Street · 3870 of 8,565 by permit count
Building permits on Rees St
The City of Toronto has 39 building permits on record for Rees St, going back to 2002. Declared construction value totals $14.5M. The most recent permit was issued Mar 23, 2026 at 25 Rees St.
- Permits on record
- 392002–2026
- Declared construction value
- $14.5Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20022026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Mar 23, 2026 | Temporary Structures | Proposal to erect two temporary entrance structures. Start Date May 31, 2026 tear down June 3, 2026 | — | Closed |
| Nov 18, 2025 | Interior Alterations | REV01: Proposed revision for added security fence to parking area and minor electrical updatesUpgrade of electrical equipment and alteration of internal doors | — | Open |
| Aug 22, 2023 | Electromagnetic Locks | Design for the installation of one (1) electromagnetic locking device and all associated life safety requirements. | $25K | Closed |
| Apr 5, 2022 | Building Permit Related(PS) | Plumbing - Installation of six new heat exchanger units on Level 72.70 of the facility including reinforcing beams to the underside of the slab at various locations. Installation of four New Lake Water Pumps on Level 68.55 and two new Chilled Water Secondary Pumps on Level 72.70. | — | Open |
| Apr 5, 2022 | Building Permit Related(MS) | HVAC - Installation of six new heat exchanger units on Level 72.70 of the facility including reinforcing beams to the underside of the slab at various locations. Installation of four New Lake Water Pumps on Level 68.55 and two new Chilled Water Secondary Pumps on Level 72.70. | — | Open |
| Apr 5, 2022 | Interior Alterations | Installation of six new heat exchanger units on Level 72.70 of the facility including reinforcing beams to the underside of the slab at various locations. Installation of four New Lake Water Pumps on Level 68.55 and two new Chilled Water Secondary Pumps on Level 72.70. | $1.7M | Open |
| Apr 1, 2022 | Building Permit Related(MS) | HVAC - Interior alterations - to modify existing space to accomodate new switchgear. | — | Open |
| Apr 1, 2022 | Interior Alterations | Proposal for interior alterations to modify an existing space on the ground & mezzanine floor levels to accomodate a new switchgear. [Enwave] | $1.9M | Open |
| Apr 1, 2022 | Building Permit Related(PS) | Plumbing - Interior alterations - to modify existing space to accomodate new switchgear. | — | Open |
| Mar 9, 2022 | Alternative Solution | Use of a ships ladder to provide access onto an unoccupied mezzanine used for the express purpose of housing mechanical and electrical equipment servicing the building. This platform will only be accessed occasionally to service the equipment.3.3.1.13.(2) permits stairways that are not in conformanc | — | Closed |
| Dec 14, 2021 | Interior Alterations | Upgrades of Toronto Water facilities server/computer room and supporting infrastructructure | $169K | Open |
| Aug 4, 2021 | Backflow Prevention Devices (Water only) | Proposed BFP for water pump cooling adn expansion tank | $10K | Open |
| Feb 5, 2020 | Building Permit Related(MS) | HVAC - Proposal to install 3 new exchanges for use between enwave and COT for existing pumping station. | — | Closed |
| Feb 5, 2020 | Interior Alterations | Proposal for concrete pads and structural supports to install 3 new Heat Exchange equipment to be used between distribution company (ENWAVE Energy Corporation) and the City of Toronto Utility Services (Works Department) at the Basement Floor level of the Existing Pumping Station Building. (Existing | $1.7M | Closed |
| Jun 7, 2018 | New Building | REV - 01 this building permit is for the fire stopping systems for large floor openings as per approved alternative solution # 18- 122749 ALT 00 ASProposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices | — | New build |
| Feb 28, 2018 | Alternative Solution | Proposed alternative solution to firestopping of the large openings through floors for building service (electrical) penetrations. Openings are larger in length and/or width compared to current ULC, cUL or ITS listed firestop systems. | — | Closed |
| Jan 18, 2018 | Alternative Solution | Alternative solution to modify the protection concept proposed January 24 2014 - Permit Number 14 110903 ALT 00 | — | Open |
| Dec 6, 2017 | Alternative Solution | Alternative solution for the fire protection regarding the rooftop are of the Bremner Transformer Station and adjacent to Roundhouse 255 Bremner Street | — | Closed |
