Street · 1071 of 8,565 by permit count
Building permits on Presteign Ave
The City of Toronto has 174 building permits on record for Presteign Ave, going back to 1995. Those permits created 8 homes and removed 6, a net change of +2. Declared construction value totals $6.8M. The most recent permit was issued May 4, 2026 at 34 Presteign Ave.
- Permits on record
- 1741995–2026
- Declared construction value
- $6.8Mas filed, not adjusted
- Homes created
- 8dwelling units
- Homes removed
- 6net +2
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| May 4, 2026 | Building Permit Related(MS) | HVAC - To construct a new two-storey detached dwelling with an integral garage, a widened driveway, a covered front porch, a rear first storey deck with a second storey balcony above. | — | Open |
| Feb 11, 2026 | Deck | Proposal for front porch extension and new roof and open trellis over existing front porch. | $30K | Closed |
| Aug 29, 2025 | New Building | To construct a new two-storey detached dwelling with an integral garage, a widened driveway, a covered front porch, a rear first storey deck with a second storey balcony above. | $600K | New build |
| Aug 28, 2025 | Demolition | Proposal to demolish the existing bangalow and build a new two storey single family dwelling. | — | Demolition |
| Aug 28, 2025 | Building Permit Related(PS) | Plumbing - To construct a new two-storey detached dwelling with an integral garage, a widened driveway, a covered front porch, a rear first storey deck with a second storey balcony above. | — | Open |
| Aug 28, 2025 | Building Permit Related (DR) | Drain - To construct a new two-storey detached dwelling with an integral garage, a widened driveway, a covered front porch, a rear first storey deck with a second storey balcony above. | — | Open |
| Jan 14, 2025 | Building Permit Related(MS) | HVAC - To demolish existing dwelling and construct a new two storey dwelling | — | Closed |
| Aug 14, 2024 | Demolition | To demolish existing dwelling and construct a new two storey dwelling | — | Demolition |
| Aug 14, 2024 | Back Water Valve (Sewer only) | Proposal for installing back water valve on sanitary line | — | Open |
| Aug 13, 2024 | Building Permit Related (DR) | Drain - To demolish existing dwelling and construct a new two storey dwelling | — | Closed |
| Aug 13, 2024 | Building Permit Related(PS) | Plumbing - To demolish existing dwelling and construct a new two storey dwelling | — | Closed |
| Aug 13, 2024 | New Building | To demolish existing dwelling and construct a new two storey dwelling | $900K | New build |
| Dec 1, 2023 | Back Water Valve (Sewer only) | Proposed BWV | — | Open |
| Oct 24, 2023 | Building Permit Related(MS) | REV01-Revision to designHVAC - Proposal to demolish the existing house and construct a new 2 storey detached dwelling with an integral garage and a basement dwelling unit. | — | Closed |
| Sep 21, 2023 | New Building | REVISION#2: MINOR INTERIOR REVISION TO BASEMENT - NOTED WITH CLOUDS [RELATED TO PERMIT # 22 158562]Proposal to demolish the existing house and construct a new 2 storey detached dwelling with an integral garage and a basement dwelling unit. | — | New build |
| Apr 6, 2023 | Deck | New Deck | $80K | Closed |
| Jan 5, 2023 | Multiple Projects | REVISION 01: Proposal to create a new secondary suite in the existing basement.The proposed work involves the renovation of an existing basement including replacement of plumbing fixtures in existing washroom, replacement of floors and ceiling throughout, new pot lights. Forming openings for new doo | — | Open |
| Dec 12, 2022 | New Building | Revision 02 - for a finished basement - Delta 6 | — | New build |
| Dec 12, 2022 | New Building | Revison 02 - for a finished basement - Delta 5 | — | New build |
| Dec 12, 2022 | New Building | Revision 02 - for a finished basement - Delta 4 | — | New build |
| Sep 30, 2022 | Building Permit Related(PS) | Plumbing - The proposed work involves the renovation of an existing basement including replacement of plumbing fixtures in existing washroom, replacement of floors and ceiling throughout, new potlights. Forming openings for new doors and walkup basement, converting an existing cold room into a gym, | — | Closed |
