thepermitmap

Street · 1013 of 8,565 by permit count

Building permits on Eileen Ave

The City of Toronto has 184 building permits on record for Eileen Ave, going back to 2000. Those permits created 31 homes and removed 0, a net change of +31. Declared construction value totals $122.5M. The most recent permit was applied for Sep 4, 2026 at 94 Eileen Ave.

Permits on record
1842000–2026
Declared construction value
$122.5Mas filed, not adjusted
Homes created
31dwelling units
Homes removed
0net +31

Permits issued per year

20002026 (part year)

Most common work

  • Building Permit Related(PS)35 · 19%
  • Building Permit Related(MS)28 · 15%
  • Back Water Valve (Sewer only)27 · 15%
  • Multiple Projects17 · 9%
  • Garage13 · 7%
  • Interior Alterations10 · 5%
  • New Building5 · 3%
  • Addition(s)5 · 3%
  • Accessory Building(s)5 · 3%
  • Partial Permit - Foundation4 · 2%
  • Partial Permit - Structural Framing4 · 2%
  • Porch4 · 2%

Structures worked on

  • SFD - Detached120 · 65%
  • SFD - Semi-Detached23 · 13%
  • Parking Garage10 · 5%
  • Other9 · 5%
  • Industrial5 · 3%
  • 2 Unit - Semi-detached4 · 2%
  • Laneway / Rear Yard Suite4 · 2%
  • 3+ Unit - Detached3 · 2%
  • Unspecified2 · 1%
  • 2 Unit - Detached1 · 1%
  • Warehouse1 · 1%
  • Residential Porches1 · 1%

