Street · 4659 of 8,565 by permit count
Building permits on Northwest Gt
The City of Toronto has 28 building permits on record for Northwest Gt, going back to 2010. Declared construction value totals $100K. The most recent permit was issued Dec 8, 2017 at 185 Northwest Gt.
- Permits on record
- 282010–2017
- Declared construction value
- $100Kas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20102017 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Dec 8, 2017 | Sprinklers | FS - Sprinkler Shop Drawing - Spadina Subway Extension - Hwy 407 Station(Changes from original permit 10-243691) | $100K | Open |
| Dec 1, 2017 | Inside and Outside Drains | Revision 01 - to watermain connection to building, fire deptarment connection and hydrant locations for the Hwy 407 Station (Spadina Subway Extenstion)Drain - Spadina Subway Extension - Hwy 407 Station | — | Closed |
| Nov 27, 2017 | Building Permit Related(PS) | Revision 01 - to mechanical layout for the Hwy 407 Station (Spadina Subway Extenstion)Plumbing - Spadina Subway Extension - Hwy 407 Station | — | Closed |
| Nov 27, 2017 | Building Permit Related(MS) | Revision 01 - to mechanical layout for the Hwy 407 Station (Spadina Subway Extenstion)HVAC - Spadina Subway Extension - Hwy 407 Station | — | Closed |
| Nov 22, 2017 | Electromagnetic Locks | Revision 2 - Eleven (11) mag lock devices have been removed from the bus terminal at Hwy 407 Station, two (2) mag locks remain at the south platfrom emergencey stairs (dwg A33-1) and north platform emergency stairs (dwg A33-1 and E5041)Install 13 new Electromagnetic Locks 407 Station in the City of | — | Open |
| Nov 21, 2017 | New Building | Revision to TTC Vaughan Metropolitan Centre Station related to building permit 11-153001 BLD. Includes the aluminium and glass screen, complete with sliding doors and swing doors added along Grid Line A to demarcate the VIVA BRT Connection at the VMC Subway Station Concourse Level. | — | New build |
| Nov 17, 2017 | New Building | Revision 01 - to the Hwy 407 TTC station for the architectural, structural and fire alarm systemSpadina Subway Extension - Hwy 407 Station | — | New build |
| Oct 13, 2017 | Building Permit Related(MS) | Revision 01 - Various HVAC due to tunnel addition, duct re-routing, duct sized, AHU resizing and ACC/ACU deletionsHVAC - Spadina Subway Extension - Vaughan Corporate Centre Station. | — | Closed |
| Oct 11, 2017 | Building Permit Related(PS) | Revision 01 - Various plumbing changes due to tunnel addition, water and drainage pipe rerouting and resizingPlumbing - Spadina Subway Extension - Vaughan Corporate Centre Station. | — | Closed |
| Oct 11, 2017 | Sprinklers | Revision to Fire protection for new TTC subway station. which includes changes to wet and dry stand pipe fire extinguisher locationss and clean agent systems. | — | Open |
| Sep 29, 2017 | Electromagnetic Locks | Revision - to door number 400 - Implementation of 3 electromagnetic locking devices on two doors for purposes of access control. Installation is specified to meet the requirements subsection 3.2.4 of the OBC.Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate | — | Open |
| Sep 20, 2017 | Inside and Outside Drains | Revision 01 - water connections revised and removed in some locations, storm sewer from STM MH 13 to STM MH 1 upsized from 150mm diameter to 200mm diameter, main entrance surface drainage design and layout and callouts for sanitary and storm services connectionsDrain - Spadina Subway Extension - Vau | — | Closed |
| Aug 2, 2017 | Inside and Outside Drains | Revision 01-City of Toronto water metre relocated from Rm.423 to site chamber (backflow preventer type revised). A reduced pressue principle backflow preventer added for the irrigation system at the TTC substation (City of Vaughan)Drain - Subway Station with bus terminal and ancillary facilities at | — | Closed |
| Aug 2, 2017 | Building Permit Related(PS) | Revision 02 - City of Toronto water metre relocated from Rm.423 to site chamber (backflow preventer type revised). Removed water meter and backflow preventer from TTC substation mechanical room.Revsion to Plumbing - Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate with | — | Closed |
| May 15, 2017 | Electromagnetic Locks | Revise as per plans. Install 2 electromagnetic locking devices. | — | Open |
| Mar 17, 2017 | Building Permit Related(MS) | Revision to HVAC - Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). | — | Closed |
| Mar 15, 2017 | Alternative Solution | Deletion of fire protection cabinets at subway platform level. | — | Closed |
| Nov 24, 2016 | Alternative Solution | OBC sentence 3.13.5.11.(5) requires that in addition to fire hose cabinets located such that every portion of the rapid transit station can be reached by a hose stream, hose stations shall be located in each tunnel within 20 metres from the end of the platform. | — | Closed |
| May 12, 2015 | Alternative Solution | Alternative solution for elimination of tunnel hoses 20m either side of station platform. See original permit of new builiding 10 243691 | — | Closed |
| Dec 9, 2014 | Partial Permit - Shoring | Part Permit - Spadina Subway Extension - Hwy 407 Station | — | Closed |
| Oct 24, 2014 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Spadina Subway Extension - Hwy 407 Station | — | Closed |
| May 7, 2014 | Alternative Solution | Alternative solution for the omission of the sprinlkler system in the steele truss escalator enclosures. | — | Closed |
| Aug 20, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Spadina Subway Extension - Vaughan Corporate Centre Station. | — | Closed |
| Dec 21, 2012 | New Building | Conditional Permit - Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). | — | New build |
| Oct 11, 2012 | Partial Permit - Structural Framing | Part Permit - Spadina Subway Extension - Vaughan Corporate Centre Station. | — | Closed |
| Jan 17, 2012 | Partial Permit - Shoring | Shoring Part Permit - Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). | — | Closed |
| Sep 9, 2011 | New Building | Conditional Permit - Steeles West Subway Station with bus terminal and ancillary facilities at 185 Northwest Gate within the City of Toronto and 2800 Steeles Avenue West within City of Vaughan ( a.k.a Steeles West Station ). | — | New build |
| Dec 21, 2010 | Partial Permit - Structural Framing | Part Permit - Spadina Subway Extension - Hwy 407 Station | — | Closed |
The 28 most recent of 28 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.