thepermitmap

Street · 5702 of 8,567 by permit count

Building permits on Dora Ave

The City of Toronto has 18 building permits on record for Dora Ave, going back to 1992. Those permits created 134 homes and removed 2, a net change of +132. Declared construction value totals $18.2M. The most recent permit was issued May 8, 2026 at 17 Dora Ave.

Permits on record
181992–2026
Declared construction value
$18.2Mas filed, not adjusted
Homes created
134dwelling units
Homes removed
2net +132

Permits issued per year

20162026 (part year)

Most common work

  • Unknown3 · 17%
  • Demolition2 · 11%
  • Backflow Prevention Devices (Water only)2 · 11%
  • Fire Alarm1 · 6%
  • Inside and Outside Drains1 · 6%
  • Building Permit Related(MS)1 · 6%
  • New Building1 · 6%
  • Building Permit Related (DR)1 · 6%
  • Other(BA)1 · 6%
  • Building Permit Related(PS)1 · 6%
  • Partial Permit - Shoring1 · 6%
  • Partial Permit - Foundation1 · 6%

Structures worked on

  • Transit Station,Subway, Bus Terminal7 · 39%
  • Apartment Building3 · 17%
  • Unknown3 · 17%
  • Industrial2 · 11%
  • SFD - Detached1 · 6%
  • Warehouse1 · 6%
  • Unspecified1 · 6%

Most recent permits

Issued Work What was filed Value Status
May 8, 2026 New Building Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vest $10.0M New build
Feb 2, 2026 Building Permit Related(PS) Plumbing - Provide domestic water, sanitary drainage, and storm drainage systems for the Lower-Level Station Building; storm drainage systems for elevators, mini-hub rooms, stair entrances, platform shelters, and mini-platforms; non-freeze ground hydrants on passenger platforms; and domestic water, Open
Feb 2, 2026 Building Permit Related(MS) HVAC - Proposal to provide HVAC systems for the Lower-Level Station Building, Elevators, Mini-hub rooms, and Maintenance Building, including heating, cooling, and ventilation, as well as snow melt systems for passenger platforms.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 st Open
Feb 2, 2026 Inside and Outside Drains Conditional Permit - Drain - Water, Storm and Sanitary Site Services to support new transit station building, platforms, covered shelters, hub rooms and Maintenance Building.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and we Open
Jan 27, 2026 Building Permit Related (DR) Drain - Water, Storm and Sanitary Site Services to support new transit station building, platforms, covered shelters, hub rooms and Maintenance Building.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered Open
Dec 2, 2025 Demolition Proposal for demolition of existing 2 storey house located in industrial zone. Demolition
Oct 22, 2025 Alternative Solution Proposed Alternative Solution application for Timed Egress Analysis of the Bloor Lansdowne SmartTrack Station Closed
Jul 25, 2025 Partial Permit - Foundation Conditional Permit - Part Permit - Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no p Closed
May 28, 2025 Partial Permit - Shoring Conditional Permit - Part Permit - Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no p Closed
Sep 26, 2024 Demolition Proposal for demolish/remove existing (non -residential) building within the property limit, grade to match existing level Demolition
Mar 13, 2023 Other(BA) PROPOSED: INSTALLATION OF NEW MOULDINGS ON EIFS CONTROL JOINTS AT EXTERIOR WALLS. $220K Open
May 13, 2022 Backflow Prevention Devices (Water only) Installation of backflow preventer and expansion tank $2K Closed
Dec 21, 2018 Interior Alterations Interior alterations to remove sprinklers. $50K Closed
Sep 27, 2018 Fire Alarm Proposal to replace fire alarm panel. $15K Open
May 11, 2016 Backflow Prevention Devices (Water only) Proposed Backflow Prevention Devices (Water only) $1K Closed
Aug 20, 1993 Unknown ALTER PLANS AS APPROVED UNDER APPL.342208 BY CONSTRUCTING HYDRO TRANSFORMER VAULT BELOW GRADE SS $18K Closed
Jun 18, 1993 Unknown CONSTRUCT 8 STOREY SOCIAL HOUSING BUILDING CONTAINING 134 DWELLING UNITS HOLD FOR SURVEY APPROVAL-OK SS/JKL HOLD FOR SHOP DRAWINGS SPRINKLER APPLICATION $7.9M Closed
Dec 30, 1992 Unknown ALTER EXISTING SPRINKLER SYSTEM SS/TC. 15 Dora Av is a convenience address for 17 DOra Av $9K Closed

The 18 most recent of 18 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
18
City refresh
2026-09-13 10:24
Page built
2026-09-13
Sheet
STR-469