Street · 69 of 8,565 by permit count
Building permits on Dovercourt Rd
The City of Toronto has 1,544 building permits on record for Dovercourt Rd, going back to 1973. Those permits created 359 homes and removed 16, a net change of +343. Declared construction value totals $88.0M. The most recent permit was applied for Sep 4, 2026 at 756 Dovercourt Rd.
- Permits on record
- 1,5441973–2026
- Declared construction value
- $88.0Mas filed, not adjusted
- Homes created
- 359dwelling units
- Homes removed
- 16net +343
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Dovercourt Village 420 permits
Little Portugal 371 permits
Palmerston-Little Italy 212 permits
Trinity-Bellwoods 208 permits
Dufferin Grove 119 permits
West Queen West 81 permits
Wychwood 68 permits
Junction-Wallace Emerson 39 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 4, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to fit out a vacant commercial unit as a UPS Store | — | Open |
| Sep 1, 2026 | Interior Alterations | Proposal for interior alterations to fit out a vacant commercial unit as a UPS Store | $45K | Open |
| Aug 14, 2026 | Building Permit Related(MS) | HVAC - PROPOSED INTERIOR ALTERATIONS TO CREATE SECONDARY SUITE IN BASEMENT | — | Open |
| Aug 14, 2026 | Building Permit Related(MS) | HVAC - Proposal to alter existing garage and convert it into an laneway suite. | — | Open |
| Aug 13, 2026 | Back Water Valve (Sewer only) | Back water valve installation to existing dwelling | — | Closed |
| Aug 13, 2026 | Building Permit Related (DR) | Drain - Construct new 2 storey laneway suite | — | Open |
| Aug 13, 2026 | Building Permit Related(PS) | Plumbing - Construct new 2 storey laneway suite | — | Open |
| Aug 13, 2026 | New Laneway / Rear Yard Suite | Construct new 2 storey laneway suite | $600K | Open |
| Aug 13, 2026 | Building Permit Related(MS) | HVAC - Construct new 2 storey laneway suite | — | Open |
| Aug 11, 2026 | Multiple Projects | REV 06: Proposal to revise soft landscaping in the backyard and to keep the existing inground hot tub. Rev 05Rev 04: revision to remove proposed deck including privacy walls and footings and the addition of structural elements to replace previously proposed elements.Rev 03: revision for a two skylig | — | Closed |
| Aug 10, 2026 | Interior Alterations | Proposal for structural replacement of damaged exterior wall repair. | $20K | Open |
| Jul 31, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS TO CREATE SECONDARY SUITE IN BASEMENT | — | Open |
| Jul 31, 2026 | Second Suite (New) | PROPOSED INTERIOR ALTERATIONS TO CREATE SECONDARY SUITE IN BASEMENT | $350K | Open |
| Jul 7, 2026 | Multiple Projects | REVo1: Proposed revision is clouded in the attached basement plan Proposed interior alterations and third floor addition to convert an existing 2-unit dwelling with rooming house in one of the units into a 4-unit dwelling. Proposed exterior stairs at rear. | — | Open |
| Jul 6, 2026 | New Building | REVISION 03: ADDED FIRE ALARMREVISION 02: PLUMBING LOCATION IN RETAIL UNIT ONLYREVISION 01: Proposing to extend stair overrun onto rooftop patio and structural changes below.Three storey building on the existing foundation containing four residential dwelling units and retail on the ground floor. | — | New build |
| Jun 26, 2026 | Interior Alterations | Proposal for interior alterations to remove non-load bearing partitions | $10K | Open |
| Jun 25, 2026 | Back Water Valve (Sewer only) | Proposed installation of backwater valve for single family dwelling. | — | Closed |
| Jun 18, 2026 | New Laneway / Rear Yard Suite | Proposed second storey addition to existing garage to create laneway suite. | $80K | Open |
| Jun 18, 2026 | Building Permit Related (DR) | Drain - Proposed second storey addition to existing garage to create laneway suite. | — | Open |
| Jun 18, 2026 | Building Permit Related(PS) | Plumbing - Proposed second storey addition to existing garage to create laneway suite. | — | Open |
| Jun 18, 2026 | Building Permit Related(MS) | HVAC - Proposed second storey addition to existing garage to create laneway suite. | — | Open |
| Jun 16, 2026 | New Laneway / Rear Yard Suite | Revision 02: Revision to permit (as bubbled) | — | Closed |
| Jun 15, 2026 | Other(SR) | Proposal to repair existing patio roof. | $10K | Closed |
| Jun 11, 2026 | Fire Alarm | Proposed fire alarm system upgrades. | $169K | Open |
| Jun 5, 2026 | Building Permit Related(MS) | HVAC - Proposal for finished basement. | — | Open |
| May 26, 2026 | Multiple Projects | Revision: changes to proposed second floor and exterior stairs | — | Closed |
| May 13, 2026 | Interior Alterations | Interior alterations to convert 2 units into 3 unitsAPPLICAITON REVISED TO 3 UNITS - 7.16.26 | $30K | Open |
| May 12, 2026 | Building Permit Related(MS) | REV 01: Revision to HVACHVAC - Proposal for a new garden suite at the rear of existing SFD-Semi-Detached. | — | Open |
| May 5, 2026 | Building Permit Related(MS) | HVAC - Proposal to demolish existing detached garage and construction of a new laneway suite. | — | Open |
| May 4, 2026 | Back Water Valve (Sewer only) | Replacement of clay pipe sanitary line and installation of a backwater valve | — | Closed |
| May 1, 2026 | Multiple Projects | Proposed third floor addition for residential unit to existing mixed use building. Addition includes rooftop patio | $500K | Open |
| Apr 28, 2026 | Finishing Basements | Proposal for finished basement. | $120K | Open |
| Apr 28, 2026 | Building Permit Related(PS) | Plumbing - Proposal for finished basement. | — | Open |
| Apr 24, 2026 | Fire Alarm | Proposal to upgrade fire alarm system. | $169K | Closed |
| Apr 24, 2026 | New Laneway / Rear Yard Suite | Proposed new garden suite | $1.0M | Open |
| Apr 17, 2026 | Finishing Basements | Proposed finished basement. | $120K | Closed |
| Apr 13, 2026 | Building Permit Related(MS) | REV HVAC - Proposed revision includes changes to windows and ground floor mechanical roomProposal to construct a 2 storey laneway suite. | — | Open |
| Apr 13, 2026 | Garage Repair/Reconstruction | Proposed concrete repairs and waterproofing replacement | $300K | Open |
| Apr 13, 2026 | New Laneway / Rear Yard Suite | REVISION 01 : Proposed revision includes changes to windows and ground floor mechanical roomProposal to construct a 2 storey laneway suite. | — | Open |
| Apr 7, 2026 | Back Water Valve (Sewer only) | INSTALL BACK WATER VALVE | — | Closed |
The 40 most recent of 1,544 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.