Street · 3661 of 8,565 by permit count
Building permits on Skymark Dr
The City of Toronto has 42 building permits on record for Skymark Dr, going back to 1997. Declared construction value totals $3.9M. The most recent permit was issued Aug 23, 2024 at 65 Skymark Dr.
- Permits on record
- 421997–2024
- Declared construction value
- $3.9Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002024 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 23, 2024 | Other(BA) | Proposed localized building envelope, balcony repairs and miscellaneous repair on main roof. | $500K | Closed |
| Dec 1, 2022 | Sprinklers | Modified sprinlker system at P-2 parking level above garage bin and install sprinkler on ground floor lobby area. | $2K | Open |
| Sep 15, 2022 | Electromagnetic Locks | Proposal to install a maglock (door with door opener) in an existing residential condo. | $2K | Open |
| Jul 5, 2022 | Fire Alarm | Replacement of existing fire alarm control panel. Al field devices and zoning to remain unchanged. | $7K | Open |
| Dec 26, 2021 | Interior Alterations | Installation of new glass door and side latch between lower level lobby and elevator lobby in P1 level lobby. New door is secured with mag lock system | $4K | Open |
| May 4, 2021 | Interior Alterations | Proposal for concrete repairs, waterproofing, joint expansion, and roof slab waterproofing. | $234K | Closed |
| Jan 8, 2021 | Sprinklers | Proposed modified sprinkler system | $2K | Open |
| Jun 22, 2020 | Sprinklers | PROPOSED: LOBBY TO BE SPRINKLERED AS PER FIRE DEPARTMENT REQUIREMENT | $5K | Open |
| May 24, 2019 | Other(BA) | Proposal for localized concrete floor slab repair and waterproofing to the compactor room of the existing Apartment building. | $100K | Closed |
| Oct 1, 2018 | Fire Alarm | Proposal to replace existing fire alarm panel with a new panel in existing Apartment Building. | $68K | Closed |
| Apr 17, 2018 | Garage Repair/Reconstruction | Proposal for parking garage concrete repairs to levels P2 and P3 in existing apartment building. | $250K | Closed |
| Jul 14, 2016 | Other(BA) | Proposal for localized concrete repair to podium deck. | $50K | Open |
| Jul 24, 2015 | HVAC: Other Group C Buildings | MOVING KITCHEN TO BREAKFAST AREA, DESIGN, AND CERTIFIED MECHANICAL / PLUMBING ARE ATTACHED | $100K | Closed |
| Jul 24, 2015 | Piping: Other Buildings | MOVING KITCHEN TO BREAKFAST AREA, DESIGN, AND CERTIFIED MECHANICAL / PLUMBING ARE ATTACHED | $100K | Open |
| Jul 14, 2015 | Garage Repair/Reconstruction | Localized garage reinforced concrete ledge beam repairs (5m2) | $120K | Open |
| May 21, 2015 | Fixtures/Roof Drains: Other | Alter existing kitchen/bathrooms, replace existing plumbing fixtures with new in Suite 2303 | $20K | Closed |
| Mar 19, 2015 | Garage Repair/Reconstruction | Parking garage roof slab and expansion joint - concrete repairs. | $171K | Open |
| Jun 12, 2014 | Balcony/Guard Repairs | Repairs to 8 balconies | $72K | Open |
| Mar 24, 2014 | Garage Repair/Reconstruction | Proposal for concrete repair in portiion of parking garage in exisiting apartment building. | $188K | Open |
| May 14, 2013 | Garage Repair/Reconstruction | Under ground Garage Repair/Reconstruction MTCC No# 661 & 1227 | $60K | Open |
| Apr 8, 2013 | Garage Repair/Reconstruction | Exposed slab edge repair to existing apartment building | $100K | Closed |
| Nov 20, 2012 | Fire Alarm | Replace fire alarm panel on ground floor and on the level one of the underground parking garage | $55K | Closed |
| Aug 28, 2012 | Fixtures/Roof Drains: Other | Add two new fixtures to unit 301 | $2K | Open |
| Oct 13, 2011 | Garage Repair/Reconstruction | Revision - to limit the scope of work | — | Closed |
| Apr 15, 2011 | Garage Repair/Reconstruction | Repairs to garage roof slabs on ground floor and parking level 1 for two apartment buildings linked by parking garage | $117K | Open |
| Apr 12, 2011 | Backflow Prevention Devices (Water only) | Four inch backflow preventor installed on B1 Level | $6K | Closed |
| Apr 12, 2011 | Backflow Prevention Devices (Water only) | Four inch backflow preventor installed on P1 Level | $6K | Closed |
| Sep 28, 2010 | Garage Repair/Reconstruction | Intermediate slab repair in garage | $200K | Closed |
| Sep 17, 2010 | Multiple Projects | Exterior concrete repair to balcony balustrade, exterior concrete shearwalls, and concrete columns. Repair to concrete balconies | $478K | Open |
| Jul 27, 2010 | Backflow Prevention Devices (Water only) | Installation of new backflow preventer. | $6K | Closed |
| Jun 30, 2010 | Garage Repair/Reconstruction | Expansion joint repair and water proofing - Podium Deck | $40K | Closed |
| Mar 10, 2010 | Backflow Prevention Devices (Water only) | Install one new Backflow Prevention Devices | $5K | Closed |
| Mar 10, 2010 | Backflow Prevention Devices (Water only) | Install one new Backflow Prevention Devices | $5K | Closed |
| Jan 11, 2010 | Other(BA) | Repair retaining wall | $350K | Closed |
| Oct 6, 2009 | Other(BA) | Engering structural repair to the side of condo building. | $35K | Closed |
| Sep 30, 2008 | Other(FS) | Replace fire alarm control panel / annunciation panel and emergency voice communication system - Main entry vestibule | $15K | Closed |
| Jul 29, 2008 | Fire Alarm | Replacement of existing fire alarum panel only. | $80K | Closed |
| Apr 29, 2003 | Garage Repair/Reconstruction | EXPANSION JOINT AND MEMBRANE REPAIRS | $60K | Closed |
| Apr 26, 2000 | Alteration to Existing Building | 112 BALCONY REPAIRS TO AN EXISTING CONDO. | $300K | Closed |
| Mar 30, 1998 | New Building | APT SUPERSTRUCTURE | — | New build |
The 40 most recent of 42 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.