thepermitmap

Street · 843 of 8,567 by permit count

Building permits on Queen'S Park

The City of Toronto has 216 building permits on record for Queen'S Park, going back to 1995. Declared construction value totals $215.0M. The most recent permit was applied for Sep 3, 2026 at 111 Queen's Park.

Permits on record
2161995–2026
Declared construction value
$215.0Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20002026 (part year)

Most common work

  • Interior Alterations47 · 22%
  • Building Permit Related(MS)39 · 18%
  • Building Permit Related(PS)20 · 9%
  • Temporary Structures12 · 6%
  • Certified Tents11 · 5%
  • Multiple Projects10 · 5%
  • Electromagnetic Locks8 · 4%
  • Other(BA)7 · 3%
  • Sprinklers6 · 3%
  • Building Permit Related(FS)5 · 2%
  • Fire Alarm5 · 2%
  • Alternative Solution5 · 2%

Structures worked on

  • Museum114 · 53%
  • University31 · 14%
  • Other25 · 12%
  • Office7 · 3%
  • Student Residence7 · 3%
  • Art Gallery5 · 2%
  • Unspecified5 · 2%
  • Transit Station,Subway, Bus Terminal4 · 2%
  • Unknown4 · 2%
  • Institutional3 · 1%
  • College/Trade/Tech School/Training Cent.2 · 1%
  • Multiple Use/Non Residential2 · 1%

