thepermitmap

Street · 4873 of 8,565 by permit count

Building permits on Coltbridge Crt

The City of Toronto has 25 building permits on record for Coltbridge Crt, going back to 2001. Those permits created 3 homes and removed 0, a net change of +3. Declared construction value totals $1.1M. The most recent permit was issued Jun 22, 2026 at 7 Coltbridge Crt.

Permits on record
252001–2026
Declared construction value
$1.1Mas filed, not adjusted
Homes created
3dwelling units
Homes removed
0net +3

Permits issued per year

20012026 (part year)

Most common work

  • Building Permit Related(PS)4 · 16%
  • Building Permit Related(MS)3 · 12%
  • Multiple Projects3 · 12%
  • Addition(s)3 · 12%
  • New Building2 · 8%
  • Building Permit Related (DR)2 · 8%
  • Backflow Prevention Devices (Water only)2 · 8%
  • Fire Damage1 · 4%
  • Second Suite (New)1 · 4%
  • Porch1 · 4%
  • Other(SR)1 · 4%
  • Back Water Valve (Sewer only)1 · 4%

Structures worked on

  • SFD - Detached19 · 76%
  • 2 Unit - Detached6 · 24%

Most recent permits

Issued Work What was filed Value Status
Jun 22, 2026 Building Permit Related(PS) Plumbing - CREATE A SECOND UNIT DWELLING IN THE BASEMENT. Open
Jun 22, 2026 Second Suite (New) CREATE A SECOND UNIT DWELLING IN THE BASEMENT. $32K Open
Feb 11, 2026 Building Permit Related(PS) Plumbing - Proposal to rebuild existing SFD due to fire damage. Open
Feb 11, 2026 Building Permit Related(MS) HVAC - Proposal to rebuild existing SFD due to fire damage. Open
Feb 11, 2026 Building Permit Related (DR) Drain - Proposal to rebuild existing SFD due to fire damage. Open
Feb 11, 2026 New Building Proposal to rebuild existing SFD due to fire damage. $500K New build
Oct 1, 2025 Multiple Projects Revision 01: Proposal to revise and change the basement unit room names and show compliance with minimum room and window area.To construct a second floor addition, front foyer addition and interior alterations for two units Open
Aug 5, 2025 Building Permit Related(MS) HVAC - Structural emergency fire damage demolition Open
Jul 22, 2025 New Building Proposal for restoration due to fire damage. $500K New build
Jul 4, 2025 Building Permit Related(PS) Plumbing - Structural emergency fire damage demolition Open
Jun 3, 2025 Other(SR) Proposal to add balcony on top of the existing garage. $8K Closed
Feb 10, 2025 Fire Damage Structural emergency fire damage demolition Open
Sep 20, 2024 Building Permit Related(MS) Revision : replacing the second floor heat pump system with duct system.HVAC - To construct a second floor addition, front foyer addition and interior alterations for two units Open
Jul 29, 2024 Building Permit Related (DR) Drain - UNDERPIN AND WALKOUT Open
Jul 24, 2024 Building Permit Related(PS) Plumbing - To construct a second floor addition, front foyer addition and interior alterations for two units Open
Aug 3, 2023 Multiple Projects UNDERPIN AND WALKOUT $20K Open
Jul 20, 2023 Multiple Projects UNDERPIN AND WALKOUT $20K Closed
Apr 4, 2023 Porch PROPOSAL TO BUILD A ROOFED PORCH ADDITION TO EXISTING HOUSE. (PORCH ENCLOSURE) $20K Closed
Feb 7, 2020 Back Water Valve (Sewer only) Closed
Sep 12, 2012 Addition(s) construct a second floor addition (bedroom) over existing garage $18K Closed
Jul 27, 2012 Backflow Prevention Devices (Water only) install backwater valve $5K Closed
Jul 18, 2012 Backflow Prevention Devices (Water only) install backwater valve & sump 4" mainline $5K Closed
Jul 7, 2011 Deck Deck at rear yard $3K Closed
Dec 20, 2001 Addition(s) REVISE FROM SLAB ON GRADE TO CONCRETE PIERS - UNHEATED SUNROOM Closed
Jun 1, 2001 Addition(s) UNHEATED SUNROOM $10K Closed

The 25 most recent of 25 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
25
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-395