Street · 666 of 8,567 by permit count
Building permits on Mcintosh St
The City of Toronto has 260 building permits on record for Mcintosh St, going back to 2000. Those permits created 36 homes and removed 17, a net change of +19. Declared construction value totals $7.2M. The most recent permit was applied for Sep 1, 2026 at 43 McIntosh St.
- Permits on record
- 2602000–2026
- Declared construction value
- $7.2Mas filed, not adjusted
- Homes created
- 36dwelling units
- Homes removed
- 17net +19
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 1, 2026 | New Building | REVISION-01:(CLARIFICATION ON HOW SPATIAL SEPARATIONS REQUIRED TO BE FIRE-RATED FOR SPATIAL SEPARATION REASONS AS PER 9.10.14.5 through 9.10.15.5. OF THE OBC DO NOT REQUIRE FIRE-RATED OPENINGS AS THEY ARE NOT A 'FIRE SEPARATION' UNDER 1.4.1.2.)Proposal to construct a new detached three storey four u | — | New build |
| Aug 26, 2026 | Building Permit Related (DR) | Drain - Proposed New 2 Storey Semi detached Laneway Suite | — | Open |
| Aug 26, 2026 | Building Permit Related(PS) | Plumbing - Proposed New 2 Storey Semi detached Laneway Suite | — | Open |
| Aug 26, 2026 | New Laneway / Rear Yard Suite | Proposed New 2 Storey Semi detached Laneway Suite | $100K | Open |
| Aug 26, 2026 | Building Permit Related(MS) | HVAC - Proposed New 2 Storey Semi detached Laneway Suite | — | Open |
| Aug 25, 2026 | Building Permit Related(PS) | Plumbing - Proposed construction of a new 2-storey laneway suite in the rear yard of an existing detached dwelling. | — | Open |
| Aug 18, 2026 | Building Permit Related(MS) | HVAC - Proposal for a two storey rear yard laneway suite with an integral parking space. | — | Open |
| Aug 11, 2026 | Building Permit Related(MS) | HVAC - Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | — | Open |
| Aug 11, 2026 | Building Permit Related(MS) | HVAC - Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | — | Open |
| Aug 11, 2026 | Demolition | Proposal to demolish the existing 1 storey SFD-detached dwelling. | — | Demolition |
| Aug 10, 2026 | Building Permit Related(PS) | Plumbing - Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | — | Open |
| Aug 10, 2026 | Building Permit Related (DR) | Drain - Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | — | Open |
| Aug 10, 2026 | Building Permit Related (DR) | Drain - Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | — | Open |
| Aug 10, 2026 | Building Permit Related(PS) | Plumbing - Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | — | Open |
| Aug 4, 2026 | Building Permit Related(PS) | Plumbing - Proposal for a two storey rear yard laneway suite with an integral parking space. | — | Open |
| Aug 4, 2026 | New Building | Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | $500K | New build |
| Aug 4, 2026 | Building Permit Related (DR) | Drain - Proposal for a two storey rear yard laneway suite with an integral parking space. | — | Open |
| Aug 4, 2026 | New Laneway / Rear Yard Suite | Proposal for a two storey rear yard laneway suite with an integral parking space. | $100K | Open |
| Jul 29, 2026 | Demolition | PROPOSED DEMOLISH SFD DETACHED TO CONSTRUCT NEW 3-STOREY HOUSEPLEX (4 UNITS) | — | Demolition |
| Jul 27, 2026 | New Building | Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front and rear third storey balconies (laneway suite in separate review). | $500K | New build |
| Jul 6, 2026 | New Laneway / Rear Yard Suite | Proposed construction of a new 2-storey laneway suite in the rear yard of an existing detached dwelling. | $70K | Open |
| Jun 19, 2026 | Garage | Proposal to construct a new detached garage approximately 16 ' x 25' | $8K | Open |
| May 25, 2026 | Garage | New garage at rear of yard | $8K | Closed |
| May 1, 2026 | Building Permit Related (DR) | Drain - Proposal for second floor addition to existing 1 storey Laneway Suite | — | Open |
| May 1, 2026 | Building Permit Related(MS) | HVAC - Proposal for second floor addition to existing 1 storey Laneway Suite | — | Open |
| May 1, 2026 | Addition(s) | Proposal for second floor addition to existing 1 storey Laneway Suite | $30K | Open |
| May 1, 2026 | Building Permit Related(PS) | Plumbing - Proposal for second floor addition to existing 1 storey Laneway Suite | — | Open |
| Apr 20, 2026 | Demolition | Proposal to demolish existing dwelling and construct a new three storey four unit dwelling. | — | Demolition |
| Apr 7, 2026 | Building Permit Related (DR) | Drain - Proposal to construct a new detached three storey four unit dwelling complete with two third storey balconies and a rear basement walkout. | — | Open |
| Apr 7, 2026 | Building Permit Related(PS) | Plumbing - Proposal to construct a new detached three storey four unit dwelling complete with two third storey balconies and a rear basement walkout. | — | Open |
| Apr 7, 2026 | Building Permit Related(MS) | HVAC - Proposal to construct a new detached three storey four unit dwelling complete with two third storey balconies and a rear basement walkout. | — | Open |
| Apr 1, 2026 | Garage | Proposal for repair work to existing detached garage due to vehicle impact damage | $25K | Closed |
| Nov 28, 2025 | Building Permit Related (DR) | Drain - Proposal to construct a new detached three storey fourplex with a front entrance canopy, third storey front and rear balconies and a rear basement walkout | — | Closed |
| Nov 28, 2025 | Demolition | Demolish existing one storey dwelling | — | Demolition |
| Nov 28, 2025 | New Building | Proposal to construct a new detached three storey fourplex with a front entrance canopy, third storey front and rear balconies and a rear basement walkout | $600K | New build |
| Nov 28, 2025 | Building Permit Related(PS) | Plumbing - Proposal to construct a new detached three storey fourplex with a front entrance canopy, third storey front and rear balconies and a rear basement walkout | — | Closed |
| Nov 28, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct a new detached three storey fourplex with a front entrance canopy, third storey front and rear balconies and a rear basement walkout | — | Closed |
| Jul 14, 2025 | New Building | Rev 02 - Revision for proposed walkway in the front yard and size of 2 windows in the basement.Rev 01 - Application for revision of permit; basement addition; furnace moved tobasement; One bedroom & washroom added at ground floor.LOT A - Part 2, North Lot - 113A McIntosh St (RETAINED LOT - CORNER LO | — | New build |
| Jun 24, 2025 | Building Permit Related(MS) | HVAC - Proposal for a new laneway suite a the rear of the property | — | Open |
| Jun 24, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct a new laneway suite at the rear of the property | — | Open |
The 40 most recent of 260 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.