Street · 1157 of 8,565 by permit count
Building permits on Dingwall Ave
The City of Toronto has 165 building permits on record for Dingwall Ave, going back to 1996. Those permits created 2 homes and removed 0, a net change of +2. Declared construction value totals $3.6M. The most recent permit was issued Nov 13, 2025 at 17 Dingwall Ave.
- Permits on record
- 1651996–2025
- Declared construction value
- $3.6Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 0net +2
Permits issued per year
20002025 (part year)
Most common work
Structures worked on
Where this street runs
Blake-Jones 107 permits
North Riverdale 53 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Nov 13, 2025 | Building Permit Related(MS) | Revision 01: Update current HVAC drawings to change BSMT boiler system to Forced Air System. HVAC - Proposal to construct a rear addition and interior alterations to existing SFD to add a secondary unit | — | Closed |
| Jun 9, 2025 | Multiple Projects | Rev 01: Revision to the buidling permit # 24 226713 BLD SR for Underpinning to raise the height of the basement 12" (total underpinning length 25m)Proposal to construct a rear addition and interior alterations to existing SFD to add a secondary unit | — | Closed |
| May 6, 2025 | Party Wall Admin Permits | Party Wall Admin Permit to the work in 17 Dingwall Ave | $1K | Open |
| Nov 20, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct a rear addition and interior alterations to existing SFD to add a secondary unit | — | Closed |
| Nov 20, 2024 | Building Permit Related (DR) | Drain - Proposal to construct a rear addition and interior alterations to existing SFD to add a secondary unit | — | Open |
| Feb 26, 2024 | Multiple Projects | REV01: Proposed revision to do structural alterations for cathedral ceiling on the third floor and partywall work, and the layout has been changed to the second floor. Proposed third floor addition with interior alterations to existing SFD semi-detached. | — | Closed |
| Feb 26, 2024 | Party Wall Admin Permits | Admin Permit for required work for Permit # 23 225919 - 76 Dingwall Ave. | — | Open |
| Feb 15, 2024 | Building Permit Related(MS) | HVAC - Proposed third floor addition with interior alterations to existing SFD semi-detached. | — | Closed |
| Jan 4, 2024 | Building Permit Related(PS) | Plumbing - Proposed third floor addition with interior alterations to existing SFD semi-detached. | — | Closed |
| Jul 20, 2023 | Other(SR) | Admin permit for the work at 42 Dingwall Ave. see 23 165107 | — | Closed |
| Jul 11, 2023 | Deck | Remove existing rear framed deck and construct new c/w steps to grade | $10K | Closed |
| Jun 23, 2023 | Building Permit Related(PS) | Plumbing - Proposal for a third floor rear addition, and interior alteration to an existing three storey semi-detached single family dwelling. See also 22 185880 ZAP and 22 235100 MV. | — | Open |
| Jun 23, 2023 | Multiple Projects | Proposal for a third floor rear addition, and interior alteration to an existing three storey semi-detached single family dwelling. See also 22 185880 ZAP and 22 235100 MV. | $50K | Open |
| May 1, 2023 | Deck | REMOVE EXISTING REAR FRAMED DECK AND CONTRUCT NEW C/WSTEPS TO GRADE | $10K | Closed |
| Mar 20, 2023 | Multiple Projects | Proposed unfinished basement | — | Closed |
| Dec 12, 2022 | Building Permit Related (DR) | Drain - finish basement, underpinning, drains, plumbing fixtures | — | Closed |
| Dec 12, 2022 | Building Permit Related(PS) | Plumbing - finish basement, underpinning, drains, plumbing fixtures | — | Closed |
| Nov 3, 2022 | Building Permit Related(MS) | HVAC - Proposal for Interior alterations to all floors, window changes and underpinning. | — | Closed |
| Oct 28, 2022 | Carport | Proposal for a new carport at the rear of the house. | $8K | Closed |