| Aug 16, 2022 | Building Permit Related (DR) | Drain - Proposal to demolish the existing house and construct a new 2 storey detached dwelling with an integral garage and a basement dwelling unit. | — | Closed |
| Aug 16, 2022 | Demolition | Proposal to demolish the existing house and construct a new 2 storey detached dwelling with an integral garage and a basement dwelling unit. | — | Demolition |
| Aug 16, 2022 | Building Permit Related(PS) | Plumbing - Proposal to demolish the existing house and construct a new 2 storey detached dwelling with an integral garage and a basement dwelling unit. | — | Closed |
| Jun 27, 2022 | Building Permit Related (DR) | Drain - The proposed work involves the renovation of an existing basement including replacement of plumbing fixtures in existing washroom, replacement of floors and ceiling throughout, new potlights. Forming openings for new doors and walkup basement, converting an existing cold room into a gym, bas | — | Open |
| Apr 11, 2022 | New Building | Revision 02 - - changes to gradeRevision 01 - Proposal for basement finishing. Proposal to demolish existing place of worship and construct new single family dwelling with unfinished basement and integral garage. | — | New build |
| Mar 21, 2022 | New Building | Revision 02 - changes to gradeRevision 01 - revision for finished basementProposal to demolish existing place of worship and construct new single family dwelling with unfinished basement and integral garage. | — | New build |
| Mar 21, 2022 | New Building | Revision 03 - changes to gradeRevision 02 - Proposal for basement finishing. Proposal to demolish existing place of worship and construct new single family dwelling with unfinished basement and integral garage. | — | New build |
| Dec 3, 2021 | Garage | DETACHED REAR YARD GARAGE | $50K | Open |
| Jun 17, 2021 | Deck | Proposed to construct covered concrete patio attched to rear of dwelling. Patio to be constructed on below grade foundation walls and strip footings. | $75K | Closed |
| May 31, 2021 | Building Permit Related(MS) | Revision 01. 2nd furnace added to 2nd floor laundary roomHVAC - Two storey side addition with a second floor addition over existing bungalow, interior alteration through out and rear deck. **** See ZZC Drawings **** | — | Closed |
| Dec 11, 2020 | New Building | Revsion to finish the basement.Proposal to demolish existing sfd-dwelling and construct a new 2 storey sfd- dwelling with integral garage. | — | New build |
| Sep 14, 2020 | Back Water Valve (Sewer only) | Proposal to install a back water valve in the existing single family dwelling, scope of work is related to 04-176992 DRN 00 DR. | — | Open |
| Aug 19, 2020 | Multiple Projects | Two storey side addition with a second floor addition over existing bungalow, interior alteration through out and rear deck. **** See ZZC Drawings **** | $500K | Closed |
| Aug 19, 2020 | Building Permit Related(PS) | Plumbing - Two storey side addition with a second floor addition over existing bungalow, interior alteration through out and rear deck. | — | Closed |
| Aug 19, 2020 | Building Permit Related (DR) | Drain - Two storey side addition with a second floor addition over existing bungalow, interior alteration through out and rear deck. | — | Closed |
| Aug 18, 2020 | Multiple Projects | REVISION 2 - additional information included based on comments from the Inspector on siteConstruct ground floor additions at south elevation with attached integral garage at front; construct covered porch at front & uncovered platform at rear; construct second storey; make interior alterations. | — | Open |
| Jun 12, 2020 | Building Permit Related (DR) | Drain - Proposal to demolish existing place of worship and construct new single family dwelling with unfinished basement and integral garage. | — | Closed |
| Jun 12, 2020 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing place of worship and construct new single family dwelling with unfinished basement and integral garage. | — | Closed |
| Jun 12, 2020 | Building Permit Related(MS) | HVAC - Proposal to demolish existing place of worship and construct new single family dwelling with unfinished basement and integral garage. | — | Closed |
The 40 most recent of 174 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.