Most recent permits

Issued Work What was filed Value Status
Sep 4, 2026 Building Permit Related(PS) Rev :01 - Revision to plumbing permitPlumbing - Proposal for multiple projects (secons storey rear addition, rear yard deck and interior alterations). Open
Sep 4, 2026 Multiple Projects REVISION 02: Permit revisionREVISION 01:Proposal for multiple projects (second storey rear addition, rear yard deck and interior alterations). Open
Jun 16, 2026 Building Permit Related(PS) Plumbing - Proposal for Garden suite in rear yard. Open
Jun 16, 2026 Building Permit Related(MS) HVAC - Proposal for Garden suite in rear yard. Open
Jun 16, 2026 Building Permit Related (DR) Drain - Proposal for Garden suite in rear yard. Open
Jun 16, 2026 New Laneway / Rear Yard Suite Proposal for Garden suite in rear yard. $150K Open
May 14, 2026 Accessory Building(s) PROPOSED CABANA $40K Open
May 8, 2026 Building Permit Related(MS) HVAC - Proposed interior alterations to all floors of the existing single family dwelling including modifications to the existing HVAC system. Open
May 5, 2026 Building Permit Related(PS) Plumbing - Proposed interior alterations to all floors of the existing single family dwelling including modifications to the existing HVAC system. Open
May 5, 2026 Interior Alterations Proposed interior alterations to all floors of the existing single family dwelling including modifications to the existing HVAC system. $50K Open
Apr 13, 2026 Building Permit Related(PS) Plumbing - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 2 contains 3 buildings with a total of 27 dwelling units. Open
Apr 13, 2026 Building Permit Related(MS) HVAC - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 2 contains 3 buildings with a total of 27 dwelling units. Open
Mar 3, 2026 Back Water Valve (Sewer only) supply and install backwater valve Closed
Dec 12, 2025 Building Permit Related(MS) HVAC - Proposal for multiple projects (second storey rear addition, rear yard deck and interior alterations). Open
Nov 5, 2025 Unspecified Deferred Fees from folder 25 143974 (RSN-5614955) ZoningProcess RSN 77300400 Open
Oct 17, 2025 Alternative Solution Proposal for evaluation of alternative solutions for fire department access route Refer: 25 143974 BLD 00 NB, 25 144101 BLD 00 NB, 25 144076 BLD 00 NB, 25 144139 BLD 00 NB Closed
Sep 18, 2025 Building Permit Related(MS) HVAC - Proposa for a second floor addition and second floor interior alterations to the existing 2 storey SFD-detached dwelling. See also 23 179014 ZAP. Open
Sep 9, 2025 Partial Permit - Foundation Conditional Permit - Part Permit - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 2 contains 3 buildings with a total of 27 dwelling units. Closed
Sep 9, 2025 Partial Permit - Structural Framing Part Permit - Proposal for underground parking garage for townhouse block 2. Open
Sep 9, 2025 Partial Permit - Foundation Part Permit - Proposal for underground parking garage for townhouse block 2. Open
Sep 9, 2025 Partial Permit - Structural Framing Part Permit - BLOCK 1 - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 1 contains 3 buildings with a total 31 dwelling units. Open
Sep 9, 2025 Partial Permit - Foundation Part Permit - Proposal for underground parking garage for townhouse block 1. Open
Sep 9, 2025 Partial Permit - Structural Framing Part Permit - Proposal for underground parking garage for townhouse block 1. Open
Sep 9, 2025 Partial Permit - Structural Framing Part Permit - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 2 contains 3 buildings with a total of 27 dwelling units. Open
Sep 9, 2025 Partial Permit - Foundation Part Permit - BLOCK 1 - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 1 contains 3 buildings with a total 31 dwelling units. Open
Aug 26, 2025 Back Water Valve (Sewer only) Backwater valve installation. Closed
Jul 10, 2025 Other(SR) Installation of Solar Photovoltaic System on rooftop.(Solar Panel) $18K Closed
Jun 17, 2025 Multiple Projects Revision 01: Proposal to revise interior layout, stairs landing and three windows.Add 2 Kitchens, and Dry Wall and 2 Balconies ( swap out existing sinks (Plumbing permit not required) Convert duplex to Fourplex Closed
Jun 6, 2025 Building Permit Related(MS) HVAC - Proposal to construct a new two-storey rear addition and a new rear ground-floor deck for the existing detached two storey single family dwelling.See also 25-111132 ZAP 00 ZR Closed
May 29, 2025 Building Permit Related(PS) Plumbing - Proposal to construct a new two-storey rear addition and a new rear ground-floor deck for the existing detached two storey single family dwelling.See also 25-111132 ZAP 00 ZR Closed
May 21, 2025 Multiple Projects Proposal to construct a new two-storey rear addition and a new rear ground-floor deck for the existing detached two storey single family dwelling.See also 25-111132 ZAP 00 ZR $500K Closed
May 15, 2025 Building Permit Related(MS) HVAC - Proposal for underground parking garage for townhouse block 2. Open
May 15, 2025 Building Permit Related(PS) Plumbing - Proposal for underground parking garage for townhouse block 2. Open
May 8, 2025 Building Permit Related(MS) HVAC - Proposal for underground parking garage for townhouse block 1. Open
May 8, 2025 Building Permit Related(PS) Plumbing - Proposal for underground parking garage for townhouse block 1. Open
May 2, 2025 Building Permit Related(MS) HVAC - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 1 contains 3 buildings with a total 31 dwelling units. Open
May 2, 2025 Building Permit Related(PS) Plumbing - Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 1 contains 3 buildings with a total 31 dwelling units. Open
Apr 14, 2025 New Building Proposal for underground parking garage for townhouse block 1. $40.0M New build
Apr 14, 2025 New Building Proposal for 6 x 3 storey part 9 townhouse buildings in 2 blocks. Buildings comprised of back-to-back 3- & 4-bedroom units. Block 2 contains 3 buildings with a total of 27 dwelling units. $40.0M New build
Apr 14, 2025 New Building Proposal for underground parking garage for townhouse block 2. $40.0M New build

The 40 most recent of 184 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
184
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-559