Street · 212 of 8,565 by permit count
Building permits on Mccowan Rd
The City of Toronto has 614 building permits on record for Mccowan Rd, going back to 1998. Those permits created 19 homes and removed 7, a net change of +12. Declared construction value totals $826.8M. The most recent permit was issued Sep 9, 2026 at 1457 McCowan Rd.
- Permits on record
- 6141998–2026
- Declared construction value
- $826.8Mas filed, not adjusted
- Homes created
- 19dwelling units
- Homes removed
- 7net +12
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Agincourt South-Malvern West 191 permits
Cliffcrest 109 permits
Eglinton East 95 permits
Bendale South 60 permits
Agincourt North 56 permits
Woburn North 44 permits
Bendale-Glen Andrew 22 permits
Milliken 9 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 9, 2026 | Retaining Wall | Rev 01 - Proposed amendments to include the retaining wall with in City ROW.Proposed installation of the retaining wall is located at EEB 7 location (1455 McCowan Rd) | — | Open |
| Sep 8, 2026 | Interior Alterations | Converting the existing 2 storey single family detached house to a 3unit house, removing the unauthorized work done in the garage and converting it back to original one car garage and removing the unauthorized roof structure over the basement walkout stair. | $65K | Open |
| Sep 4, 2026 | Partial Permit - Shoring | Part Permit - Proposal for the construction of the Emergency Exit Building 6 for the SSE-SRS project. | — | Open |
| Sep 4, 2026 | Multiple Projects | Revision 01: replacing stone built front porch to wood frame & driveway extension. Proposal to convert existing detached SFD into a 3 dwelling unit house-plex with a basement walkout, rear deck and a front porch. | — | Open |
| Aug 25, 2026 | Partial Permit - Shoring | Part Permit - Proposal for the construction of the Emergency Exit Building (EEB) 7 for the SSE-SRS project.Also applying for plumbing/inside drainage. | — | Open |
| Aug 7, 2026 | Inside and Outside Drains | Sump pump installation | $20K | Open |
| Aug 5, 2026 | Interior Alterations | Proposal for interior alterations to construct a new fire resistance rated enclosure around the existing mechanical room within the Level P1 parking garage, including a fire rated access door and associated fire stopping | $40K | Open |
| Jul 29, 2026 | Fire Alarm | Proposed replacement of fire alarm control panel. | $24K | Open |
| Jul 27, 2026 | Multiple Projects | REV 03: Proposed converting the existing basement to a secondary dwelling unit, removing the unauthorized work done in the garage and converting it back to original one car garage and removing the unauthorized roof structure over the basement walkout stair. Revision 02: ADDITION OF A FAMILY LIVING A | — | Open |
| Jul 15, 2026 | Temporary Structures | Proposal to place the temporary site trailers in the laydown area for the proposed Emergency Exit Building 5. | — | Open |
| Jul 8, 2026 | Building Permit Related(PS) | Plumbing - Proposed addition of Fixtures and laundry machine | — | Open |
| Jul 8, 2026 | Building Permit Related(MS) | HVAC - Proposed addition of Fixtures and laundry machine | — | Open |
| Jul 8, 2026 | Interior Alterations | Proposed new laundry room (Converting existing party room into laundry room) | $100K | Open |
| Jun 23, 2026 | Porch | STRUCTURAL REPAIRS TO REAR PORCH DAMAGED BY TREE IMPACT. | $15K | Open |
| Jun 12, 2026 | Site Service | The proposed work is located at 1457 McCowan Rd (with in boulevard area) the installation and approval of a temporary 300 mm private water service connection and 250mm private sanitary service connection to support construction activities for the EEB-07 Ancillary Buildings component of the Scarborou | $5.0M | Open |
| Jun 5, 2026 | Site Service | The proposed work is located at 1072 McCowan Rd. Scope of the work includes the installation and approval of a temporary 150 mm private water service connection and 150mm private sanitary service connection to support construction activities for the EEB-06 Ancillary Buildings component of the Scarbo | $100K | Open |
| Jun 2, 2026 | Site Service | Proposed scope of the work is located at Emergency Exit Building - 7 (1455 McCowan Rd Parking Lot) which includes the installation of temporary storm pipe with in the private property which replaces the existing ditch which collects water from the Highway 401 off ramp. | $100K | Open |
| May 28, 2026 | Multiple Projects | Proposal to convert existing duplex to fourplex. | $40K | Open |
| Apr 20, 2026 | Building Permit Related(MS) | HVAC - Proposal for rear, side additions to existing single family dwelling and 1 new second suite, basement renovation, interior renovation, a garage and a front porch. | — | Open |
