Street · 5107 of 8,567 by permit count
Building permits on Mariner Ter
The City of Toronto has 23 building permits on record for Mariner Ter, going back to 2003. Those permits created 340 homes and removed 0, a net change of +340. Declared construction value totals $56.7M. The most recent permit was applied for Sep 4, 2026 at 5 Mariner Ter.
- Permits on record
- 232003–2026
- Declared construction value
- $56.7Mas filed, not adjusted
- Homes created
- 340dwelling units
- Homes removed
- 0net +340
Permits issued per year
20032026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 4, 2026 | Interior Alterations | Proposal to construct a new storage room within the P1 level garage area | $50K | Open |
| Jan 26, 2024 | Interior Alterations | Interior renovation and redesign to unit 2003 (100 m2) | $50K | Closed |
| Apr 24, 2023 | Fire Alarm | Reprogramming of networked fire alarm system to interconnected fire alarm systems serving each condo board. | $5K | Open |
| Apr 17, 2023 | Fire Alarm | Reprogramming of networked fire alarm system to interconnected fire alarm systems serving each condo board. | $100K | Open |
| Nov 1, 2022 | Fire Alarm | Reprogramming of networked fire alarm system to interconnected fire alarm systems | — | Closed |
| Dec 3, 2020 | Sprinklers | Proposal to remove pre-action system and two heads inside of the P1 Electrical Room. Pipe two heads into the Electrical supplied from the P1 Dry Sprinkler System in the existing Apartment Building. | $12K | Closed |
| Apr 29, 2016 | Interior Alterations | Proposal for interior alterations to the walk in closet and ensuite washroom in the existing condo unit. | $15K | Open |
| Mar 21, 2016 | Alter: Boiler/Furnace/AC Replacement | Replace 2 heating boilers, 1 domestic hot water boiler, and add mixing valves to domestic hot water supply in existing residential condominium building. | $200K | Closed |
| Apr 29, 2013 | Backflow Prevention Devices (Water only) | Install one backflow prevention device in exisiting condo. | $7K | Closed |
| Feb 1, 2013 | Backflow Prevention Devices (Water only) | Proposal to install 1 backflow prevention device in an existing residential condo. | $7K | Closed |
| Aug 10, 2012 | Balcony/Guard Repairs | Proposal to repair railings at amenity space terrace in existing condo. | $45K | Open |
| Jul 15, 2011 | Backflow Prevention Devices (Water only) | This is for the installation of a 3" backflow prevention device, located in the basement mechanical room. | $12K | Open |
| Mar 15, 2006 | Interior Alterations | Make interior alterations to condominium; Suite 5503 (SPH #03). | $100K | Closed |
| Dec 15, 2005 | HVAC: Other Group C Buildings | to relocate duct work in condo unit 5503. capacity not to change | $1K | Closed |
| Apr 5, 2005 | Sprinklers | Sprinklers to amenity building of apartment building. Refer to BP 03-131001. | $80K | Closed |
| Jan 4, 2005 | Building Permit Related(MS) | HVAC - Construct dwelling building (338 units) and amenity building including swimming pool and recreation facilities. (TOWER D) - New Building | — | Open |
| Jan 4, 2005 | New Building | Construct dwelling building (338 units) and amenity building including swimming pool and recreation facilities. (TOWER D) | $56.0M | New build |
| Nov 25, 2004 | Electromagnetic Locks | Install one maglock on P1 parking level | $1K | Closed |
| Sep 30, 2004 | Sprinklers | Shop drawings for sprinkler system in connection with application under 03 - 131001 to build apartment building consisting of 338 dwelling units and amenity building including swimming pool and recreation facilities. (Tower D - Phase 3) | — | Closed |
| Sep 24, 2004 | Building Permit Related(PS) | Plumbing - Construct dwelling building (338 units) and amenity building including swimming pool and recreation facilities. (TOWER D) - New Building | — | Closed |
| Jul 27, 2004 | Partial Permit - Structural Framing | Revision to permit by altering plans as mentioned in drawings----Partial permit for structural works above grade for Concord Adex Tower 'D' ( Refer to plans in 3 Navywharf Court- Concord Adex Tower 'C- B.P. No. 04-129163) | — | Closed |
| Oct 17, 2003 | Partial Permit - Foundation | Build new foundation (to grade) , 3 levels underground parking. See BP03-131001 Tower D. (see plans for 3 Navy Wharf -03-174980) | — | Closed |
| Aug 1, 2003 | Partial Permit - Shoring | Shoring & Excavation TOWER D (Apartment Building and Amenity Building) in Conjunction with BP 03 131001 | — | Closed |
The 23 most recent of 23 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.