| Jun 8, 2022 | Addition(s) | Rev 01 : Revision to 21 247940 BLD 00 SR for foundation workProposal to construct a rear 2nd floor addition to an existing 2 storey SFD-semi dwelling.See also 21 232384 ZZC. | — | Closed |
| Jun 6, 2022 | Party Wall Admin Permits | Proposal for a party wall permit for work at 62 Bingwall Ave 22 149374 BLD 00 SR. | — | Closed |
| Jun 6, 2022 | Multiple Projects | Proposal for Interior alterations to all floors, window changes and underpinning. | $90K | Closed |
| Jun 6, 2022 | Building Permit Related(PS) | Plumbing - Proposal for Interior alterations, window changes and underpinning. | — | Closed |
| Jan 10, 2022 | Multiple Projects | Construct a new ground floor rear addition, a new rear ground floor deck and a new rear yard basement walkout staircase for the existing single family detached dwelling. | $250K | Open |
| Nov 15, 2021 | Building Permit Related(MS) | HVAC - Proposal for new floor area on the third floor area, increase size of existing third floor dormer. | — | Closed |
| Nov 5, 2021 | Party Wall Admin Permits | Party wall admin permit related to 81 DINGWALL AVE (21 206682 BLD 00 SR) | — | Closed |
| Nov 5, 2021 | Party Wall Admin Permits | Party wall admin permit related to 81 DINGWALL AVE (21 206682 BLD 00 SR) | — | Closed |
| Nov 5, 2021 | Addition(s) | Proposal for new floor area on the third floor area, increase size of existing third floor dormer. | $70K | Closed |
| Nov 5, 2021 | Building Permit Related(PS) | Plumbing - Proposal for new floor area on the third floor area, increase size of existing third floor dormer. | — | Closed |
| Oct 25, 2021 | Carport | Proposal to remove existing damaged detached garage and rebuild a carport. | $10K | Closed |
| Oct 7, 2021 | Multiple Projects | Revision 01 - relocate rooms in basement, third floor - open to below has been added to the west of existing stair, structural changes to steel beam in the second floor framingProposal to construct a new two storey rear addition with roof top deck,construct a new second floor front addition, a new s | — | Open |
| Sep 29, 2021 | Building Permit Related(MS) | HVAC - Proposal to construct a 1 storey addition at the rear of an existing 2 storey SFD-detached dwelling.See also 21 107671 ZZC, 21 118964 MV and Final and Binding A0207/21TEY. | — | Closed |
| Aug 27, 2021 | Addition(s) | Proposal to construct a 1 storey addition at the rear of an existing 2 storey SFD-detached dwelling.See also 21 107671 ZZC, 21 118964 MV and Final and Binding A0207/21TEY. | $100K | Closed |
| Aug 27, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a 1 storey addition at the rear of an existing 2 storey SFD-detached dwelling.See also 21 107671 ZZC, 21 118964 MV and Final and Binding A0207/21TEY. | — | Closed |
| Jul 8, 2021 | Building Permit Related (DR) | Drain - Proposed underpinning and basement walkout | — | Closed |
| Jul 8, 2021 | Building Permit Related(PS) | Plumbing - Proposed underpinning and basement walkout | — | Closed |
| Apr 27, 2021 | Building Permit Related(PS) | Plumbing - construct a new two storey rear addition with roof top deck,construct a new second floor front addition, a new second floor front roof top deck and a new second floor front roof top green roof | — | Closed |
| Apr 27, 2021 | Building Permit Related(MS) | HVAC - construct a new two storey rear addition with roof top deck,construct a new second floor front addition, a new second floor front roof top deck and a new second floor front roof top green roof | — | Open |
| Mar 31, 2021 | Multiple Projects | Proposed underpinning and basement walkout | $55K | Closed |
| Dec 22, 2020 | Building Permit Related(MS) | HVAC - Proposal for interior alterations and construct a new rear deck | — | Closed |
The 40 most recent of 165 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.