Street · 1048 of 8,567 by permit count
Building permits on Sherway Dr
The City of Toronto has 177 building permits on record for Sherway Dr, going back to 1999. Declared construction value totals $73.6M. The most recent permit was issued May 20, 2026 at 150 Sherway Dr.
- Permits on record
- 1771999–2026
- Declared construction value
- $73.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| May 20, 2026 | Building Permit Related (DR) | Revision 03: New 200mm watermain and water connection, including meter and check valve in accordance with City standards, which is located east of the existing Dorothy Ley Hospice Building (220 Sherway)Drain - Proposal for construction of new 9-storey Patient Tower,1-Storey Circulation Link connecte | — | Open |
| Mar 13, 2026 | Electromagnetic Locks | Proposal to install Maglock/Magnetic locks at the interior and exterior doors at new patient tower building, Central Utility Plan and Tunnel area. | $120K | Open |
| Mar 2, 2026 | Fire Alarm | Proposal to install fire alarm devices for elevator recall in an existing hospital. | $50K | Closed |
| Jan 16, 2026 | Fire Alarm | Proposal to replace existing fire alarm panel and devices. | $60K | Closed |
| Sep 25, 2025 | Interior Alterations | Proposal for interior alterations to install prefabricated work room | $15K | Closed |
| Sep 11, 2025 | Building Permit Related(PS) | Plumbing Revision 01 - Revised Water Meter Strategy for New Patient Tower with same scope as for revision to CUP & Tunnels permit (22-219525) submitted 26 August---------------------------------------------------------------------------Plumbing - Proposal for construction of new 9-storey Patient Tow | — | Closed |
| Aug 27, 2025 | Building Permit Related(PS) | Rev 02: revised Water Meter Strategy. See cover letterRevision #01 - Revised Design of Circulation Tunnels linking the New Central Utility Plant (CUP), New Patient Tower and Existing Hospital.Plumbing - Proposal for construction of New 2 storey Central Utility Plant(Separate new 9-storey Patient Tow | — | Closed |
| Aug 13, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for construction of New 2 storey Central Utility Plant | — | Closed |
| May 16, 2025 | Sign Building Permit Related | 2 Wall Sign for Trillium Hospital - 'ENTRANCE 6' & 'ENTRANCE 5' | — | Open |
| Apr 25, 2025 | Site Service | Drain - Proposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trillium Health Centre | $43.4M | Open |
| Apr 15, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for construction of new 9-storey Patient Tower,1-Storey Circulation Link connected to the eixsiting hospital building. | — | Closed |
| Apr 14, 2025 | Demolition | Proposed demolition of existing Hospital Central Utility Plant (CUP) building- including services - and adjacent brick chimney and steel stack. | $200K | Demolition |
| Apr 2, 2025 | Sign Building Permit Related | 2 Wall Signs*****Trilliam Health Centre in Etobicoke***** | — | Closed |
| Mar 11, 2025 | Sign Building Permit Related | To erect and display 6 ground signs all displaying static copy. | — | Open |
| Feb 25, 2025 | Alternative Solution | In accordance with OBC Sentences 3.8.3.13.(1) and (3), the shower within the washroom facility of each patient room of the proposed hospital building is required to be designed for barrier-free accessibility. One of the requirements for a barrier-free shower is the provision of a hinged fold-down se | — | Closed |
| Jan 13, 2025 | Sign Building Permit Related | To erect and display two first party ground signs, illuminated and displaying static copy, both measuring 2.41m vertically by 1.44m horizontally, with overall height of 2.69m. Portion of ground sign #7 will contain two readograph displays changed electronically, measuring 0.15m x 0.43m each.***TRILL | — | Open |
| Dec 18, 2024 | Sprinklers | Proposed installation and modification of overhead wet sprinkler system to accommodate the renovation of and existing interior hospital building space. | $17K | Open |
| Oct 22, 2024 | New Building | REVISION No. 04 for RETAINING WALL / PERMANENT CAISSON WALL EXTENSION TO ZONE PW3.REVISION 03: Construction of Shoring related to CUP & TunnelsRevision 02: Permanent caisson wall shoring design package from shoring tradeRevistion 01: RESUBMISSION: SKETCHES FOR MINOR TOWER FOUNDATION REVISIONS AND SH | — | New build |
| Oct 7, 2024 | Building Permit Related(PS) | Plumbing - Architectural renovation/alteration of existing Nuclear Medicine Suite (incl. waiting room, washroom and staff area) into an MRI Suite, including associated waiting rooms, washroom and staff areas. Corresponding electrical, HVAC and plumbing to coordinate with proposed architectural renov | — | Closed |
