Street · 1177 of 8,567 by permit count
Building permits on Rushbrooke Ave
The City of Toronto has 162 building permits on record for Rushbrooke Ave, going back to 1997. Those permits created 2 homes and removed 0, a net change of +2. Declared construction value totals $3.0M. The most recent permit was applied for Aug 24, 2026 at 11 Rushbrooke Ave.
- Permits on record
- 1621997–2026
- Declared construction value
- $3.0Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 0net +2
Permits issued per year
20032026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 24, 2026 | Multiple Projects | Proposal to enclose the existing front porch and enlarge the existing windows on the ground and second floors | $20K | Open |
| Jul 6, 2026 | Interior Alterations | Proposed alteration to enlarge windows and doors openings. | $5K | Open |
| Jun 9, 2026 | Building Permit Related(PS) | Plumbing - Proposed load bearing wall removal and interior alterations. | — | Open |
| Jun 5, 2026 | Interior Alterations | Proposed load bearing wall removal and interior alterations. | $200K | Open |
| May 12, 2026 | Interior Alterations | Proposed interior alterations to the existing two-storey dwelling | $20K | Open |
| Apr 22, 2026 | Building Permit Related (DR) | Drain - PROPOSED INTERIOR ALTERATIONS, AND BASEMENT UNDERPINNING, WITH ENCLOSURE OF EXISTING FRONT PORCH, AND NEW REAR ONE-STOREY ADDITION (26 M2) WITH 2ND FLOOR BALCONY ABOVE | — | Closed |
| Apr 22, 2026 | Multiple Projects | PROPOSED INTERIOR ALTERATIONS, AND BASEMENT UNDERPINNING, WITH ENCLOSURE OF EXISTING FRONT PORCH, AND NEW REAR ONE-STOREY ADDITION (26 M2) WITH 2ND FLOOR BALCONY ABOVE | $10K | Open |
| Apr 22, 2026 | Party Wall Admin Permits | Proposed party wall admin permit related to 26 103416 | — | Open |
| Apr 22, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS, AND BASEMENT UNDERPINNING, WITH ENCLOSURE OF EXISTING FRONT PORCH, AND NEW REAR ONE-STOREY ADDITION (26 M2) WITH 2ND FLOOR BALCONY ABOVE | — | Open |
| Apr 20, 2026 | Back Water Valve (Sewer only) | building trap and back water valve | — | Closed |
| Mar 27, 2026 | Accessory Building(s) | Rev 02: revision to shed & carport, removal of insulation, concealed gutter and simplified carport post designRev 01: revision to remove carport from scopeDetached shed and carport in the rear yard | — | Open |
| Nov 25, 2025 | Back Water Valve (Sewer only) | Proposal to install a backwater valve. | — | Closed |
| Mar 17, 2025 | Building Permit Related(MS) | Revision 01: Proposal to revise upper floors removed from design, upper floor HVAC to remain. HRVs added to lower unit HVAC - Convert the existing basement to a second dwelling unit, underpinning to lower the basement, rear deck and basement walkout, new basement openings. | — | Closed |
| Feb 5, 2025 | Back Water Valve (Sewer only) | Proposal for a backwater valve installation at the existing single family dwelling. | — | Closed |
| Nov 14, 2024 | Multiple Projects | Convert the existing basement to a second dwelling unit, underpinning to lower the basement, rear deck and basement walkout, new basement openings. | $90K | Closed |
| Nov 14, 2024 | Building Permit Related(PS) | Plumbing - Convert the existing basement to a second dwelling unit, underpinning to lower the basement, rear deck and basement walkout, new basement openings. | — | Closed |
| Nov 14, 2024 | Building Permit Related (DR) | Drain - Convert the existing basement to a second dwelling unit, underpinning to lower the basement, rear deck and basement walkout, new basement openings. | — | Closed |
| Nov 1, 2024 | Building Permit Related(MS) | REV 01 HVAC - Proposal for addition, interior alterations and underpinning | — | Closed |
| Oct 16, 2024 | Multiple Projects | Convert the existing basement to a second dwelling unit, underpinning to lower the basement, rear deck and basement walkout, new basement openings. | $90K | Closed |
| Oct 16, 2024 | Building Permit Related (DR) | Drain - Convert the existing basement to a second dwelling unit, underpinning to lower the basement, rear deck and basement walkout, new basement openings. | — | Closed |
| Aug 15, 2024 | Back Water Valve (Sewer only) | Proposed installation of Backwater Valve on sanitary line. | — | Closed |
| May 28, 2024 | Interior Alterations | PROPOSAL: INTERIOR ALTERATIONS TO THE REAR ELEVATION | $10K | Open |
| May 9, 2024 | Interior Alterations | Proposal for interior alteration - new rear sliding door. | $10K | Closed |
| Apr 19, 2024 | Building Permit Related(MS) | HVAC - Proposal for basement underpinning and interior alteration to finish basement | — | Closed |
| Mar 21, 2024 | Party Wall Admin Permits | Administrative party wall permit for work at 46 Rushbrooke Ave | — | Closed |
| Mar 21, 2024 | Multiple Projects | Proposal for addition, interior alterations and underpinning | $300K | Closed |
| Mar 21, 2024 | Building Permit Related(PS) | Plumbing - Proposal for addition, interior alterations and underpinning | — | Closed |
| Feb 8, 2024 | Multiple Projects | Revision 02 - reconstruct rear additionREVISION 01: INTERIOR ALTERATION TO GROUND FLOOR ADDED TO SCOPEProposal for basement underpinning and interior altertion to finish basement | — | Closed |
| Nov 30, 2023 | Building Permit Related(PS) | REVISION 01: INTERIOR ALTERATION TO GROUND FLOOR ADDED TO SCOPEPlumbing - Proposal for basement underpinning and interior altertion to finish basement | — | Closed |
| Nov 7, 2023 | Building Permit Related (DR) | Drain - Proposal for basement underpinning and interior altertion to finish basement | — | Closed |
| Nov 7, 2023 | Party Wall Admin Permits | Proposal for administrative party wall permit for work related to 92 rushbrooke ave underpinning | $1K | Open |
| Oct 26, 2023 | Building Permit Related (DR) | Drain - PROPOSAL FOR BASEMENT UNDERPINNING (54 m2 AREA OF UNDERPINNING) TO THE EXISTING 2 STOREY DWELLING | — | Closed |
| Oct 26, 2023 | Underpinning | PROPOSAL FOR BASEMENT UNDERPINNING (54 m2 AREA OF UNDERPINNING) TO THE EXISTING 2 STOREY DWELLING | $250K | Closed |
| Oct 26, 2023 | Building Permit Related(PS) | Plumbing - PROPOSAL FOR BASEMENT UNDERPINNING (54 m2 AREA OF UNDERPINNING) TO THE EXISTING 2 STOREY DWELLING | — | Closed |
| Sep 12, 2023 | Back Water Valve (Sewer only) | Full Port maintenance Free Backwater Valve Installation with clean out on existing sanitary line inside of the house. | — | Closed |
| Sep 12, 2023 | Addition(s) | - Rebuild/Repair existing rear one storey addition | $200K | Closed |
| May 19, 2023 | Interior Alterations | Proposal interior alterations. | $100K | Closed |
| May 19, 2023 | Building Permit Related(PS) | Plumbing - Proposal to rebuild existing rear one storey addition | — | Closed |
| Sep 8, 2022 | Accessory Building(s) | Rev 01: carport and fence removed from scope of work | — | Closed |
| Mar 7, 2022 | Back Water Valve (Sewer only) | Proposal to install full port back water Valve | — | Closed |
The 40 most recent of 162 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.