| Apr 17, 2026 | Building Permit Related(PS) | Plumbing - Proposal to convert existing detached SFD into a 3 dwelling unit house-plex with a basement walkout, rear deck and a front porch. | — | Open |
| Apr 7, 2026 | Partial Permit - Shoring | Part Permit - Proposal for the construction of the Emergency Exit Building (EEB) 5 for the SSE-SRS project. | — | Open |
| Mar 26, 2026 | Building Permit Related(MS) | HVAC - EXISTING HOUSE TO BE DEMOLISHED. A LOT SEVERANCE AND CONSTRUCTION OF TWO HOUSES IS PROPOSED. | — | Open |
| Feb 26, 2026 | Building Permit Related(MS) | HVAC - Proposal for demolition of a portion of existing house and a new addition within that existing building area and new covered deck. | — | Open |
| Feb 23, 2026 | Demolition | STC would like to submit a demolition permit application for property ¿ 1072 McCowan Rd located at EEB 6. The intent of this demolition is due to the future construction activities planned at this location to facilitate the construction of EEB 6. | — | Demolition |
| Jan 27, 2026 | Building Permit Related(PS) | Plumbing - EXISTING HOUSE TO BE DEMOLISHED. A LOT SEVERANCE AND CONSTRUCTION OF TWO HOUSES IS PROPOSED. | — | Open |
| Jan 27, 2026 | Building Permit Related (DR) | Drain - EXISTING HOUSE TO BE DEMOLISHED. A LOT SEVERANCE AND CONSTRUCTION OF TWO HOUSES IS PROPOSED. | — | Open |
| Jan 27, 2026 | New Building | EXISTING HOUSE TO BE DEMOLISHED. A LOT SEVERANCE AND CONSTRUCTION OF TWO HOUSES IS PROPOSED. | $560K | New build |
| Jan 26, 2026 | Building Permit Related(PS) | Plumbing - Proposal for demolition of a portion of existing house and a new addition within that existing building area and new covered deck. | — | Open |
| Dec 9, 2025 | Alternative Solution | It is proposed to instead permit some service spaces and rooms to open into public egress corridors by implementing strategic controls, such as scheduled access and inspection of said spaces, and physical controls, such as door hinges to automatically close doors opening into public egress routes, t | — | Open |
| Dec 9, 2025 | Unspecified | Deferred Fees from folder 23 138281 (RSN-5259609) ZoningProcess RSN 78690170 | — | Open |
| Dec 1, 2025 | Alternative Solution | It is proposed to instead permit some service spaces and rooms to open into public egress corridors by implementing strategic controls, such as scheduled access and inspection of said spaces, and physical controls, such as door hinges to automatically close doors opening into public egress routes, t | — | Open |
| Dec 1, 2025 | Alternative Solution | It is proposed to instead permit some service spaces and rooms to open into public egress corridors by implementing strategic controls, such as scheduled access and inspection of said spaces, and physical controls, such as door hinges to automatically close doors opening into public egress routes, t | — | Open |
| Nov 19, 2025 | Partial Permit - Shoring | Part Permit - Construction of the Sheppard East transit station for the SSE-SRS project. | — | Open |
| Nov 14, 2025 | Alternative Solution | The proposed alternative solution required for OBC Div. B 3.13.3.3 (4) - Service Rooms and Ancillary Spaces demonstrates compliance with the minimum performance level and objectives, as outlined in the assessment presented. | — | Open |
| Nov 14, 2025 | Alternative Solution | To remove the requirement for standard prescriptive provisions (full-height access, emergency lighting, and additional passive fire separations) within a 1 m high crawl space underneath each platform, as the inclusion of such in a space with limited height access may be impractical. | — | Open |
| Nov 14, 2025 | Alternative Solution | It is proposed to extend the prescribed 45 am travel distance to an exit from a floor area by 3, to a total of 48. | — | Open |
| Nov 14, 2025 | Alternative Solution | It is proposed to instead supply emergency power from two alternate power supplies from Toronto Hydro in lieu of one primary power supply from Toronto Hydro and a back-up generator as prescribed by the OBC. | — | Open |
| Nov 14, 2025 | Alternative Solution | To remove the requirement for a 1-hour fire-rated enclosure around the elevator shafts by implementing controls such as the minimization of fire loads adjacent to elevator shafts, installing smoke detectors in the top of shafts, fire separating shafts from service floors, and installing laminated gl | — | Open |
| Oct 20, 2025 | Change of Use | STC requests for Change of use permit for a Metrolinx owned residential property to site office to support the construction activities at proposed Emergency Exit Building - 6. | $1K | Open |
| Aug 19, 2025 | Interior Alterations | Proposal for interior alterations to existing retail unit - "Shoppers Drug Mart". | $45K | Closed |
The 40 most recent of 614 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.