Street · 1144 of 8,567 by permit count
Building permits on High Meadow Pl
The City of Toronto has 166 building permits on record for High Meadow Pl, going back to 1998. Declared construction value totals $28.2M. The most recent permit was issued Jun 10, 2026 at 30 High Meadow Pl.
- Permits on record
- 1661998–2026
- Declared construction value
- $28.2Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 10, 2026 | Sign Building Permit Related | 2 Wall Signs ** C ** | — | Open |
| May 21, 2026 | Building Permit Related(MS) | REVISION - DELETE OR RELOCATE FIRE DAMPERS TO ALIGN WITH ARCHITECTURAL DRAWINGSHVAC - Proposal for interior alterations to existing office | — | Closed |
| Apr 2, 2026 | Interior Alterations | Revision 01: Revision to permit to revise the front entry screenProposal for interior alterations to existing office | $1.6M | Closed |
| Feb 17, 2026 | Sprinklers | PROPOSED SPRINKLER HEAD RELOCATION AND EXTENSION OF EXISTING WINDOW SPRINKLER SYSTEM | $45K | Closed |
| Oct 23, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing office | — | Closed |
| Sep 24, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for interior alterations to existing office | — | Open |
| Nov 27, 2024 | Building Permit Related(MS) | HVAC - Construct Traction Power Substation - TPSS # 5 - Finch West LRT | — | Closed |
| Oct 8, 2024 | Site Service | Site Services - Construct Traction Power Substation - TPSS # 5 - Finch West LRT | $35K | Closed |
| Aug 10, 2022 | Building Permit Related(PS) | Plumbing - Proposal to enlarge existing dwelling unit in existing Church (The Good Shepherd Chaldean Church) | — | Closed |
| Aug 10, 2022 | Building Permit Related(MS) | HVAC - Proposal to enlarge existing dwelling unit in existing Church (The Good Shepherd Chaldean Church) | — | Closed |
| Aug 10, 2022 | Interior Alterations | Proposal to enlarge existing dwelling unit in existing Church (The Good Shepherd Chaldean Church) | $85K | Closed |
| Jul 19, 2022 | Other Temporary Tents | Installation of Two 30'x75' and Two 30'x50' Temporary Tents for a two days community event in open parking lot area. Install on July 27th 2022 Removal on Aug 1st 2022 | — | Closed |
| Apr 5, 2022 | New Building | Construct Traction Power Substation - TPSS # 5 - Finch West LRT | $1.9M | New build |
| Sep 1, 2021 | Other(MS) | add sinks, grease interceptor, hot water, convection oven | $10K | Closed |
| Aug 26, 2021 | Fixtures/Roof Drains: Other | add sinks, grease interceotpr, hot water | $25K | Closed |
| May 4, 2020 | Inside and Outside Drains | Drain - Proposal for a 2 storey addition to an existing place of worship with including a basement with interior alterations to the existing ground and second floor. New addition to include gymnasium, chapel, offices, and classrooms. Renovated area to include classrooms. | $8.5M | Open |
| Mar 17, 2020 | Multiple Projects | Proposal for a 2 storey addition to an existing place of worship with including a basement with interior alterations to the existing ground and second floor. New addition to include gymnasium, chapel, offices, and classrooms. Renovated area to include classrooms. Renovated area to include daycare (l | $8.5M | Open |
| Mar 17, 2020 | Building Permit Related(PS) | Plumbing - Proposal for a 2 storey addition to an existing place of worship with including a basement with interior alterations to the existing ground and second floor. New addition to include gymnasium, chapel, offices, and classrooms. Renovated area to include classrooms. | — | Open |
| Mar 17, 2020 | Building Permit Related(MS) | HVAC - Proposal for a 2 storey addition to an existing place of worship with including a basement with interior alterations to the existing ground and second floor. New addition to include gymnasium, chapel, offices, and classrooms. Renovated area to include classrooms. | — | Open |
| Dec 14, 2016 | Backflow Prevention Devices (Water only) | Proposal to instal a backflow prevention device | $3K | Closed |
| Aug 17, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 2 inch backflow prevention device. | $4K | Closed |
| Oct 13, 2015 | Backflow Prevention Devices (Water only) | install backflow preventer | $2K | Closed |
