Street · 946 of 8,567 by permit count
Building permits on Garfield Ave
The City of Toronto has 194 building permits on record for Garfield Ave, going back to 1999. Those permits created 4 homes and removed 7, a net change of -3. Declared construction value totals $14.8M. The most recent permit was applied for Aug 28, 2026 at 42 Garfield Ave.
- Permits on record
- 1941999–2026
- Declared construction value
- $14.8Mas filed, not adjusted
- Homes created
- 4dwelling units
- Homes removed
- 7net -3
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 28, 2026 | Multiple Projects | REV 03: Revisions as per bubbled changesREV02: Proposed revision to bathroom in basementREV01 : Drawings Revision for 25140683 BLDProposal for additions and interior alterations. | — | Open |
| Aug 7, 2026 | Underpinning | Revision 01 - Revisions to underpinning, walkout basement and basement layout.----------------------------------------------------------Proposal for underpinning. | — | Closed |
| Jan 7, 2026 | New Building | Rev 01: changes to rear yard pool and cabanaProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 24 204295 DEM, 24 100962 ZAP and 24 120538 MV. | — | New build |
| Dec 19, 2025 | Building Permit Related (DR) | Drain - Proposal for additions and interior alterations. | — | Open |
| Dec 19, 2025 | Building Permit Related(PS) | Plumbing - Proposal for additions and interior alterations. | — | Open |
| Nov 24, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 24 204295 DEM, 24 100962 ZAP and 24 120538 MV. | — | Open |
| Oct 30, 2025 | Building Permit Related(MS) | HVAC - Proposal for additions and interior alterations. | — | Open |
| Oct 8, 2025 | Building Permit Related (DR) | Drain - Proposal for basement underpinning demo load bearing walls, new structure and stair extension. | — | Closed |
| Oct 8, 2025 | Building Permit Related(PS) | Plumbing - Proposal for basement underpinning demo load bearing walls, new structure and stair extension. | — | Open |
| Oct 2, 2025 | New Building | REV01: Proposed revision for exterior railing off Master Bedroom exterior door and decorative railing around perimeter of flat roofProposal for a two storey dwelling with integral garage and finished basement | — | New build |
| Sep 11, 2025 | Multiple Projects | REV 01: Changes to add crawlspace with new walkout. Proposal for basement underpinning demo load bearing walls, new structure and stair extension. | — | Open |
| Jul 8, 2025 | Underpinning | Proposal for basement UnderpInning. | $100K | Closed |
| Sep 24, 2024 | Demolition | Proposal to demolish the existing 2 1/2 storey SFD-detached dwelling. | — | Demolition |
| Sep 24, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 24 204295 DEM, 24 100962 ZAP and 24 120538 MV. | — | Open |
| Sep 24, 2024 | Building Permit Related (DR) | Drain - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 24 204295 DEM, 24 100962 ZAP and 24 120538 MV. | — | Open |
| Sep 15, 2023 | Other(SR) | INTERIOR ALTERATION/RENOVATION, 13 L.F. OF UNDERPINNING AT NEW ELEVATOR | $100K | Closed |
| Sep 15, 2023 | Building Permit Related(PS) | Plumbing - INTERIOR ALTERATION/RENOVATION, 13 L.F. OF UNDERPINNING AT NEW ELEVATOR | — | Closed |
| Aug 30, 2023 | Interior Alterations | Interior alterations to main floor layout, removal of load bearing wall reorganize bathroom layout in the second floor | $50K | Open |
| Aug 30, 2023 | Building Permit Related(PS) | Plumbing - Interior alterations to main floor layout, removal of load bearing wall reorganize bathroom layout in the second floor | — | Open |
| Aug 28, 2023 | Other(SR) | Tree impact repair to existing Single Family Dwelling | $10K | Closed |
| Jul 12, 2023 | Multiple Projects | Removal of the column on the main floor in the kitchen area and substitue it with extended beam, extension of the bay window in the family room on the main floor, install new beam for the proposed gym in the basement area. | $980K | Closed |
| Jul 6, 2023 | Fire Alarm | Proposal for Fire alarm system upgrade utilizing existing fire alarm system control panel and new auxiliary devices | $400K | Closed |
| May 7, 2023 | Multiple Projects | Removal of the column on the main floor in the kitchen area and substitute it with a extended beam that carry the load. Extension of the bay window in the family room on the main floor. Install of the new beam for the prosed gym in the basement area. | $980K | Closed |
| Apr 13, 2023 | Multiple Projects | Interior alterations and a rear one storey addition and extension of a bay window | $600K | Closed |
| Nov 29, 2022 | Multiple Projects | Proposed addition, basement underpinning, and interior alterations. | $350K | Open |
| Nov 29, 2022 | Building Permit Related (DR) | Drain - Proposed addition, basement underpinning, and interior alterations. | — | Open |
| Nov 28, 2022 | Building Permit Related(PS) | Plumbing - Proposed addition, basement underpinning, and interior alterations. | — | Open |
| Nov 9, 2022 | Alter: Add on /Ductwork | install new a/c cooling unit in gym | $50K | Closed |
| Aug 15, 2022 | Back Water Valve (Sewer only) | Install back water valve | — | Closed |
| Jun 30, 2022 | Building Permit Related(MS) | REV #1-ADD IN FLOOR HEATING TO BASEMENTHVAC - Interior alterations to all floors, canopy, platform, bay window, second floor roof modification, and dormer at 3rd floor to existing single family dwelling. | — | Open |
| Jun 8, 2022 | Building Permit Related(MS) | HVAC - Proposal to construct a partial 2nd floor addition at the rear of an existing SFD-detached dwelling.See also 07 238793 MV and Final and Binding A0553/07TEY. | — | Open |
| Jun 3, 2022 | Addition(s) | Proposal to construct a partial 2nd floor addition at the rear of an existing SFD-detached dwelling.See also 07 238793 MV and Final and Binding A0553/07TEY. | $50K | Open |
| Jun 3, 2022 | Building Permit Related(PS) | Plumbing - Proposal to construct a partial 2nd floor addition at the rear of an existing SFD-detached dwelling.See also 07 238793 MV and Final and Binding A0553/07TEY. | — | Open |
| May 4, 2022 | Building Permit Related(MS) | HVAC - Proposal for a two storey dwelling with integral garage and finished basement | — | Closed |
| Apr 29, 2022 | Multiple Projects | Revision 02 - various alterations to permit plans as per site condition | — | Open |
| Mar 19, 2021 | Building Permit Related (DR) | Drain - Proposal for a two storey dwelling with integral garage and finished basement | — | Closed |
| Mar 19, 2021 | Demolition | Demolish existing two storey dwelling | — | Demolition |
| Mar 19, 2021 | Building Permit Related(PS) | Plumbing - Proposal for a two storey dwelling with integral garage and finished basement | — | Closed |
| Feb 16, 2021 | Building Permit Related(PS) | Plumbing - Interior alterations to all floors, canopy, platform at 3rd floor | — | Open |
| Dec 23, 2020 | Back Water Valve (Sewer only) | install backwater valve | — | Closed |
The 40 most recent of 194 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.