Street · 3236 of 8,565 by permit count
Building permits on Resurrection Rd
The City of Toronto has 51 building permits on record for Resurrection Rd, going back to 2000. Those permits created 50 homes and removed 0, a net change of +50. Declared construction value totals $6.3M. The most recent permit was applied for Apr 18, 2023 at 92 Resurrection Rd.
- Permits on record
- 512000–2023
- Declared construction value
- $6.3Mas filed, not adjusted
- Homes created
- 50dwelling units
- Homes removed
- 0net +50
Permits issued per year
20002023 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Apr 18, 2023 | Piping: Other Buildings | Kitec water line replacement | $8K | Closed |
| May 4, 2022 | Piping: Other Buildings | Replacement of in-suite kitec piping | $5K | Open |
| Sep 15, 2021 | Building Permit Related(MS) | HVAC - Proposed reconfiguration of RCU credit union | — | Closed |
| Aug 17, 2021 | Interior Alterations | Proposed reconfiguration of credit union | $20K | Closed |
| Jul 22, 2021 | Piping: Other Buildings | Proposal for replacement of Insuite Kitec Domestic Water Piping. | $7K | Closed |
| Jul 21, 2021 | Piping: SFD/Semi | REPLACEMENT OF IN-SUITE KITEC DOMESTIC WATER PIPING | $10K | Closed |
| Jun 23, 2021 | Other(PS) | Proposal to replace the Kitec domestic water pipes in an SFD-townhouse as part of a larger complex. | $4K | Closed |
| Dec 7, 2020 | Interior Alterations | Interior alterations to add a new ATM security room | $30K | Open |
| Jul 8, 2020 | Balcony/Guard Repairs | Proposal for terrace waterproofing replacement, drainage improvements, EIFS repairs and guard and divider panel replacement. | $1.2M | Closed |
| Aug 27, 2019 | Interior Alterations | Proposal to install one slot window in existing exterior wall of place of worship. | $30K | Open |
| Aug 19, 2019 | Fire Alarm | Proposal for the replacement of the fire alarm panel. | $15K | Open |
| Nov 26, 2018 | Other(SR) | Rear terrace waterproofing and repair, new guard and divider panel installation. | $15K | Closed |
| Nov 26, 2018 | Other(SR) | Rear terrace waterproofing and repair, new guard and divider panel installation. | $15K | Closed |
| Jun 23, 2017 | Back Water Valve (Sewer only) | To install (1) Back Water Valve (Sewer only). | — | Open |
| Feb 4, 2016 | Back Water Valve (Sewer only) | To install (1) Back Water Valve (Sewer only). | — | Open |
| Sep 19, 2011 | Sign Building Permit Related | To erect and display one illuminated ground sign, containing two sign faces, each with static copy, at the south west corner of Bloor St. and Resurrection Rd. in conjunction with a Credit Union/Church located on the premises.**Resurrection Credit Union** | — | Closed |
| Nov 19, 2009 | Canopy w/o Enclosure | New Canopy / Portico - an accessory structure - Construct a new entrance canopy at the front of an existing nursing home, "Labdara Lithuanian Nursing Home". | $80K | Open |
| Jun 12, 2006 | Other(FS) | Disconnect the existing dry pipe sprinkler system in the attic, stairwell and penthouse and connect the existing penthouse and stairwell dry system to the existing wet system (attic will not to be sprinklered). | $1K | Open |
| Mar 27, 2003 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 45-49 BLK H - New Building | — | Open |
| Mar 27, 2003 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 40-44 BLK G - New Building | — | Open |
| Mar 27, 2003 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 35-39 BLK F - New Building | — | Open |
| Dec 18, 2002 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 16-23 BLK C - New Building | — | Open |
| Dec 18, 2002 | Building Permit Related(MS) | HVAC - Construction of townhouse units 56-61 BLK J - New Building | — | Open |
| Dec 18, 2002 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 8-15 BLK B - New Building | — | Open |
| Dec 18, 2002 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 24-29 BLK D - New Building | — | Open |
| Dec 18, 2002 | Building Permit Related(MS) | HVAC - Construction of townhouse Units 50-55 BLK I - New Building | — | Open |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 8-15 BLK B - New Building | — | Open |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 35-39 BLK F - New Building | — | Open |
| Aug 8, 2002 | New Building | Construction of townhouse Units 40-44 BLK G | $411K | New build |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 56-61 BLK J - New Building | — | Open |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 50-55 BLK I - New Building | — | Open |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 16-23 BLK C - New Building | — | Open |
| Aug 8, 2002 | New Building | Construction of townhouse Units 24-29 BLK D | $534K | New build |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 40-44 BLK G - New Building | — | Open |
| Aug 8, 2002 | New Building | Construction of townhouse Units 35-39 BLK F | $411K | New build |
| Aug 8, 2002 | New Building | Construction of townhouse Units 8-15 BLK B | $708K | New build |
| Aug 8, 2002 | Building Permit Related(PS) | Plumbing - Construction of townhouse Units 45-49 BLK H - New Building | — | Open |
| Aug 8, 2002 | New Building | Construction of townhouse units 56-61 BLK J | $621K | New build |
| Aug 8, 2002 | New Building | Construction of townhouse Units 45-49 BLK H | $411K | New build |
| Aug 8, 2002 | New Building | Construction of townhouse Units 16-23 BLK C | $708K | New build |
The 40 most recent of 51 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.