thepermitmap

Street · 5337 of 8,567 by permit count

Building permits on Magnificent Rd

The City of Toronto has 21 building permits on record for Magnificent Rd, going back to 2005. Declared construction value totals $3.4M. The most recent permit was issued Mar 24, 2026 at 47 Magnificent Rd.

Permits on record
212005–2026
Declared construction value
$3.4Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20052026 (part year)

Most common work

  • Demolition6 · 29%
  • Building Permit Related(MS)3 · 14%
  • Building Permit Related(PS)3 · 14%
  • Other(BA)2 · 10%
  • Interior Alterations1 · 5%
  • Building Permit Related(FS)1 · 5%
  • Addition(s)1 · 5%
  • New Building1 · 5%
  • Site Service1 · 5%
  • Alternative Solution1 · 5%
  • Backflow Prevention Devices (Water only)1 · 5%

Structures worked on

  • Industrial11 · 52%
  • Warehouse9 · 43%
  • Unspecified1 · 5%

Most recent permits

Issued Work What was filed Value Status
Mar 24, 2026 Building Permit Related(FS) FS - Sprinkler Shop Drawing - Proposal for interior alterations to construct eight (8) new ripening rooms in an existing warehouse - Chiovitti Banana Co Ltd Closed
Jul 15, 2025 Building Permit Related(PS) Plumbing - Proposal for interior alterations to construct eight (8) new ripening rooms in an existing warehouse - Chiovitti Banana Co Ltd Open
Jul 8, 2025 Interior Alterations Proposal for interior alterations to construct eight (8) new ripening rooms in an existing warehouse - Chiovitti Banana Co Ltd $2.8M Closed
Jul 8, 2025 Building Permit Related(MS) HVAC - Proposal for interior alterations to construct eight (8) new ripening rooms in an existing warehouse - Chiovitti Banana Co Ltd Open
Aug 5, 2022 Demolition Complete demolition of slab-on-grade maintenance building. $38K Demolition
Aug 5, 2022 Demolition Complete demolition of slab-on-grade maintenance building. $38K Demolition
Aug 5, 2022 Demolition Complete demolition of slab-on-grade maintenance building. $38K Demolition
Aug 5, 2022 Demolition Complete demolition of slab-on-grade maintenance building. $38K Demolition
Aug 5, 2022 Demolition Complete demolition of slab-on-grade maintenance building. Demolition
Aug 2, 2016 Other(BA) Proposal to install a new exterior generator on a concrete pad with associated electrical upgrades to the existing industrial building. $200K Closed
Mar 17, 2016 Other(BA) Proposal to construct a concrete pad/install a new exterior generator + interior electrical upgrades. $275K Closed
Sep 23, 2015 Backflow Prevention Devices (Water only) Proposal to install (1) backflow prevention device in existing auto dealership building. $2K Closed
Jan 28, 2014 Building Permit Related(MS) Revision 03: Battery charger ventillation Revision 02 related to architectural revision 02: Structural, floor plan layout and construction details revision (Hvac revision related to stair, washroom and ramp design. (Proposed construction of a new (1) storey industrial warehouse building.)) Closed
Aug 27, 2013 New Building Revision 02: Structural, floor plan layout and construction details revision. (Revision to stair, washroom and ramp design. (Proposed construction of a new (1) storey industrial warehouse building.)) New build
Aug 22, 2013 Building Permit Related(PS) Revision 03 related to architectural revision 02: Structural, floor plan layout and construction details revision. (:Revision #2: Install (3) vented traps, reduce length of sani pipe and install (2) backflow preventers Plumbing revision related to stair, washroom and ramp design. (Proposed construct Closed
Jul 10, 2013 Alternative Solution Alternative solution application related to architectural revision 02: Structural, floor plan layout and construction details revision: existing kick-out windows to remain. Closed
Jul 13, 2012 Site Service Site Servicing revisuion-New sanitary line added on site. ( Proposed construction of a new (1) storey industrial warehouse building.) Closed
Feb 21, 2012 Demolition Proposed demolition of a (1) storey industrial storage building. Demolition
Feb 22, 2008 Building Permit Related(MS) *HVAC change due to structural changes in REV 02 in BLD folder** HVAC - second storey addition to office area as approved by c/o/a A224/04 - Addition(s) Closed
Feb 22, 2008 Addition(s) **Structural revision** Construct a second storey addition to office at rear as approved by c/o/a A224/04 Closed
Jun 17, 2005 Building Permit Related(PS) Plumbing - second storey addition to office arear as approved by c/o/a A224/04 - Addition(s) Closed

The 21 most recent of 21 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
21
City refresh
2026-09-13 10:24
Page built
2026-09-13
Sheet
STR-082