas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20012022 (part year)

Most common work

  • Interior Alterations4 · 27%
  • Building Permit Related(PS)3 · 20%
  • Garage2 · 13%
  • Building Permit Related(MS)2 · 13%
  • Multiple Projects1 · 7%
  • Back Water Valve (Sewer only)1 · 7%
  • Addition(s)1 · 7%
  • Fixtures/Roof Drains: SFD1 · 7%

Structures worked on

  • SFD - Detached14 · 93%
  • SFD - Semi-Detached1 · 7%

Most recent permits

Issued Work What was filed Value Status
Feb 23, 2022 Interior Alterations Rev 02 - main floor washroom and shower demo, relocate vanity, toilet and kitchen sink.Interior renovations to remove columns on main floor Closed
Feb 15, 2022 Building Permit Related(PS) Plumbing - Interior renovations to remove columns on main floor Closed
Nov 10, 2021 Multiple Projects Addition to extend front entryand partial addition on second floor, new front covered porch and interior alterations $75K Open
May 11, 2021 Back Water Valve (Sewer only) install a BWV Closed
Feb 10, 2021 Interior Alterations Proposed Interior Alterationsat to the existing upper floor master bedroom and bedroom #2 ADD an ensuite, relocate closets and rearrange main bath toilet and sink. $35K Open
Feb 12, 2016 Garage New detached garage in rear yard $40K Closed
Aug 31, 2011 Building Permit Related(MS) HVAC - Proposal for interior alterations to all floors of an existing 3 storey SFD-detached dwelling. Closed
Jul 20, 2011 Building Permit Related(PS) Plumbing - Proposal for interior alterations to all floors of an existing 3 storey SFD-detached dwelling. Closed
Jul 20, 2011 Interior Alterations Proposal for interior alterations to all floors of an existing 3 storey SFD-detached dwelling. $50K Closed
Jun 30, 2008 Fixtures/Roof Drains: SFD Proposal to install 1 floor drain in the basement. SFD. $1K Closed
Feb 8, 2008 Building Permit Related(PS) Plumbing - Complete renovation of first floor: removal of main-floor kitchen to restore single-family use; new beams supporting first and second floors, new columns and pad footings; new drywall and insulation on main floor exterior walls; replace stairs from first to second floor Closed
Aug 20, 2007 Interior Alterations Complete renovation of first floor: removal of main-floor kitchen to restore single-family use; new beams supporting first and second floors, new columns and pad footings; new drywall and insulation on main floor exterior walls; replace stairs from first to second floor $9K Closed
Oct 14, 2003 Garage construct masonry garage at rear of property - lane access $15K Closed
Oct 24, 2001 Building Permit Related(MS) Extend ductwork from existing gas furnace with air conditioning for front addition. cost incl. 01 168197 Closed
Sep 20, 2001 Addition(s) construct 2 storey addition at front $35K Closed

The 15 most recent of 15 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
15
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-305