Street · 2087 of 8,565 by permit count
Building permits on Daisy Ave
The City of Toronto has 92 building permits on record for Daisy Ave, going back to 1998. Those permits created 12 homes and removed 4, a net change of +8. Declared construction value totals $3.8M. The most recent permit was issued Jul 23, 2026 at 24 Daisy Ave.
- Permits on record
- 921998–2026
- Declared construction value
- $3.8Mas filed, not adjusted
- Homes created
- 12dwelling units
- Homes removed
- 4net +8
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 23, 2026 | Fire Damage | Proposed repairs following fire. Scope of work includes interior finishes, a small area of roof, and converting the building into a triplex. | — | Open |
| Jan 30, 2024 | New Laneway / Rear Yard Suite | Construct a 2-storey, 94.8 sqm, Garden Suite in the rear of the property at 64 Daisy Ave. | — | Closed |
| Jan 30, 2024 | Building Permit Related(PS) | Plumbing - Construct a 2-storey, 94.8 sqm, Garden Suite in the rear of the property at 64 Daisy Ave. | — | Closed |
| Jan 30, 2024 | Building Permit Related(MS) | HVAC - Construct a 2-storey, 94.8 sqm, Garden Suite in the rear of the property at 64 Daisy Ave. | — | Closed |
| Jul 31, 2023 | Building Permit Related(PS) | Plumbing - PROPOSED 2 STOREY GARDEN SUITE IN THE REAR YARD | — | Closed |
| Jul 31, 2023 | Building Permit Related(MS) | HVAC - PROPOSED 2 STOREY GARDEN SUITE IN THE REAR YARD | — | Closed |
| Jul 31, 2023 | New Laneway / Rear Yard Suite | PROPOSED 2 STOREY GARDEN SUITE IN THE REAR YARD | $375K | Open |
| Jul 31, 2023 | Building Permit Related (DR) | Drain - PROPOSED 2 STOREY GARDEN SUITE IN THE REAR YARD | — | Open |
| Mar 3, 2022 | Site Service | Revision #01 - Changes to water servicing for block A & B for ministry requirement for separation of water and sewers.Site services for proposed 73 unit townhouse development, consisting of 5 individual blocks. New storm, sanitary domestic/fire water connections. | — | Closed |
| Mar 15, 2021 | Back Water Valve (Sewer only) | install BWV for existing SFD | — | Closed |
| Feb 10, 2020 | New Building | Revision 01: revision to the method of insulation from batt to spray foamProposal to construct 16 four-storey freehold townhomes with attached garage "BLOCK B" | — | New build |
| Feb 10, 2020 | Building Permit Related(MS) | Revision 01: changes to the method of heating and ventilation for the common garageHVAC - Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development. | — | Closed |
| Feb 10, 2020 | Building Permit Related(MS) | Revision 01: changes to the method of heating and ventilation for the common garageHVAC - Proposal to construct 14 four-storey townhomes as part of Block D of a 5 block residential development. | — | Closed |
| Feb 10, 2020 | Building Permit Related(MS) | Revision 01: changes to the method of heating and ventilation for the common garageHVAC - Proposal to construct 14 four-storey townhomes as part of Block C of a 5 block residential development. | — | Closed |
| Feb 10, 2020 | New Building | Revision 01: revision to the method of insulation from batt to spray foam. Proposal to construct 15 four-storey freehold townhomes each with attached garage "BLOCK A" | — | New build |
| May 24, 2019 | Alternative Solution | Proposal for a compensating measure for incorporating a fire alarm system within a building as identified in OBC sentence 3.2.4.1.(2) by using sprinklers for providing detection throughout the townhouse block, and the sprinkler system is equipped with electrical supervision through the security moni | — | Closed |
| May 24, 2019 | Alternative Solution | Proposal for a compensating measure for incorporating a fire alarm system within a building as identified in OBC sentence 3.2.4.1.(2) by using sprinklers for providing detection throughout the townhouse block, and the sprinkler system is equipped with electrical supervision through the security moni | — | Closed |
| Dec 5, 2018 | Building Permit Related(MS) | HVAC - Proposal to construct 16 four-storey townhomes as part of Block B of a 5 block residential development. | — | Closed |
| Dec 4, 2018 | Building Permit Related(MS) | HVAC - Proposal to construct 15 four-storey townhomes as part of Block A of a 5 block residential development. | — | Closed |
| Oct 31, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct 16 four-storey townhomes as part of Block B of a 5 block residential development. | — | Closed |
| Oct 31, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct 14 four-storey townhomes as part of Block C of a 5 block residential development. | — | Closed |
| Oct 31, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development. | — | Closed |
| Oct 31, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct 14 four-storey townhomes as part of Block D of a 5 block residential development. | — | Closed |
| Oct 31, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct 15 four-storey townhomes as part of Block A of a 5 block residential development. | — | Closed |
| Oct 31, 2018 | New Building | Conditional Permit - Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development. | — | New build |
| Oct 31, 2018 | New Building | Conditional Permit - Proposal to construct 14 four-storey freehold townhomes with attached garage"BLOCK D" | — | New build |
| Oct 31, 2018 | New Building | Conditional Permit - Proposal to construct 14 four-storey freehold townhomes with attached garage "BLOCK C" | — | New build |
| Oct 24, 2018 | Alternative Solution | Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the occupied roof level (block c, d & e) fire separations required within each dwel | — | Closed |
| Oct 24, 2018 | Alternative Solution | Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the occupied roof level (block c, d & e) fire separations required within each dwel | — | Closed |
| Oct 24, 2018 | Alternative Solution | Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the occupied roof level (block c, d & e) fire separations required within each dwel | — | Closed |
| Oct 24, 2018 | Alternative Solution | Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the 4th floor (block a & b) fire separations required within each dwelling unit, fo | — | Closed |
| Sep 18, 2018 | Alternative Solution | Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the 4th floor (block a & b) fire separations required within each dwelling unit, fo | — | Closed |
| Nov 13, 2017 | Building Permit Related (DR) | Drain - Proposal to construct a small addition at front, a partial 2nd story addition over existing dwelling, interior alteration, underpinning, porch, and walk out | — | Closed |
| Nov 13, 2017 | Building Permit Related(PS) | Plumbing - Proposal to construct a small addition at front, a partial 2nd story addition over existing dwelling, interior alteration, underpinning, porch, and walk out | — | Closed |
| Jul 24, 2017 | Demolition | Proposal to demolish one-storey west portion of the building at 68 Daisy Avenue. The remaining portion of the building will continue to operate as a daycare facility. | — | Demolition |
| Jun 23, 2017 | Multiple Projects | Proposal to construct a small addition at front, a partial 2nd story addition over existing dwelling, interior alteration, underpinning, porch, and walk out | $100K | Closed |
| Jun 23, 2017 | Building Permit Related(MS) | HVAC - Proposal to construct a small addition at front, a partial 2nd story addition over existing dwelling, interior alteration, underpinning, porch, and walk out | — | Closed |
| Dec 8, 2016 | Back Water Valve (Sewer only) | Proposal to install a back water valve. | — | Closed |
| Nov 17, 2016 | Sign Building Permit Related | To erect and display two non illuminated ground signs displaying static copy, both of which are to contain two sign faces, displayed in a v-shape and measuring 4.88 m by 3.66 m at a height of 4.57 m. ** Dunparhomes.com** | — | Closed |
| Jan 13, 2016 | Building Permit Related (DR) | Drain - To sever the lot and to construct new semi detached single family dwelling with intergrated garage. (Pt 2). | — | Closed |
The 40 most recent of 92 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.