| Nov 21, 2017 | Alternative Solution | Proposed alternative solution for water curtain (Close -spaced sprinklers )below switch gear rooms in Cable spread floor basement area. | — | Closed |
| Feb 10, 2015 | Alternative Solution | Proposal for an alternative solution of a sanitary drainage system. | — | Closed |
| May 13, 2014 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices with three storey of mechanical equipment below grade. | — | Closed |
| May 13, 2014 | Building Permit Related(MS) | HVAC - Proposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices with three storey of mechanical equipment below grade. | — | Closed |
| May 6, 2014 | Building Permit Related(PS) | REVISION - To proposed plumbing in the existing industrial building. Plumbing - Proposal for interior alterations TO CONSTRUCT A MEZZANINE LEVEL WITHIN THE EXISTING BUILDING ENVELOPE TO HOUSE EXPANDED STAFF FACILITIES INCLUDING OFFICE, WASHROOM AND CHANGE FACILITIES (see 13-101261 ZZC) | — | Closed |
| May 6, 2014 | Building Permit Related(MS) | REVISION - To proposed HVAC in the existing industrial building. HVAC - Proposal for interior alterations TO CONSTRUCT A MEZZANINE LEVEL WITHIN THE EXISTING BUILDING ENVELOPE TO HOUSE EXPANDED STAFF FACILITIES INCLUDING OFFICE, WASHROOM AND CHANGE FACILITIES (see 13-101261 ZZC) | — | Closed |
| Mar 25, 2014 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - To effect approved alternative solution # 17- 265389 ALT 00 ASProposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices with three storey of mechanical equipment below grade. | — | Closed |
| Jan 29, 2014 | Alternative Solution | Alternative solution related to building permit application: 11-131842 NB: deletion of sprinklers from switchgear rooms and control room; to interconnect floor space between P1 and P2; to provide spatial separation and connection of machine shop and roundhouse. | — | Closed |
| Jan 6, 2014 | Interior Alterations | Proposal for interior alterations TO CONSTRUCT A MEZZANINE LEVEL WITHIN THE EXISTING BUILDING ENVELOPE TO HOUSE EXPANDED STAFF FACILITIES INCLUDING OFFICE, WASHROOM AND CHANGE FACILITIES (see 13-101261 ZZC). | $500K | Closed |
| Sep 13, 2013 | Inside and Outside Drains | Drain - Proposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices with three storey of mechanical equipment below grade. | $1.0M | Closed |
| Aug 2, 2013 | Partial Permit - Foundation | Part Permit - Proposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices with three storey of mechanical equipment below grade. [See 255 Bremner Blvd. for SPA. 255 Bremner Blvd. lot has been severed] (Preci | — | Closed |
| Jan 28, 2013 | Partial Permit - Shoring | Part Permit - Proposal to demolish existing building and construct new Transformer Station for Toronto Hydro Electric. The two storeys building is comprise of offices with three storey of mechanical equipment below grade. [See 255 Bremner Blvd. for SPA. 255 Bremner Blvd. lot has been severed] (Preci | — | Closed |
| Jan 9, 2013 | Building Permit Related(PS) | SEE HVAC FOR DRAWINGS - Plumbing - Proposal for structural interior alterations to support new chiller platform. | — | Closed |
| Jan 9, 2013 | Building Permit Related(MS) | HVAC - Proposal for structural interior alterations to support new chiller platform. | — | Open |
| Nov 21, 2012 | Interior Alterations | Proposal for structural interior alterations to support new chiller platform. | $1.5M | Open |
| Nov 14, 2012 | Demolition | Proposal to demolish existing Transformer Station for Toronto Hydro Electric. See 11-329842.There is a admin Permit for 255 Bremner Blvd - 12- 192192 . Hold for Heritage review/sign off. | — | Demolition |
| Dec 17, 2003 | Sprinklers | Sprinkler fire protection and standpipe installation on levels 72, 68, 55, and 79. In connection with B.P.#02-152216 BLD. | $35K | Closed |
| Sep 9, 2003 | Building Permit Related(PS) | Plumbing - build addition (for deep lake water cooling project) - Addition(s) *second set of plumbing drawings to follow* | — | Closed |
| May 20, 2003 | Building Permit Related(MS) | HVAC - build addition (for deep lake water cooling project) - Addition(s) | — | Closed |
| May 20, 2003 | Addition(s) | build addition (for deep lake water cooling project) | $6.0M | Closed |
| Dec 20, 2002 | Partial Permit - Other | Partial permit in connection with BP; 02-152216 for foundations, excavation and shoring. | — | Closed |
The 39 most recent of 39 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.