Street · 1811 of 8,565 by permit count
Building permits on Raleigh Ave
The City of Toronto has 107 building permits on record for Raleigh Ave, going back to 1999. Those permits created 9 homes and removed 5, a net change of +4. Declared construction value totals $20.4M. The most recent permit was issued Aug 14, 2026 at 50 Raleigh Ave.
- Permits on record
- 1071999–2026
- Declared construction value
- $20.4Mas filed, not adjusted
- Homes created
- 9dwelling units
- Homes removed
- 5net +4
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 14, 2026 | Sprinklers | Proposal for sprinkler system removal. | $1K | Open |
| Jul 21, 2026 | Building Permit Related(PS) | Plumbing - Proposed multiple projects including interior alterations, new roof and one-storey ground-floor addition. | — | Open |
| Jul 13, 2026 | Building Permit Related(MS) | HVAC - Proposed multiple projects including interior alterations, new roof and one-storey ground-floor addition. | — | Open |
| Jul 7, 2026 | Multiple Projects | Proposed multiple projects including interior alterations, new roof and one-storey ground-floor addition. | $1.3M | Open |
| May 1, 2026 | Special Ventilation System | Installation of spray paint booth and makeup air unit | $170K | Open |
| Oct 31, 2025 | New Building | REVISION - addition to the existing rear decknew single family dwelling | — | New build |
| Mar 31, 2025 | Building Permit Related(PS) | Plumbing - INTERIOR ALTERATION TO EXISTING 1 STOREY BUILDING | — | Closed |
| Mar 31, 2025 | Building Permit Related(MS) | HVAC - INTERIOR ALTERATION TO EXISTING 1 STOREY BUILDING | — | Closed |
| Mar 31, 2025 | Interior Alterations | INTERIOR ALTERATION TO EXISTING 1 STOREY BUILDING | $650K | Closed |
| Nov 12, 2024 | Inside and Outside Drains | Drain - One storey addition, underground parking and site servicing | $2.0M | Open |
| Nov 7, 2024 | Addition(s) | One storey addition, for industrial building (Structural Steel Fabricator) | $13.0M | Open |
| Nov 7, 2024 | Building Permit Related(PS) | Plumbing - One storey addition, underground parking and site servicing | — | Open |
| Nov 7, 2024 | Building Permit Related(MS) | HVAC - One storey addition, underground parking and site servicing | — | Open |
| Jan 27, 2023 | Backflow Prevention Devices (Water only) | Relocate backflow device to upstairs storage area, installing new 3/4" DCVA and expansion tank | $2K | Closed |
| Sep 13, 2022 | Demolition | Proposal to demolish existing building Ground floor GFA is 3,840 ft sq, Industrial building | — | Demolition |
| Jun 17, 2021 | Other(PS) | Proposal for new plubming in 2 Washrooms. | $7K | Open |
| May 12, 2021 | Interior Alterations | Revision 01 - rating to adjoining suiteProposal for interior alterations to suite new office layout in existing building, scope of work includes plumbing, electrical and hvac. | — | Closed |
| Jan 19, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to suite new office layout in existing building, scope of work includes plumbing, electrical and hvac. | — | Closed |
| Jan 19, 2021 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to suite new office layout in existing building, scope of work includes plumbing, electrical and hvac. | — | Closed |
| Nov 4, 2019 | Back Water Valve (Sewer only) | Proposal to install back water valve and sump pump. | — | Closed |
| Jul 24, 2019 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in existing industrial building - Euro Railings | $1K | Closed |
| Jun 12, 2018 | Backflow Prevention Devices (Water only) | Proposal to install a back flow prevention device | $2K | Closed |
| May 3, 2018 | Backflow Prevention Devices (Water only) | Proposal to install a back flow prevention device. | $2K | Closed |
| Apr 30, 2018 | Retaining Wall | Revision #01 - Replaced entire set of drawings to construct new retaining wall with new structural drawings S101A , S102 & S201. | — | Closed |
| Feb 26, 2018 | Building Permit Related(MS) | Rev 1 - Proposed revision to mechanical layout.HVAC - Proposal for interior alterations to industrial building | — | Closed |
| Feb 23, 2018 | Building Permit Related(PS) | Rev 1 - Proposed revision to plumbing layout.Plumbing - Proposal for interior alterations to industrial building | — | Closed |
| Feb 6, 2018 | New Building | Revision 2 to balcony and front porch stairs - Proposed demolition of existing 1 storey SFD to be replaced by new 2 storey SFD with finished basement and integrated garage. | — | New build |
| Jan 24, 2018 | Interior Alterations | Rev - Proposed revision to suspended cieling.Proposal for interior alterations to industrial building | — | Closed |
| Dec 28, 2017 | Building Permit Related(MS) | Revision 1 - HVAC - Proposed demolition of existing 1 storey SFD to be replaced by new 2 storey SFD with finished basement and integrated garage. | — | Closed |
| Nov 21, 2017 | Electromagnetic Locks | REVISION - to install 4 additional maglocksProposal to install 19 electromagnetic locks. | — | Closed |
| Feb 22, 2017 | Other(BA) | Restoration of damaged masonry exterior wall due to vehicle impact damages | $10K | Closed |
| Aug 31, 2016 | Backflow Prevention Devices (Water only) | Install backflow preventer for premise isolation. | $1K | Closed |
| Jul 13, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1/2 inch backflow prevention device. | $1K | Closed |
| Jun 24, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 3/4 inch backflow prevention device. | $1K | Closed |
| Jun 24, 2016 | Building Permit Related(MS) | HVAC - Construct new three storey sfd-detached (316.24m2) | — | Closed |
| May 24, 2016 | Building Permit Related (DR) | Drain - Construct new three storey sfd-detached (316.24m2) | — | Closed |
| May 24, 2016 | Demolition | Demolish existing one storey sfd-detached | — | Demolition |
| May 24, 2016 | New Building | Construct new three storey sfd-detached (316.24m2) | $300K | New build |
| May 24, 2016 | Building Permit Related(PS) | Plumbing - Construct new three storey sfd-detached (316.24m2) | — | Closed |
| Apr 20, 2016 | Backflow Prevention Devices (Water only) | install backflow preventor | $2K | Closed |
The 40 most recent of 107 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.