Street · 502 of 8,567 by permit count
Building permits on Elizabeth St
The City of Toronto has 332 building permits on record for Elizabeth St, going back to 1996. Those permits created 547 homes and removed 0, a net change of +547. Declared construction value totals $377.8M. The most recent permit was applied for Sep 11, 2026 at 130 Elizabeth St.
- Permits on record
- 3321996–2026
- Declared construction value
- $377.8Mas filed, not adjusted
- Homes created
- 547dwelling units
- Homes removed
- 0net +547
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Yonge-Bay Corridor 324 permits
Mimico-Queensway 8 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 11, 2026 | Alternative Solution | Proposed Alternative Solution for pool. The pool will be a Class B public pool as described in the OBC. It will be approximately 3.6 m wide and 19 m long. The depth of the pool will be approximately 1.275 m. The pool will be provided with a clear unobstructed pool deck of 1.8 m on three sides of the | — | Open |
| Sep 8, 2026 | Other(PS) | Replacement of Domestic Water Heaters and associated piping.Convenience address is 111 Chestnut St | $1.0M | Open |
| Sep 1, 2026 | Partial Permit - Foundation | Conditional Permit - Part Permit - Proposal for the construction of a 44-storey mixed-use rental apartment building with 1 level below grade, comprising 547 residential units, including 140 affordable units, and a total of 2,402 sqm of non-residential gross floor area. | — | Open |
| Aug 31, 2026 | Alternative Solution | Proposal for alternatve solution for fire route. | — | Open |
| Aug 28, 2026 | Alternative Solution | This Alternative Solution Proposal addresses a minor exceedance of the maximum permitted distance between the fire department access route and the principal entrance for the proposed mixed-use residential/commercial development. | — | Open |
| Aug 5, 2026 | Other(MS) | Proposed remove existing HVAC Unit and replace with new unit | $845K | Open |
| Aug 4, 2026 | Partial Permit - Shoring | Conditional Permit - Part Permit - Proposal for the construction of a 43-storey mixed-use rental apartment building with 1 level below grade. | — | Open |
| Jul 24, 2026 | Other(BA) | Temporary Hoarding Provided to support construction in the Atrium space. | $150K | Open |
| Jul 24, 2026 | Interior Alterations | Proposed upgrades to air handling system for hospital dish washing area. | $1.5M | Open |
| Jul 8, 2026 | Other(PS) | Proposal to repair parking garage drainage at bottom of P1, and replace sump pumps. | $300K | Open |
| Jul 3, 2026 | Electromagnetic Locks | 3 new mag locks: Double doors 7-A27E and 76ST2 | $9K | Open |
| Jun 10, 2026 | Building Permit Related(MS) | HVAC - Temporary Hoarding Provided to support construction in the Atrium space. | — | Closed |
| May 15, 2026 | Electromagnetic Locks | Proposal to install one (1) electromagnetic lock. | $150K | Open |
| May 12, 2026 | Electromagnetic Locks | Fire/security upgrade, institutional, electormagnetic locks to install 1 double maglock on the first floor munk eas FD044 | $10K | Open |
| May 7, 2026 | Electromagnetic Locks | Revision 01 - Revision to eliminate floors 3 and 5. All other drawings remain as-is[ number of maglocks unchanged].-----------------------------------------------------------Proposed maglock additions | — | Open |
| Apr 12, 2026 | Alternative Solution | Standpipe in sissor stair (Configuration of sissor stairs (stair A and B) and site constraints) | — | Closed |
| Mar 26, 2026 | Interior Alterations | Proposed for interior alterations to install writable glass screens on existing interior walls. | $100K | Closed |
| Feb 5, 2026 | Unspecified | Deferred Fees from folder 25 267337 (RSN-5756797) ZoningProcess RSN 78784492 | — | Open |
| Jan 30, 2026 | Other(BA) | Proposal for Stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of the future proposed apartments | $5.0M | Open |