Where this street runs

University 168 permits
Bay-Cloverhill 46 permits

Most recent permits

Issued Work What was filed Value Status
Sep 3, 2026 Fire Alarm Proposal for fire alarm system panel repair. Edwards EST3 to EST4 $25K Open
Aug 28, 2026 Building Permit Related(FS) FS - Sprinkler Shop Drawing - To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor. Open
Aug 28, 2026 Interior Alterations Proposed interior alterations on the third floor in the area of rooms 318, 320, 322, 323, 324, and 325 and related electrical work. $250K Open
May 25, 2026 Building Permit Related(PS) Plumbing - To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor. Open
May 25, 2026 Multiple Projects To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor. $65.0M Open
May 25, 2026 Building Permit Related(MS) HVAC - To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor. Open
Feb 17, 2026 Building Permit Related(PS) Rev 02 - Modifcations to the HVAC and plumbing distribution. Minor update to the duct work to add an access door for exhaust duct work. Deletion of fire damper supply and install scope at the B1 level due to existing fire damper being located. Fire standpipe replacement scope deletion. Revision 01 - Open
Feb 17, 2026 Building Permit Related(MS) rEV 03 - Modifcations to the HVAC and plumbing distribution. Minor update to the duct work to add an access door for exhaust duct work. Deletion of fire damper supply and install scope at the B1 level due to existing fire damper being located. Fire standpipe replacement scope deletion. Revision # 2 Open
Feb 13, 2026 Sprinklers Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the bridge at 90 Queen's Park (Which is connected to 100 QP) is demolished) $10K Open
Nov 28, 2025 Demolition Proposed demolition of the building (McLaughlin Planetarium), excluding foundations $3.0M Demolition
Nov 28, 2025 Other(BA) Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum) $350K Open
Sep 29, 2025 Interior Alterations Theatre service space/back of house remediation/upgrades, and front of house theatre audience space renovation - "University of Toronto"Convenience address is 80 Queen's Park $8.0M Open
Sep 29, 2025 Building Permit Related(MS) HVAC - Theatre service space/back of house remediation/upgrades, and front of house theatre audience space renovation - "University of Toronto"Convenience address is 80 Queen's Park Open
Sep 19, 2025 Alternative Solution Alternative Solution for the proposed wood ceiling for the proposed renovations to the Royal Ontario Museum (ROM), related to permit #23_166554_BLD. Closed
Jul 9, 2025 Building Permit Related(MS) Rev. 1 - Revision for mechanical - fire dampers. equipment schedules, sprinkler layout, minor modification to existing grilles, diffusers and duct layout, etc. - See cover letter for detailed description.HVAC - Proposal to construct interior alterations on first floor. Open
Jul 7, 2025 Building Permit Related(PS) Rev. 1 - Revision for mechanical, minor changes to sinks at Gridline 4 and associated solid interceptor on basement level.Plumbing - Proposal to construct interior alterations on first floor. Open
Jun 19, 2025 Multiple Projects REVISION #4 - modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. REVISION #3- as per the bubbled drawingsInterior renovations to the Royal Ontario Museum related to the Bloor Street entrance. Open
May 15, 2025 Interior Alterations REVISION - revised sprinkler systemProposal to construct interior alterations on first floor. Open
Feb 28, 2025 Inside and Outside Drains REVISION 01: This permit permit is being submitted to remove the crossing out for the exterior work related to the permit. Drain - Interior and Exterior renovations to the Royal Ontario Museum related to the Bloor Street entrance. Open
Jan 17, 2025 Building Permit Related(MS) HVAC - Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room. Closed
Jan 17, 2025 Building Permit Related(PS) Plumbing - Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room. Open
Jan 17, 2025 Addition(s) Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room. $200K Open
Nov 21, 2024 Building Permit Related(MS) Revision 01: changes listed in cover letterHVAC - Proposal for interior alteration to existing building for on-site alcohol storage collection laboratory Closed
Oct 15, 2024 Alternative Solution Proposal for an alternative solution to permit the use "street level entrance storey" in lieu of "first storey". Closed
Aug 9, 2024 Fire Alarm Proposed: Fire alarm panel upgrade (conventional to addressable) with the following upgrades:Replacement of conventional fire alarm detectors with addressable devices on floors that are not sprinklered; Removal of fire alarm detectors on floors that are sprinklered; Addition of smoke detectors on to $100K Open
Apr 5, 2024 Building Permit Related(PS) Plumbing - Proposal for interior alteration to existing building for on-site alcohol storage collection laboratory Closed
Apr 5, 2024 Interior Alterations Proposal for interior alteration to existing building for on-site alcohol storage collection laboratory $750K Closed
Dec 15, 2023 HVAC: Groups A & B Removal and disposal of existing HVAC system and installation of a new Air Handling Unit (AHU SF-26) $691K Open
Oct 11, 2023 Building Permit Related(FS) FS - Sprinkler Shop Drawing - Interior and Exterior renovations to the Royal Ontario Museum related to the Bloor Street entrance. Closed
Sep 25, 2023 Site Service Replacement of existing exterior private on-site fire water mains due to deterioration. Installation of underground concrete valve chamber on private property for future maintenance purposes. $100K Closed
Jun 22, 2023 Temporary Structures ERECT TEMPORARY STRUCTURE FOR THE TORONTO JAZZ FESTSTART DATE JUN 23, TEAR DOWN 25 JUN. 2023. Closed
Jun 21, 2023 Temporary Structures Proposal to construct a temporary structure on the roadway for the Toronto Jazz Festival.Setup date is June 23, 2023 and dismantled on June 25, 2023. Closed
Oct 17, 2022 Alternative Solution Proposal to remove the existing 23m lengths of 38mm diamter fire hoses in every hose cabinet within the building Open
Mar 26, 2021 Backflow Prevention Devices (Water only) Installation of backflow preventer device - The Gardiners Museum $5K Open
Feb 23, 2021 Interior Alterations Proposal for interior alterations to existing museum $400K Open
Feb 19, 2021 Building Permit Related(MS) HVAC - Proposal for interior renovations to part basement rooms 079 and 080 located at Edward Johnson building. Open
Dec 18, 2020 Interior Alterations Proposal for interior alterations to existing museum for new gallery space $4.0M Closed
Dec 18, 2020 Building Permit Related(MS) HVAC - Proposal for interior alterations to existing museum for new gallery space Open
Oct 21, 2020 Other(BA) Stone masonry repairs, including steel shelf angle replacement and off site heritage steel window conservation at the north south and patrial west (south end) of the East Wing $1.1M Open
Jul 24, 2020 Interior Alterations Proposal for interior renovations to part basement rooms 079 and 080 located at Edward Johnson building. $280K Open

The 40 most recent of 216 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
216
City refresh
2026-09-13 10:24
Page built
2026-09-13
Sheet
STR-479