Street · 5204 of 8,565 by permit count
Building permits on Sherway Gardens Rd
The City of Toronto has 22 building permits on record for Sherway Gardens Rd, going back to 2010. Those permits created 331 homes and removed 0, a net change of +331. Declared construction value totals $30.2M. The most recent permit was issued Feb 14, 2024 at 225 Sherway Gardens Rd.
- Permits on record
- 222010–2024
- Declared construction value
- $30.2Mas filed, not adjusted
- Homes created
- 331dwelling units
- Homes removed
- 0net +331
Permits issued per year
20102024 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Feb 14, 2024 | Backflow Prevention Devices (Water only) | Proposal to install backflow preventer. | $10K | Closed |
| Sep 17, 2019 | Other(BA) | Proposed removal and disposal of the interior fountain overburden, fountain slab and waterproofing (everything to structural slab). | $5K | Closed |
| Oct 7, 2015 | Fire Damage | Permit to repair fire damage - Unit #1509 | — | Closed |
| Jun 19, 2015 | Backflow Prevention Devices (Water only) | Install permise backflow valve | $13K | Closed |
| Jun 19, 2015 | Backflow Prevention Devices (Water only) | Install premise backflow valve | $16K | Closed |
| Aug 12, 2014 | Fire Damage | Fire damage repair to apartment unit 907. | — | Open |
| Aug 15, 2013 | Building Permit Related(MS) | Revision 01 - Proposal to get ride of retail area and replace with 8 additional units.(HVAC - To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking.) | — | Open |
| Aug 15, 2013 | Building Permit Related(PS) | Revision 01 - Proposal to get ride of retail area and replace with 8 additional units.(Plumbing - To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking.) | — | Open |
| Aug 15, 2013 | New Building | Revision 01 - Proposal to get ride of retail area and replace with 8 additional units. (To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking.)NOTE; NO RETAIL CREDIT FOR EDC AND DC CHARGES SINCE | — | New build |
| May 24, 2013 | Electromagnetic Locks | To install 7 Electromagnetic Locks to new Condominium Apartment Building. | $7K | Closed |
| May 14, 2013 | Sprinklers | Proposal to alter sprinkler system on ground floor.(tower "D") | $100K | Open |
| Mar 6, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Phase 2- Tower "C" - 29 stories, 323 units condo building sitting on foundation and u/g garage of tower "D". | — | Closed |
| Mar 6, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking. | — | Closed |
| May 14, 2012 | Building Permit Related(MS) | HVAC - Phase 2- Tower "C" - 29 stories, 323 units condo building sitting on foundation and u/g garage of tower "D". | — | Open |
| May 7, 2012 | New Building | Phase 2- Tower "C" - 29 stories, 323 units condo building sitting on foundation and u/g garage of tower "D". | $30.0M | New build |
| Feb 10, 2012 | Building Permit Related(PS) | Plumbing - Phase 2- Tower "C" - 29 stories, 323 units condo building sitting on foundation and u/g garage of tower "D". | — | Open |
| Jan 20, 2012 | Partial Permit - Structural Framing | Part Permit - Phase 11 - Tower 3 - 29 stories, 323 units condo building sitting on foundation and u/g garage of tower 4. | — | Closed |
| May 9, 2011 | Partial Permit - Structural Framing | Part Permit - To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking. Structural framing | — | Closed |
| May 9, 2011 | Partial Permit - Foundation | Part Permit - To construct new 23-storey residential condominium building (bldg. D) containing 270 units retail area on ground floor and three levels of underground parking. | — | Closed |
| Apr 28, 2011 | Building Permit Related (DR) | Drain - To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking. | — | Open |
| Jan 26, 2011 | Inside and Outside Drains | Site Services - To construct new 23-storey residential condominium building (bldg. D) containing 270 units, retail area on ground floor and three levels of underground parking. | — | Open |
| Dec 17, 2010 | Partial Permit - Shoring | Part Permit - To construct new 23-storey residential condominium building (bldg. D) containing 270 units retail area on ground floor and three levels of underground parking. | — | Closed |
The 22 most recent of 22 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.