thepermitmap

Street · 4659 of 8,565 by permit count

Building permits on Northwest Gt

The City of Toronto has 28 building permits on record for Northwest Gt, going back to 2010. Declared construction value totals $100K. The most recent permit was issued Dec 8, 2017 at 185 Northwest Gt.

Permits on record
282010–2017
Declared construction value
$100Kas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20102017 (part year)

Most common work

  • New Building4 · 14%
  • Alternative Solution4 · 14%
  • Electromagnetic Locks3 · 11%
  • Building Permit Related(MS)3 · 11%
  • Building Permit Related(PS)3 · 11%
  • Inside and Outside Drains3 · 11%
  • Sprinklers2 · 7%
  • Building Permit Related(FS)2 · 7%
  • Partial Permit - Shoring2 · 7%
  • Partial Permit - Structural Framing2 · 7%

Structures worked on

  • Transit Station,Subway, Bus Terminal24 · 86%
  • Unspecified4 · 14%

Most recent permits

Issued Work What was filed Value Status
Dec 8, 2017 Sprinklers FS - Sprinkler Shop Drawing - Spadina Subway Extension - Hwy 407 Station(Changes from original permit 10-243691) $100K Open
Dec 1, 2017 Inside and Outside Drains Revision 01 - to watermain connection to building, fire deptarment connection and hydrant locations for the Hwy 407 Station (Spadina Subway Extenstion)Drain - Spadina Subway Extension - Hwy 407 Station Closed
Nov 27, 2017 Building Permit Related(PS) Revision 01 - to mechanical layout for the Hwy 407 Station (Spadina Subway Extenstion)Plumbing - Spadina Subway Extension - Hwy 407 Station Closed
Nov 27, 2017 Building Permit Related(MS) Revision 01 - to mechanical layout for the Hwy 407 Station (Spadina Subway Extenstion)HVAC - Spadina Subway Extension - Hwy 407 Station Closed
Nov 22, 2017 Electromagnetic Locks Revision 2 - Eleven (11) mag lock devices have been removed from the bus terminal at Hwy 407 Station, two (2) mag locks remain at the south platfrom emergencey stairs (dwg A33-1) and north platform emergency stairs (dwg A33-1 and E5041)Install 13 new Electromagnetic Locks 407 Station in the City of Open
Nov 21, 2017 New Building Revision to TTC Vaughan Metropolitan Centre Station related to building permit 11-153001 BLD. Includes the aluminium and glass screen, complete with sliding doors and swing doors added along Grid Line A to demarcate the VIVA BRT Connection at the VMC Subway Station Concourse Level. New build
Nov 17, 2017 New Building Revision 01 - to the Hwy 407 TTC station for the architectural, structural and fire alarm systemSpadina Subway Extension - Hwy 407 Station New build
Oct 13, 2017 Building Permit Related(MS) Revision 01 - Various HVAC due to tunnel addition, duct re-routing, duct sized, AHU resizing and ACC/ACU deletionsHVAC - Spadina Subway Extension - Vaughan Corporate Centre Station. Closed
Oct 11, 2017 Building Permit Related(PS) Revision 01 - Various plumbing changes due to tunnel addition, water and drainage pipe rerouting and resizingPlumbing - Spadina Subway Extension - Vaughan Corporate Centre Station. Closed
Oct 11, 2017 Sprinklers Revision to Fire protection for new TTC subway station. which includes changes to wet and dry stand pipe fire extinguisher locationss and clean agent systems. Open
Sep 29, 2017 Electromagnetic Locks Revision - to door number 400 - Implementation of 3 electromagnetic locking devices on two doors for purposes of access control. Installation is specified to meet the requirements subsection 3.2.4 of the OBC.Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate Open
Sep 20, 2017 Inside and Outside Drains Revision 01 - water connections revised and removed in some locations, storm sewer from STM MH 13 to STM MH 1 upsized from 150mm diameter to 200mm diameter, main entrance surface drainage design and layout and callouts for sanitary and storm services connectionsDrain - Spadina Subway Extension - Vau Closed
Aug 2, 2017 Inside and Outside Drains Revision 01-City of Toronto water metre relocated from Rm.423 to site chamber (backflow preventer type revised). A reduced pressue principle backflow preventer added for the irrigation system at the TTC substation (City of Vaughan)Drain - Subway Station with bus terminal and ancillary facilities at Closed
Aug 2, 2017 Building Permit Related(PS) Revision 02 - City of Toronto water metre relocated from Rm.423 to site chamber (backflow preventer type revised). Removed water meter and backflow preventer from TTC substation mechanical room.Revsion to Plumbing - Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate with Closed
May 15, 2017 Electromagnetic Locks Revise as per plans. Install 2 electromagnetic locking devices. Open
Mar 17, 2017 Building Permit Related(MS) Revision to HVAC - Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). Closed
Mar 15, 2017 Alternative Solution Deletion of fire protection cabinets at subway platform level. Closed
Nov 24, 2016 Alternative Solution OBC sentence 3.13.5.11.(5) requires that in addition to fire hose cabinets located such that every portion of the rapid transit station can be reached by a hose stream, hose stations shall be located in each tunnel within 20 metres from the end of the platform. Closed
May 12, 2015 Alternative Solution Alternative solution for elimination of tunnel hoses 20m either side of station platform. See original permit of new builiding 10 243691 Closed
Dec 9, 2014 Partial Permit - Shoring Part Permit - Spadina Subway Extension - Hwy 407 Station Closed
Oct 24, 2014 Building Permit Related(FS) FS - Sprinkler Shop Drawing - Spadina Subway Extension - Hwy 407 Station Closed
May 7, 2014 Alternative Solution Alternative solution for the omission of the sprinlkler system in the steele truss escalator enclosures. Closed
Aug 20, 2013 Building Permit Related(FS) FS - Sprinkler Shop Drawing - Spadina Subway Extension - Vaughan Corporate Centre Station. Closed
Dec 21, 2012 New Building Conditional Permit - Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). New build
Oct 11, 2012 Partial Permit - Structural Framing Part Permit - Spadina Subway Extension - Vaughan Corporate Centre Station. Closed
Jan 17, 2012 Partial Permit - Shoring Shoring Part Permit - Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). Closed
Sep 9, 2011 New Building Conditional Permit - Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). New build
Dec 21, 2010 Partial Permit - Structural Framing Part Permit - Spadina Subway Extension - Hwy 407 Station Closed

The 28 most recent of 28 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
28
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-198