| Jan 6, 2026 | Interior Alterations | Proposed for interior alterations to install writable glass screens on existing interior walls. | $100K | Closed |
| Dec 17, 2025 | Building Permit Related(MS) | HVAC - Proposal for the construction of a 43-storey mixed-use rental apartment building with 1 level below grade. | — | Open |
| Dec 17, 2025 | Site Service | Site Services - Proposal for the construction of a 43-storey mixed-use rental apartment building with 1 level below grade. | $250K | Open |
| Dec 17, 2025 | Building Permit Related (DR) | Drain - Proposal for the construction of a 43-storey mixed-use rental apartment building with 1 level below grade. | — | Open |
| Dec 17, 2025 | Building Permit Related(PS) | Plumbing - Proposal for the construction of a 43-storey mixed-use rental apartment building with 1 level below grade. | — | Open |
| Dec 17, 2025 | New Building | Proposal for the construction of a 44-storey mixed-use rental apartment building with 1 level below grade, comprising 547 residential units, including 140 affordable units, and a total of 2,402 sqm of non-residential gross floor area. | $250.0M | New build |
| Dec 8, 2025 | Building Permit Related(MS) | REVISION - Addition of fire dampers to existing ductwork. Minor modification to grille and diffuser layout.HVAC - Proposal for interior renovation at the Fluoroscopy Room 2115 and 2148 | — | Open |
| Dec 3, 2025 | Demolition | Proposal for demolition full building and backfill to grade. | — | Demolition |
| Oct 27, 2025 | Building Permit Related(PS) | Plumbing - Proposal for repairs due to flood damage in basement levels 1 & 2 and ground floor level. | — | Open |
| Oct 24, 2025 | Building Permit Related(MS) | HVAC - Proposal for repairs due to flood damage in basement levels 1 & 2 and ground floor level. | — | Open |
| Oct 23, 2025 | Interior Alterations | Proposal for repairs due to flood damage in basement levels 1 & 2 and ground floor level. | $753K | Open |
| Sep 2, 2025 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to level 10 Eaton South Refresh. (Nursing Station,Med Room,Shower Room) | — | Open |
| Sep 2, 2025 | Building Permit Related(MS) | HVAC - Proposed interior alterations to level 10 Eaton South Refresh. (Nursing Station,Med Room,Shower Room) | — | Open |
| Aug 29, 2025 | Interior Alterations | Proposed interior alterations to level 10 Eaton South Refresh. (Nursing Station,Med Room,Shower Room) | $1.2M | Open |
| Jun 25, 2025 | Building Permit Related(MS) | HVAC - Proposal for renovation of Existing CDIU#1(rm 4143) to accommodate new medical treatment equipment. | — | Closed |
| Jun 25, 2025 | Interior Alterations | Proposal for renovation of Existing CDIU#1(rm 4143) to accommodate new medical treatment equipment. | $1.1M | Closed |
| Jun 17, 2025 | Building Permit Related(MS) | HVAC - Proposal to replace roof top unit and HVAC equipments(Duscts, Grills, AHU's and MAU's) in the existing apartment building, on floors ; ground, second, third (750 m2) . | — | Open |
| Jun 5, 2025 | Interior Alterations | Rev 01: the stamped structural stud shop drawings that have been received from the contractor. This is just a supplemental document to our existing permit, there are no changes to the permit documents. Interior alterations - for a new Ronald McDonald House charities (RMHC) family Room, ncluding asso | — | Closed |
| Jun 4, 2025 | Other(PS) | Hemodialysis equipment replacement and associated plumbing work atTGH basement and ground floor. | $1.0M | Closed |
| May 29, 2025 | Temporary Structures | Proposed temporary mobile stage in UHN parking lot for ' We Walk UHNITED' charity walk.Date erected: Friday May 30, 2025Date removed: Saturday May 31, 2025 | — | Open |
| May 26, 2025 | Building Permit Related(PS) | Plumbing - Proposal for renovation of Existing CDIU#1(rm 4143) to accommodate new medical treatment equipment. | — | Closed |
The 40 most recent of 332 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.