| May 14, 2015 | Building Permit Related(MS) | HVAC - interior alteration to create new training room | — | Closed |
| May 14, 2015 | Interior Alterations | interior alteration to create new training room | $107K | Closed |
| Jul 11, 2013 | Building Permit Related(PS) | REVISION #1 - to add a washroom on mezzanine level and construct new wall on ground floor to create new office space. Plumbing - Proposal to finish interior area for first time occupancy. (Unit 22) | — | Closed |
| Jul 11, 2013 | Building Permit Related(MS) | REVISION #1 - to add a washroom on mezzanine level and construct new wall on ground floor to create new office space. (HVAC - Proposal to finish interior area for first time occupancy. (Unit 22)) | — | Closed |
| Jul 11, 2013 | Interior Alterations | REVISION #1 - to add a washroom on mezzanine level and construct new wall on ground floor to create new office space. Convert industrial use into "motor vehicle body repair shop" Proposed Use: (Unit 22 - "Advantage Auto Glass" - Motor Vehicle Repair Shop) -(first occupancy) | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed interior alterations to finish unit for first time occupant for an industrial warehouse with accessory office - Unit 14 | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed interior alterations to finish unit for first time occupant for an industrial warehouse with accessory office - Unit 11 | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed interior alterations to finish unit for first time occupant for an industrial warehouse with accessory office- Unit 5 | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed interior alterations to finish unit for first time occupant for an industrial warehouse with accessory office - Unit 3 | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed interior alterations to finish unit for first time occupant for an industrial warehouse with accessory office - Unit 15 | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Interior alterations to create space for new tenant *Signet Tire Inc* (Retail tire sale and service station). Warehouse and office space at ground and second floor enclosed mezzanine levels. Unit 19 | — | Closed |
| May 2, 2013 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Construct a new one storey with mezzanines industrial building, with 24 condo units. SHELL ONLY (this is to include demising walls between individual condo units only, tenants to apply for finishings & occupancies). Revised to make mezzanine areas second floors. | — | Closed |
| Dec 14, 2012 | Building Permit Related(PS) | Plumbing - Interior alterations to first time occupancy. Create office/storage space for *Browns Shoes Inc* | — | Open |
| Dec 14, 2012 | Building Permit Related(MS) | HVAC - Interior alterations to first time occupancy. Create office/storage space for *Browns Shoes Inc* | — | Open |
| Dec 13, 2012 | Multiple Projects | Interior alterations to first time occupancy. Create office/storage space for *Browns Shoes Inc* | $75K | Closed |
| Sep 4, 2012 | Building Permit Related(MS) | Revision #1: Spec provided for AC2 on mezzanine roof and general revision for kitchen exhaust and makeup air HVAC - Interior alterations to create first time occupancy for *Sabah Bakery* Partion walls, electrical and sprinklers to first floor and enclosed mezzanine. Unit 9. New exhaust, makeup air o | — | Closed |
| Sep 4, 2012 | Building Permit Related(PS) | Revision #1: Relocate washrooms and plumbingPlumbing - Interior alterations to create first time occupancy for *Sabah Bakery* Partion walls, electrical and sprinklers to first floor and enclosed mezzanine. Unit 9, New washrooms and sinks | — | Open |
| Jun 11, 2012 | Interior Alterations | Revision #2: Interior alterations to reduce retail space, relocate offices, washrooms, mechanical. plumbing and electrical and reflect "as built"Interior alterations to create first time occupancy for *Sabah Bakery* (commercial), Partion walls, electrical and sprinklers to first floor and enclosed m | — | Open |
The 40 most recent of 166 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.