Street · 2633 of 8,567 by permit count
Building permits on Mowat Ave
The City of Toronto has 69 building permits on record for Mowat Ave, going back to 1990. Declared construction value totals $8.5M. The most recent permit was issued Aug 21, 2024 at 78 Mowat Ave.
- Permits on record
- 691990–2024
- Declared construction value
- $8.5Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002024 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 21, 2024 | Electromagnetic Locks | Electrical basic renovation - one maglock only | $50K | Closed |
| Jul 26, 2024 | Interior Alterations | Proposal for minor interior alterations to portions of the existing ground floor level for existing office tenant - 'Tik Tok'. Project scope is to add speed gates (speedlanes) on the floor. Electrical basic renovation to coordinate with new gates. | $50K | Closed |
| May 17, 2024 | Alternative Solution | AN ALTERNATIVE SOLUTION IS PROPOSED TO ADDRESS THE OBC PROVISIONS ANDPERMITS THE INSTALLATION OF LOCKING DEVICES WITHIN 78 MOWAT AVE. BUILDING. | — | Closed |
| Sep 18, 2023 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to office space | — | Open |
| Sep 18, 2023 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to office space | — | Open |
| Aug 23, 2023 | Interior Alterations | Proposal for interior alterations to office space | $400K | Open |
| Apr 4, 2023 | Special Ventilation System | Proposed Installation of central ERV¿s in order to provide mechanical ventilation to this office tower sized to meet ASHRAE 62.1 values | $1.5M | Open |
| Mar 2, 2023 | Sprinklers | Installing new concealed heads under new open grid ceilings. Tie into existing mains above. Area of work is office boardrooms on main floor. | $6K | Open |
| Sep 15, 2022 | Sign Building Permit Related | Application for a permit to erect and display one illuminated wall sign, displaying static copy.*****SALT***** | — | Closed |
| Apr 28, 2022 | Building Permit Related(PS) | Rev 01: Changes to plumbing in kitchen and mothers room area. Plumbing - Project scope is to renovate in place the selected areas of an existing one storey + mezzanine building to serve the new group D business-occupancy tenant. Scope of work includes the selective demolition of existing interior fi | — | Closed |
| Jun 7, 2021 | Building Permit Related(MS) | HVAC - Project scope is to renovate in place the selected areas of an existing one storey + mezzanine building to serve the new group D business-occupancy tenant. Scope of work includes the selective demolition of existing interior fit-out to coordinate with new plan. New interior construction to in | — | Closed |
| Jun 7, 2021 | Interior Alterations | Project scope is to renovate in place the selected areas of an existing one storey + mezzanine building to serve the new group D business-occupancy tenant. Scope of work includes the selective demolition of existing interior fit-out to coordinate with new plan. New interior construction to include t | $100K | Closed |
| Mar 20, 2018 | Interior Alterations | Proposal to convert loading dock space to commerical space for a photography studio in Unit C, "Beno & Wolf" | $65K | Open |
| Sep 30, 2015 | Backflow Prevention Devices (Water only) | premise isolation backflow preventer installation | $4K | Closed |
| Aug 18, 2015 | Interior Alterations | Permit for interior alterations to Suite 18C within existing commercial office space. | $35K | Closed |
| Aug 18, 2015 | Building Permit Related(MS) | HVAC - Permit for interior alterations to Suite 18C within existing commercial office space. | — | Open |
| Aug 5, 2015 | Sprinklers | To instal pre-action sprinklers. | $1.0M | Open |
| Jun 24, 2015 | Exterior Tank & Support | Proposal to locate 1 (decorative) storage silo (TYPE A1) in the front yard of the lands of the existing industrial property. | $20K | Open |
| Apr 23, 2015 | Interior Alterations | Proposal for interior alterations to the ground floor of an existing office building; proposed communications and broadcasting establishment [By-law #438-86] | $350K | Closed |
| Apr 23, 2015 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to the ground floor of an existing office building. | — | Closed |
