Street · 924 of 8,567 by permit count
Building permits on Commander Blvd
The City of Toronto has 199 building permits on record for Commander Blvd, going back to 1999. Declared construction value totals $51.1M. The most recent permit was issued Jul 24, 2026 at 45 Commander Blvd.
- Permits on record
- 1991999–2026
- Declared construction value
- $51.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 24, 2026 | Other(FS) | Sprinkler backflow preventer installation | $6K | Open |
| Feb 6, 2026 | Sign Building Permit Related | 1 overhanging structrue sign**XIAO LONG BAO** | — | Open |
| Jan 30, 2026 | Sign Building Permit Related | 1 Roof Sign | — | Closed |
| Jan 20, 2026 | Fire Alarm | Proposal for Fire Alarm System installation | $80K | Open |
| Jan 16, 2026 | Addition(s) | REV: (PROPOSAL TO CONSTRUCT ADDITION C) (DS 2/24/25)Proposal to construct two new 1 storey additions (Additions A & B) to an existing warehouse building. See also 24 100810 ZAP. | — | Open |
| Oct 6, 2025 | Interior Alterations | Proposal for reinforcement of roof truss to facilitate the installation of replacement rooftop units of higher weight. | $171K | Closed |
| Aug 27, 2025 | Interior Alterations | Proposal for reinforcement of roof truss to facilitate the installation of replacement rooftop units of higher weight | $120K | Closed |
| May 13, 2025 | Interior Alterations | Proposal to repair impact damages to the structure. | $10K | Open |
| Mar 28, 2025 | Backflow Prevention Devices (Water only) | install backflow preventor | $3K | Open |
| Feb 27, 2025 | Building Permit Related(MS) | REV HVAC - One storey Addidion - Addition CProposal to construct two new 1 storey additions (Additions A & B) to an existing warehouse building. See also 24 100810 ZAP. | — | Open |
| Feb 27, 2025 | Building Permit Related(PS) | REV Plumbing - One storey Addidion - Addition CProposal to construct two new 1 storey additions (Additions A & B) to an existing warehouse building. See also 24 100810 ZAP. | — | Open |
| Nov 15, 2024 | Backflow Prevention Devices (Water only) | To replace existing 4" premise isolation backflow preventer and install an additional 3" backflow preventer for premise isolation - Estee Lauder Cosmetics | $36K | Closed |
| Aug 2, 2024 | Interior Alterations | REVISION 06 - REVISION TO PERMIT # 22 114146REVISIONS HAVE BEEN MADE TO REFLECT ONSITE CONSTRUCTION. AS WELL AS THECONSTRUCTION OF THE TEMPORARY MAINTENANCE SHOP REPLACING THE CURRENTCLEANING ROOM OUTLINED IN THE ORIGINAL PERMIT. | — | Open |
| Jun 26, 2024 | Building Permit Related(MS) | REV - HVAC - interior alterations to existing industrial building | — | Closed |
| Jun 17, 2024 | Building Permit Related(PS) | REV Plumbing - interior alterations to existing industrial building | — | Open |
| Apr 16, 2024 | Other(BA) | Proposed steel lintel replacment of overhead door. | $10K | Open |
| Nov 2, 2023 | Site Service | Proposed addition of new exterior 6" sanitary line to the building | $100K | Closed |
| Oct 2, 2023 | Fire Alarm | REPLACEMENT OF FIRE ALARM CONTROL PANEL; ALL ZONING AND DEVICES TO REMAIN THE SAME. | $10K | Open |
| Apr 28, 2023 | Building Permit Related(MS) | REV #01 - Revison to cleaning room renovationsHVAC - Interior alteration to existing industrial space to construct cleaning room | — | Open |
| Mar 16, 2023 | Site Service | PROPOSED: INSTALLATION OF 6" UNDERGROUND STORM DRAINS HAS CHANGED LOCATIONS AS SHOWN ON PREVIOUS PERMIT 19 210309 STS (ESTEE LAUDER) | $100K | Open |
| Aug 30, 2022 | Addition(s) | REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'Sconstruct 2 storey addition at southwest side, Phase 3B | — | Closed |
| Jul 22, 2022 | Building Permit Related(PS) | REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'SPlumbing - construct 2 storey addition at southwest side, Phase 3B | — | Closed |
| Jul 22, 2022 | Building Permit Related(MS) | REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'SHVAC - construct 2 storey addition at southwest side, Phase 3B | — | Closed |
| May 17, 2022 | Interior Alterations | Proposal to install free standing racking storage system in the existing warehouse. | $77K | Open |
| Mar 1, 2022 | Interior Alterations | REV #1-REVISE LAYOUT AS PER NEW APPLICANTProposing interior alteration to make a new lunch room, washrooms and HVAC equipment | — | Closed |
| Feb 2, 2022 | Electromagnetic Locks | Revision 01. Delete 1 maglock from the approved previous permitProposal to install 6 maglocks for existing industrial | — | Closed |
| Dec 24, 2021 | Building Permit Related(MS) | HVAC - install exterior dust collector | — | Closed |
| Dec 24, 2021 | Exterior Tank & Support | install exterior dust collector | $175K | Closed |
| Dec 9, 2021 | Building Permit Related(PS) | REV #1-REVISE LAYOUT AS PER NEW APPLICANTPlumbing - Proposing interior alteration to make a new lunch room, washrooms and HVAC equipment | — | Closed |
| Dec 8, 2021 | Building Permit Related(MS) | REV #1-REVISE LAYOUT AS PER NEW APPLICANTHVAC - Proposing interior alteration to make a new lunch room, washrooms and HVAC equipment | — | Closed |
| Sep 15, 2021 | Building Permit Related(MS) | HVAC - interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder" | — | Closed |
| Sep 9, 2021 | Building Permit Related(PS) | Plumbing - interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder" | — | Closed |
| Sep 9, 2021 | Interior Alterations | interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder" PHASE 3A | $29.0M | Open |
| Jun 9, 2021 | Electromagnetic Locks | Install 4 maglocks | $4K | Closed |
| Jan 22, 2021 | Building Permit Related(PS) | Plumbing - ground floor drainage replacement | — | Closed |
| Jan 22, 2021 | Interior Alterations | ground floor drainage replacement | $200K | Closed |
| Nov 3, 2020 | Sign Building Permit Related | The proposal contains one illuminated ground sign, displaying static copy located along the north frontage.****LELAND**** | — | Closed |
| Sep 24, 2020 | Fire Damage | Proposed new Fire Damage repairs to building. | — | Closed |
| Jul 30, 2020 | Building Permit Related(MS) | HVAC - Proposed interior alterations to update fire separations, install spill containment system, modify HVAC and lighting. | — | Closed |
| Jul 30, 2020 | Interior Alterations | Proposed interior alterations to update fire separations, install spill containment system, modify HVAC and lighting. | $50K | Closed |
The 40 most recent of 199 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.