| Oct 7, 2024 | Building Permit Related(MS) | HVAC - Architectural renovation/alteration of existing Nuclear Medicine Suite (incl. waiting room, washroom and staff area) into an MRI Suite, including associated waiting rooms, washroom and staff areas. Corresponding electrical, HVAC and plumbing to coordinate with proposed architectural renovatio | — | Closed |
| Oct 7, 2024 | Interior Alterations | Architectural renovation/alteration of existing Nuclear Medicine Suite (incl. waiting room, washroom and staff area) into an MRI Suite, including associated waiting rooms, washroom and staff areas. Corresponding electrical, HVAC and plumbing to coordinate with proposed architectural renovations | $150K | Closed |
| Aug 29, 2024 | Building Permit Related(PS) | Plumbing - Interior Alterations to existing group D suite | — | Open |
| Aug 8, 2024 | Interior Alterations | Interior Alterations to existing group D suite | $75K | Open |
| Aug 7, 2024 | Building Permit Related(MS) | Revision #01 - Revised Design of Circulation Tunnels linking the New Central Utility Plant (CUP), New Patient Tower and Existing Hospital.HVAC - Proposal for construction of New 2 storey Central Utility Plant(Separate new 9-storey Patient Tower,1-Storey Circulation Link and Renovation applications t | — | Open |
| Jul 31, 2024 | New Building | Revision #01 - Revised Design of Circulation Tunnels linking the New Central Utility Plant (CUP), New Patient Tower and Existing Hospital.1Proposal for construction of New 2 storey Central Utility Plant | — | New build |
| Jun 21, 2024 | New Building | REVISION 01: ADD WASHROOM and add an electrical transformer to feed the fire pumpProposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trillium Health Centre | — | New build |
| May 14, 2024 | Building Permit Related(PS) | REVISION 01: ADD WASHROOMPlumbing - Proposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trillium Health Centre | — | Open |
| May 14, 2024 | Building Permit Related(MS) | REVISION 01: ADD WASHROOMHVAC - Proposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trillium Health Centre | — | Open |
| Apr 24, 2024 | Interior Alterations | Revision 01 - Revised interior alterations Review in conjuction with the Alternative Solution 24-128290ALT AS--------------------------------------------------------------------Proposal for 188 m² of interior alterations at Dorothy Ley Hospice: existing space conversion to create two new bedrooms, f | — | Closed |
| Apr 4, 2024 | Sprinklers | Modification to existing sprinkler system by adding and relocating sprinkler heads to suit new tenant renovations. | $8K | Closed |
| Mar 25, 2024 | Interior Alterations | proposal for interior alterations to second floor to create a new pulmonary rehab training room and shared administration office. | $100K | Open |
| Mar 25, 2024 | Building Permit Related(MS) | HVAC - proposal for interior alterations to second floor to create a new pulmonary rehab training room and shared administration office. | — | Open |
| Mar 21, 2024 | Material Evaluation | Proposed Alternative Solution to provide smoke exhaust system in lieu of a 1 h fire resistance rated fire separation in a B2 patient care compartment. Refer to Muniak Enterprises Inc report titled Alternative Solution for the Construction of Patient Care Fire Compartments in the Dorothy Ley Hospice. | — | Closed |
| Feb 23, 2024 | Building Permit Related(MS) | HVAC - Proposal for construction of new 9-storey Patient Tower,1-Storey Circulation Link connected to the eixsiting hospital building. ( Separate New 2 storey Central Utility Plant and Renovation applications to follow) | — | Open |
| Feb 5, 2024 | Multiple Projects | REVISION 01: TEMPORARY LOADING & WASTE MANAGEMENT - Truck Loading BaysProposal for renovation to existing building | — | Open |
| Nov 16, 2023 | Building Permit Related(MS) | HVAC - Proposal for 188 m² of interior alterations at Dorothy Ley Hospice: existing space conversion to create two new bedrooms, family room, staff and medication room, resident shower room, nutrition alcove, and universal washroom. | — | Closed |
| Nov 10, 2023 | Building Permit Related(PS) | Plumbing - Proposal for 188 m² of interior alterations at Dorothy Ley Hospice: existing space conversion to create two new bedrooms, family room, staff and medication room, resident shower room, nutrition alcove, and universal washroom. | — | Closed |
| Aug 17, 2023 | Building Permit Related(MS) | HVAC - Proposal for renovation to existing building | — | Open |
| Aug 16, 2023 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for renovation to existing building | — | Closed |
| Aug 16, 2023 | Building Permit Related(PS) | Plumbing - Proposal for renovation to existing building | — | Open |
The 40 most recent of 177 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.