| Apr 23, 2015 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to the ground floor of an existing office building. | — | Open |
| Mar 26, 2015 | Backflow Prevention Devices (Water only) | installation of a dcw premise isolation backflow prevention device | $5K | Closed |
| Dec 12, 2014 | Backflow Prevention Devices (Water only) | To install a backflow prevention device | $1K | Closed |
| Jun 19, 2013 | Standpipes | New siamese connection and 4 new 4" check valves and lines to be tied into existing risers for "The Toronto Carpet Factory". | $7K | Open |
| Apr 8, 2013 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations and the addition of 1 new sink to existing office. Tenant is "Toronto Carpet Factory". | — | Closed |
| Apr 8, 2013 | Interior Alterations | Proposal for interior alterations and the addition of 1 new sink to existing office. Tenant is "Toronto Carpet Factory". | $10K | Closed |
| Jul 26, 2010 | Building Permit Related(PS) | Plumbing - Interior alterations to existing commercial space on the ground floor for new yoga studio. Unit G02 & Go3. Convenience address - 155 Liberty St. | — | Closed |
| Jul 26, 2010 | Building Permit Related(MS) | HVAC - Interior alterations to existing commercial space on the ground floor for new yoga studio. Unit G02 & Go3. Convenience address - 155 Liberty St. | — | Closed |
| Jul 26, 2010 | Interior Alterations | Interior alterations to existing commercial space on the ground floor for new yoga studio. Unit G02 & Go3. Convenience address - 155 Liberty St. | $90K | Closed |
| May 7, 2010 | Building Permit Related(PS) | Plumbing - permit to convert existing vacant space to office space - floor 3 and 4. | — | Closed |
| May 7, 2010 | Building Permit Related(MS) | HVAC - permit to convert existing vacant space to office space - floor 3 and 4. | — | Closed |
| May 7, 2010 | Interior Alterations | permit to convert existing vacant space to office space - floor 3 and 4. | $50K | Closed |
| Mar 9, 2010 | Backflow Prevention Devices (Water only) | Proposal to install one backflow prevention device in existing commercial building. Ground floor restaurant, second and third floor offices. Convenience address: 155 Liberty Street | $3K | Closed |
| Dec 15, 2009 | Building Permit Related(PS) | Plumbing - Permit to convert existing vacant space to restaurant less than 30 seats - ground floor - Unit G-01 - See 09 141905 ZPR and 09 166869 MV - for PPR and C of A | — | Closed |
| Dec 15, 2009 | Building Permit Related(MS) | HVAC - Permit to convert existing vacant space to restaurant less than 30 seats - ground floor - Unit G-01 - See 09 141905 ZPR and 09 166869 MV - for PPR and C of A | — | Closed |
| Dec 15, 2009 | Interior Alterations | Permit to convert existing vacant space to restaurant less than 30 seats - ground floor - Unit G-01 - See 09 141905 ZPR and 09 166869 MV - for PPR and C of A | $90K | Closed |
| Nov 24, 2009 | Special Ventilation System | Kitchen exhaust permit for new restaurant - see 09 189604 BLD for Building permit Permit to convert existing vacant space to restaurant less than 30 seats - ground floor - Unit G-01 - See 09 141905 ZPR and 09 166869 MV - for PPR and C of A | $10K | Closed |
| Apr 29, 2009 | Building Permit Related(PS) | Plumbing - Proposal to construct partial third floor addition for offices (49.93m2), and interior alterations on all floors (retail space 91.51m2, office space 145m2) for existing non-residential building. Also see related interior demolition permit 08-184639. | — | Closed |
| Apr 29, 2009 | Building Permit Related(MS) | HVAC - Proposal to construct partial third floor addition for offices (49.93m2), and interior alterations on all floors (retail space 91.51m2, office space 145m2) for existing non-residential building. Also see related interior demolition permit 08-184639. | — | Closed |
| Apr 29, 2009 | Multiple Projects | Proposal to construct partial third floor addition for offices (49.93m2), and interior alterations on all floors (retail space 91.51m2, office space 145m2) for existing non-residential building. Also see related interior demolition permit 08-184639. | $2.0M | Closed |
The 40 most recent of 69 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.