Street · 597 of 8,565 by permit count
Building permits on Sentinel Rd
The City of Toronto has 288 building permits on record for Sentinel Rd, going back to 1996. Those permits created 59 homes and removed 0, a net change of +59. Declared construction value totals $34.4M. The most recent permit was applied for Jul 22, 2026 at 0 SENTINEL RD.
- Permits on record
- 2881996–2026
- Declared construction value
- $34.4Mas filed, not adjusted
- Homes created
- 59dwelling units
- Homes removed
- 0net +59
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 22, 2026 | Sign Building Permit Related | 1 Ground Sign | — | Closed |
| Jun 15, 2026 | Building Permit Related(MS) | Revision 2: Revision to change HVAC designHVAC - Proposal to convert existing single family dwelling to fourplex, with basement walkout. | — | Open |
| May 1, 2026 | Solar Collector | Proposal for relocation of 15 solar panels of existing photovoltaic system on the rooftop due to changes to the roof during recent roof replacement. | $11K | Open |
| Apr 1, 2026 | Multiple Projects | A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAIL. PROPOSED PROJECT ALSO INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS. | $5.0M | Open |
| Apr 1, 2026 | Building Permit Related (DR) | Drain - PROPOSED PROJECT INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS, A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAIL | — | Open |
| Apr 1, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED PROJECT INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS, A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAI | — | Open |
| Apr 1, 2026 | Building Permit Related(MS) | HVAC - PROPOSED PROJECT INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS, A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAIL | — | Open |
| Apr 1, 2026 | Site Service | Drain - PROPOSED PROJECT INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS, A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAIL | $5.0M | Open |
| Nov 14, 2025 | Interior Alterations | Proposal for alterations to existing secondary school. | $500K | Open |
| Apr 24, 2025 | Fire Alarm | Replacement of Fire Alarm Control Panel and remote annunciator. | $25K | Closed |
| Apr 14, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations and convert dwelling to 2 unit dwelling. | — | Open |
| Apr 14, 2025 | Interior Alterations | Proposal for interior alterations and convert dwelling to 2 unit dwelling. | $40K | Open |
| Feb 20, 2025 | Re-Roofing/Re-Cladding | Proposal for replacement of the existing siporex roof deck and roof assembly with a new steel roof deck and new roof assembly. | $8.5M | Open |
| Jan 14, 2025 | Second Suite (New) | Proposed legal basement | $20K | Open |
| Jan 9, 2025 | Interior Alterations | Proposal for interior alterations to convert existing dwelling to a rooming house.See also 24 237813 RMH 00 IV. | $40K | Closed |
| Jan 6, 2025 | Second Suite (New) | Proposed legal basement | $20K | Closed |
| Dec 30, 2024 | Multiple Projects | Proposal to convert existing single family dwelling to fourplex, with basement walkout. | $45K | Open |
| Dec 18, 2024 | Interior Alterations | Proposal for Fire Damage Repairs - remove and replace interior finishes - 14th floor (unit 1412, 1413 and common area) - 12th floor (unit 1212). | — | Open |
| Nov 8, 2024 | Other(SR) | Proposed installation of rooftop solar panels | $25K | Closed |
| Oct 4, 2024 | Back Water Valve (Sewer only) | Proposal for backwater valve installation (sewer only) | — | Closed |
| Sep 12, 2024 | Back Water Valve (Sewer only) | Backwater valve Installation | — | Open |
| Apr 15, 2024 | Second Suite (New) | Designing a basement second unit dwelling with proposed below grade entrance at the front as perOBC. | $50K | Closed |
| Apr 15, 2024 | Building Permit Related(PS) | Plumbing - Designing a basement second unit dwelling with proposed below grade entrance at the front as perOBC.Also applying for plumbing and mechanical permit. | — | Closed |
| Mar 26, 2024 | Second Suite (New) | Interior renovation in a house to create a new secondary dwelling unit (basement dwelling). | $75K | Closed |
| Aug 8, 2023 | Other(SR) | Proposed Rooftop Solar Panel Installation to the existing single family dwelling. | $23K | Closed |
| May 4, 2023 | Multiple Projects | Basement second unit dwelling with proposed below grade entrance at the front as per OBC. [[Note for Examiner: There is an error in the address given in the Application Form. Applicant has been informed of it and asked to provide a corrected Form]] | $50K | Closed |
| May 4, 2023 | Building Permit Related(PS) | Plumbing - Basement second unit dwelling with proposed below grade entrance at the front as per OBC. | — | Closed |
| Mar 24, 2023 | Garage Repair/Reconstruction | Garage column bases and beam repair | $252K | Open |
| Nov 10, 2022 | Backflow Prevention Devices (Water only) | Propoed backflow preventor installation. | $3K | Closed |
| Oct 27, 2022 | Backflow Prevention Devices (Water only) | PREMISE ISOLATION BACKFLOW PREVENTOR INSTALLATION (x1) | $12K | Closed |
| Apr 22, 2022 | Interior Alterations | Proposal to construct interior alterations that include floor finishing and the replacement of existing ceilings. | $500K | Open |
| Jan 4, 2022 | Multiple Projects | Interior alterations to basement for second unit and basement entrance | $35K | Closed |
| Jan 4, 2022 | Building Permit Related(PS) | Plumbing - Interior alterations to basement for second unit and basement entrance | — | Open |
| Sep 1, 2021 | Second Suite (New) | Proposal to constaruct a basement 2nd suite | $70K | Open |
| Jul 9, 2021 | Building Permit Related(MS) | HVAC - Proposal for Roof Structural Repairs and Window Replacement to the existing Public School. | — | Closed |
| Jul 9, 2021 | Re-Roofing/Re-Cladding | Proposal for Roof Structural Repairs and Window Replacement to the existing Public School. | $1.2M | Closed |
| Mar 12, 2021 | Second Suite (New) | Proposed to constructe second unit in the basement of a semi detached dwelling. | $20K | Closed |
| Jan 14, 2021 | Sign Building Permit Related | The applicant has requested to erect one first party double-sided illuminated ground sign. The proposed signs displays both static copy and electronic readograph copy. The proposed sign is measuring 2.48 meters horizontally by 1.34 meters vertically at the height of 2.43 meters. The electronic reado | — | Closed |
| Aug 4, 2020 | Back Water Valve (Sewer only) | Proposal to install backwater valve for existing sfd-semi | — | Open |
| Aug 8, 2019 | Porch | Proposal for construction related to a rear patio | $5K | Closed |
The 40 most recent of 288 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.