thepermitmap

Street · 3822 of 8,565 by permit count

Building permits on Ibms Ward 01

The City of Toronto has 40 building permits on record for Ibms Ward 01, going back to 2004. Declared construction value totals $16.6M. The most recent permit was issued Jul 29, 2026 at 1 IBMS WARD 01.

Permits on record
402004–2026
Declared construction value
$16.6Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20042026 (part year)

Most common work

  • New Building15 · 38%
  • Inside and Outside Drains10 · 25%
  • Alternative Solution4 · 10%
  • Retaining Wall2 · 5%
  • Electromagnetic Locks2 · 5%
  • Building Permit Related(MS)2 · 5%
  • Partial Permit - Structural Framing1 · 3%
  • Partial Permit - Foundation1 · 3%
  • Partial Permit - Shoring1 · 3%
  • Building Permit Related(PS)1 · 3%
  • Building Permit Related (DR)1 · 3%

Structures worked on

  • Transit Station,Subway, Bus Terminal33 · 83%
  • Unspecified4 · 10%
  • Community Hall1 · 3%
  • Industrial Warehouse/Hazardous Building1 · 3%
  • Storage Room1 · 3%

Most recent permits

Issued Work What was filed Value Status
Jul 29, 2026 New Building Resources Road Logistic Hub consists of two single-story, pre-assembled modular trailers. These trailers are connected by an exterior elevated walkway, served by three access points: stairs at each end and a ramp in the middle. The walkway is covered by a continuous canopy. Together, they effectivel $500K New build
Dec 4, 2024 Electromagnetic Locks PROPOSAL FOR INSTALLATION OF TWO (2) ELECTRO-MAGNETIC LOCKING DEVICES20 176138 BLD 00 NB $8K Closed
Jun 26, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Westmore Westbound $750K Closed
Jun 25, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Mount Olive Dr - Westbound $750K Closed
Jun 25, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Mount Olive Dr - Eastbound $750K Closed
Jun 24, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Westmore Eastbound $750K Closed
Jun 21, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Stevenson Westbound $750K Closed
Jun 21, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Stevenson Eastbound $750K Closed
Jun 21, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Martin Grove stop Westbound $750K Closed
Jun 21, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Martin Grove stop Eastbound $750K Closed
Jun 21, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Albion stop Westbound $750K Closed
Jun 21, 2024 Inside and Outside Drains Drain - Construct an at grade stop for the FWLRT - Albion stop Eastbound $750K Closed
Oct 18, 2023 New Building Revision 01 - electrical fire alarm updated to refledt PVIS as an Emergency notification deviceTo construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd New build
Jun 13, 2023 Alternative Solution Alternative Solution for Humber College Station (HCS) is the terminus station on the western end of the Finch West Light Rail Transit (FWLRT) project, situated at 7932 Highway 27 in Etobicoke, ON. The HCS platform will be positioned below grade but will be open to the atmosphere. Passengers will be Closed
Jun 13, 2023 Alternative Solution Humber College Station (HCS) is the terminus station on the western end of the Finch West Light Rail Transit (FWLRT) project, situated at 7932 Highway 27 in Etobicoke, ON. The HCS platform will be positioned below grade but will be open to the atmosphere. Passengers will be able to access the statio Open
Dec 5, 2022 New Building Construct an at grade stop for the FWLRT - Stevenson Westbound $750K New build
Dec 5, 2022 New Building Construct an at grade stop for the FWLRT - Mount Olive Dr - Westbound $750K New build
Nov 28, 2022 New Building Construct an at grade stop for the FWLRT - Stevenson Eastbound $750K New build
Nov 28, 2022 New Building Construct an at grade stop for the FWLRT - Mount Olive Dr - Eastbound $750K New build
Sep 1, 2022 New Building Construct an at grade stop for the FWLRT - Albion stop Westbound $750K New build
Sep 1, 2022 New Building Construct an at grade stop for the FWLRT - Albion stop Eastbound $750K New build
Aug 24, 2022 New Building Construct an at grade stop for the FWLRT - Westmore Westbound $750K New build
Aug 24, 2022 New Building Construct an at grade stop for the FWLRT - Westmore Eastbound $750K New build
Aug 12, 2022 New Building Construct an at grade stop for the FWLRT - Martin Grove stop Westbound $750K New build
Aug 12, 2022 New Building Construct an at grade stop for the FWLRT - Martin Grove stop Eastbound $750K New build
Jun 14, 2022 Retaining Wall Construct retaining wall #3 Part B for FWLRT $377K Closed
Dec 3, 2021 Building Permit Related(MS) HVAC - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd Closed
Dec 3, 2021 Partial Permit - Structural Framing Conditional Permit - Part Permit - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd Closed
Oct 13, 2021 New Building Construct an at grade stop for the FWLRT - Mount Olive Dr - Eastbound New build
Oct 7, 2021 Building Permit Related(PS) Plumbing - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd Closed
Oct 6, 2021 Building Permit Related (DR) Drain - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd Closed
Oct 6, 2021 Partial Permit - Foundation Conditional Permit - Part Permit - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd Closed
Jun 3, 2021 Retaining Wall Construct retaining wall #01A and tow wall #3 at west side Finch Ave W and Islington Ave - PT C $325K Closed
Apr 19, 2021 Alternative Solution Alternative solution to reduce the travel distances to the nearest exit stairs leading to the entrance enclosures Open
Apr 12, 2021 Alternative Solution Humber College Stop (HCS), located at 7932 ON 27, will be a terminus for the Finch West Light Rail Transit (FWLRT) line. HCS is classified as a rapid transit station conforming to the requirements of OBC Section 3.13. The station will have two at-grade entrance buildings connecting down to a below-g Closed
Nov 6, 2020 Partial Permit - Shoring Conditional Permit - Part Permit - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd Closed
Oct 25, 2019 New Building Replace existing transit shelter with a new Wheel-Trans Access Hub Shelter (14m2) at the N/W corner of Kipling Ave and Dixon Rd $390K New build
Feb 25, 2005 Building Permit Related(MS) HVAC - Revision to HVAC ductwork in Storage Room of Existing Community Centre - Addition(s) Closed
Jun 17, 2004 New Building Construct a new dry storage building. Existing: vacant land. Proposed: Storage Building. $20K New build
Jan 15, 2004 Electromagnetic Locks To install 4 maglocks to Sears warehouse on main floor $1K Closed

The 40 most recent of 40 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
40
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-268