Street · 1236 of 8,565 by permit count
Building permits on Coronation Dr
The City of Toronto has 155 building permits on record for Coronation Dr, going back to 1997. Those permits created 7 homes and removed 0, a net change of +7. Declared construction value totals $21.6M. The most recent permit was issued Jan 23, 2026 at 40 Coronation Dr.
- Permits on record
- 1551997–2026
- Declared construction value
- $21.6Mas filed, not adjusted
- Homes created
- 7dwelling units
- Homes removed
- 0net +7
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jan 23, 2026 | Multiple Projects | Revision 01 - Revision includes changes to washroom layout------------------------------------------------------------------------------Proposal for complete accessibility upgrades. | — | Open |
| Nov 5, 2025 | Multiple Projects | Proposal for an addition over existing garage, secondary unit in basement and main unit on 1st floor and 2nd floor | $45K | Open |
| Sep 16, 2025 | Building Permit Related(PS) | Plumbing - Proposed second unit in basement | — | Closed |
| Sep 16, 2025 | Second Suite (New) | Proposed second unit in basement | $15K | Open |
| Aug 28, 2025 | Second Suite (New) | Interior alterations to convert basement into a second suite and convert existing garage into living space. | $50K | Closed |
| Aug 28, 2025 | Building Permit Related(PS) | Plumbing - Interior alterations to convert basement into a second suite. | — | Closed |
| Aug 12, 2025 | Sprinklers | REV : Sprinkler upgrades to existing building | — | Closed |
| Jun 9, 2025 | Inside and Outside Drains | REV 01: Storm added, water servicing into the building shifted. Loading dock length shortened and storm laterals provided for subdrains. Drain - Proposal to construct a New one storey industrial warehouse with office on mezzanine floor. | — | Open |
| Apr 15, 2025 | Building Permit Related (DR) | Revision: Delete elevator/shaft and control room | — | Open |
| Apr 3, 2025 | Building Permit Related(PS) | Revision: Delete elevator/shaft and control room | — | Open |
| Apr 1, 2025 | New Building | Proposal to construct a new 1 storey Fabric Building (storage) set on a concrete wall 3.65 m high.Total height of the proposed building is 23.47 m to the ridge from grade. | $3.5M | New build |
| Feb 7, 2025 | New Building | Revision 1: Delete elevator/shaft, relocate exterior garbage enclosure.Proposal to construct a New one storey industrial warehouse with office on mezzanine floor. | — | New build |
| Feb 4, 2025 | Building Permit Related(MS) | Revision 1: Delete elevator/shaft, relocate exterior garbage enclosure.HVAC - Proposal to construct a New one storey industrial warehouse with office on mezzanine floor. | — | Closed |
| Jan 30, 2025 | Addition(s) | ADDITION OVER EXISTING GARAGEPROPOSED UNIT | $45K | Closed |
| Jan 13, 2025 | New Laneway / Rear Yard Suite | Proposal to construct a two storey garden suite complete with a basement. | $45K | Closed |
| Jan 10, 2025 | Building Permit Related(PS) | Plumbing - Proposal for installation washer and dryer, | — | Closed |
| Jan 10, 2025 | Building Permit Related(MS) | HVAC - Proposal for installation washer and dryer, | — | Closed |
| Jan 10, 2025 | Interior Alterations | Proposal for installation washer and dryer, | $25K | Closed |
| Jun 4, 2024 | Building Permit Related(PS) | Plumbing Revision 01 - Revision includes new washroom layout.------------------------------------------------------------------------------------------Plumbing - Proposal for complete accessibility upgrades. | — | Closed |
| May 31, 2024 | Building Permit Related(MS) | HVAC Revision 01 - Revisions for new washroom layout--------------------------------------------------------------------------------------------HVAC - Proposal for complete accessibility upgrades. | — | Closed |
| May 23, 2024 | Demolition | Proposal to demolish the 1 storey existing office building.See also 24 127109 BLD for future development. | — | Demolition |
| May 6, 2024 | Interior Alterations | Proposed alterations to the shipping area. Remove internal walls and make room for an office. In addition, pit to be built in the fume room | $60K | Open |
| Dec 12, 2023 | Interior Alterations | Proposal to repair the roof and exterior wall of the existing single family dwelling following tree impact. | — | Open |
| Nov 7, 2023 | Sprinklers | design and installation of alterations to existing sprinkler system | $140K | Closed |
| Jun 15, 2023 | New Building | construct fabric building for waste transfer/sorting facility | $150K | New build |
| May 11, 2023 | Other(MS) | Revision #01 - Changes to remove the butylithium room, make up air unit and bulk tank storgage and associated ventialation.Mechanical Upgrades to Tank Storage Room | — | Closed |
| May 9, 2023 | Back Water Valve (Sewer only) | Install backwater valve | — | Closed |
| Feb 24, 2023 | HVAC: Group F up to 230 Sq M | 500G PROCESS ROOM HVAC REPLACEMENT OF EXISTING | $20K | Closed |
| Aug 10, 2022 | Interior Alterations | Proposed demolition of interior non-loadbearing wall to combine two storage rooms and a washroom to create an office, and create a spill containment pit inside a walk-in fumehood in the main packaging area. | $230K | Open |
| Aug 1, 2021 | Porch | Construct front porch | $20K | Closed |
| Jun 22, 2021 | Interior Alterations | Vehicle Impact - the damaged section of the exterior stud wall and knee wall must be reconstructed to match existing. Selective removal and replacement of interior wall finishes and insulation on the north exterior wall of the basement bedroom will be required. Exterior sheathing must be selectively | $30K | Closed |
| Mar 10, 2021 | Backflow Prevention Devices (Water only) | Installation of backflow preventer | $2K | Closed |
| Feb 26, 2021 | Backflow Prevention Devices (Water only) | Proposal to install a 2" D.C.V.A. back flow prevention device in the existing retail store. | $3K | Closed |
| Feb 23, 2021 | Walk-Out Stair | Proposed new door to be located on right side of dwelling. | $3K | Open |
| Nov 1, 2020 | Backflow Prevention Devices (Water only) | Proposal to install backflow prevention device | $1K | Closed |
| Jul 23, 2020 | Building Permit Related(PS) | Plumbing - New boys washroom. Boiler room renovation. New A/C for the existing gymnasium. | — | Closed |
| Jul 23, 2020 | Building Permit Related(MS) | HVAC - New boys washroom. Boiler room renovation. New A/C for the existing gymnasium. | — | Closed |
| Jul 23, 2020 | Interior Alterations | New boys washroom. Boiler room renovation. New A/C for the existing gymnasium. | $400K | Closed |
| Jul 8, 2020 | Building Permit Related(MS) | HVAC - Proposed new two storey dwelling with attached garage. | — | Closed |
| Mar 16, 2020 | New Building | Proposed new two storey dwelling with attached garage. | $350K | New build |
The 40 most recent of 155 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.