Street · 2205 of 8,565 by permit count
Building permits on Greyabbey Trl
The City of Toronto has 86 building permits on record for Greyabbey Trl, going back to 2004. Those permits created 6 homes and removed 0, a net change of +6. Declared construction value totals $3.2M. The most recent permit was issued Aug 14, 2026 at 102 Greyabbey Trl.
- Permits on record
- 862004–2026
- Declared construction value
- $3.2Mas filed, not adjusted
- Homes created
- 6dwelling units
- Homes removed
- 0net +6
Permits issued per year
20042026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 14, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to washroom on main-floor single family dwelling. | — | Open |
| Aug 12, 2026 | Interior Alterations | Proposed interior alterations to washroom on main-floor single family dwelling. | $10K | Open |
| Jul 7, 2026 | Interior Alterations | Proposed alterations to washroom on main floor | $10K | Closed |
| May 11, 2026 | Second Suite (New) | Proposal to add basement secondary unit and add mezzanine with new bathroom. | $95K | Closed |
| May 11, 2026 | Building Permit Related(PS) | Plumbing - Proposal to add basement secondary unit and add mezzanine with new bathroom. | — | Closed |
| Apr 20, 2026 | Back Water Valve (Sewer only) | Proposed backwater valve installation | — | Closed |
| Jan 16, 2026 | Second Suite (New) | Rev 01 - Alteration of door and window at basementProposal to convert basement into a secondary suite. | — | Closed |
| Jan 8, 2026 | Building Permit Related(PS) | Plumbing - Proposal to convert basement into a secondary suite. | — | Closed |
| Nov 6, 2025 | Back Water Valve (Sewer only) | Proposal for installation of backwater valve | — | Closed |
| Sep 23, 2025 | Interior Alterations | Proposal for interior alterations - new laundry room on main level and new computer room and bathroom in basement . | $35K | Closed |
| Sep 23, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations - new laundry room on main level and new computer room and bathroom in basement . | — | Closed |
| Jun 13, 2025 | Multiple Projects | Revision 1: Revised drawingsPROPOSED: NORTH SIDE ADDITION TO BASEMENT,GROUND AND ADDING SECOND FLOOR, INTERIOR ALTERATION | — | Open |
| May 27, 2025 | Back Water Valve (Sewer only) | Proposal for back water valve. | — | Closed |
| Mar 11, 2025 | Interior Alterations | Proposal for interior alterations to remove a structural steel column. | $4K | Open |
| Feb 10, 2025 | Building Permit Related(PS) | Plumbing - PROPOSED: NORTH SIDE ADDITION TO BASEMENT,GROUND AND ADDING SECOND FLOOR, INTERIOR ALTERATION | — | Open |
| Jan 14, 2025 | Deck | Build new rear deck, existing deck to be demolished | $9K | Closed |
| Nov 7, 2024 | Garage | SEPERATE DETACHED GARAGE | $25K | Closed |
| Aug 26, 2024 | Garage | SEPERATE DETACHED GARAGE | $25K | Closed |
| Aug 20, 2024 | New Building | REVISION 01: Revised drawings: 1.Site plan: change in GFA & FSI calculations, 2.Basement plan: change in internal walls and stair, 3.Grd floor plan: indicating double height area, 5. 2nd floor plan: indicating punch in the floor, 6.Rear elevation: change in door height, 7.South elevation: change siz | — | New build |
| Aug 15, 2024 | Garage | Proposal for a detached garage in the rear yard of an existing SFD-semi dwelling. | $25K | Closed |
| Jul 23, 2024 | Garage | Detached garage in the rear | $25K | Closed |
| Jul 16, 2024 | Other Temporary Tents | To install a temporary tent on residential lot for wedding ceremony - August 8/2024 removal August 9/2024 | — | Closed |
| Jun 21, 2024 | Interior Alterations | Proposal for a load bearing wall removal within the building. | $9K | Open |
| Feb 14, 2024 | Building Permit Related(MS) | HVAC - Proposed new 2 storey house with front porch, rear deck balcony and separate entrance to the basement | — | Closed |
| Dec 30, 2023 | Building Permit Related (DR) | Drain - Retrofit for a legal one bedroom basement apartment. | — | Closed |
| Dec 30, 2023 | Second Suite (New) | Retrofit for a legal one bedroom basement apartment. | $10K | Closed |
| Dec 30, 2023 | Building Permit Related(PS) | Plumbing - Retrofit for a legal one bedroom basement apartment. | — | Closed |
| Nov 10, 2023 | Interior Alterations | Building Alterations to Greyabbey SPS as part of the forcemain replacement project includes: relocate existing 50 mm potable water line & hose valve station. All process piping and valves will be replaced | $603K | Open |
| Nov 10, 2023 | Building Permit Related(PS) | Plumbing - Building Alterations to Greyabbey SPS as part of the forcemain replacement project includes: relocate existing 50 mm potable water line & hose valve station. All process piping and valves will be replaced | — | Open |
| Oct 24, 2023 | Building Permit Related (DR) | Drain - Proposed new 2 storey house with front porch, rear deck balcony and separate entrance to the basement | — | Closed |
| Oct 24, 2023 | Demolition | Demo of existing detached house abd build a new 2 storey house. | — | Demolition |
| Oct 24, 2023 | Building Permit Related(PS) | Plumbing - Proposed new 2 storey house with front porch, rear deck balcony and separate entrance to the basement | — | Closed |
| Aug 25, 2023 | Building Permit Related(MS) | HVAC - Proposal to add a 2nd suite in the basement of an existing 1 storey detached dwelling. | — | Closed |
| Jun 20, 2023 | Second Suite (New) | Proposal to add a 2nd suite in the basement of an existing 1 storey detached dwelling. | $60K | Closed |
| Jun 20, 2023 | Building Permit Related(PS) | Plumbing - Proposal to add a 2nd suite in the basement of an existing 1 storey detached dwelling. | — | Closed |
| Apr 13, 2023 | Fire Damage | REPAIR/REINSTATE PORTION OF THE DWELLING DUE TO FIRE DAMAGE. | — | Open |
| Feb 27, 2023 | Deck | NEW REAR DECK & STAIRS TO GRADE | $50K | Open |
| Jan 3, 2023 | Multiple Projects | Proposal to enclose the existing rear deck at rear in the exiting detached one storey single family house, new shed and outdoor kitchen. | $35K | Open |
| Jul 20, 2022 | Addition(s) | rev 02: longer span for kitchen lvl | — | Open |
| May 25, 2022 | Second Suite (New) | Proposal to add a unit in the basement. | $15K | Closed |
The 40 most recent of 86 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.