Street · 2119 of 8,565 by permit count
Building permits on Codlin Cres
The City of Toronto has 90 building permits on record for Codlin Cres, going back to 2001. Those permits created 0 homes and removed 1, a net change of -1. Declared construction value totals $12.9M. The most recent permit was issued Sep 2, 2026 at 2045 CODLIN CRES.
- Permits on record
- 902001–2026
- Declared construction value
- $12.9Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 1net -1
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 2, 2026 | Interior Alterations | Proposed interior alterations to convert existing office (located inside the convenience store) into vape store with proposed exterior door. | $50K | Open |
| Jul 24, 2026 | Addition(s) | Revision 01 - Revision to include racking installation.-------------------------------------------------------------------------To construct additional warehouse area (545m2) to existing building | — | Open |
| Jul 3, 2026 | New Building | Revision 03: To delete current pre fab storage building and foundation drawings dated 2017 and replace with newer drawings dated 2020. Revision 01: Removal of the 2 storey office building from the permit. Proposal to construct a 1 storey pre-fabricated storage building and a 2 storey office building | — | New build |
| May 7, 2026 | Sprinklers | Proposal for new sprinkler system to accomodate addition.See also 22-168109 BLD 01 00 SR | $100K | Closed |
| Aug 9, 2024 | Site Service | Proposal for relocationg storm services, one maintenance hole and 2 catch basin | $15K | Open |
| Apr 14, 2023 | Building Permit Related(MS) | HVAC - To construct additional warehouse area (545m2) to existing building | — | Open |
| Mar 24, 2023 | Addition(s) | Revision 01: Proposal legalize and to maintain the west side storage shed, east side addition tothe existing garage and a covered rear porch. Revision requested by the Toronto Building inspector. | — | Closed |
| Jun 24, 2022 | Other(MS) | Proposed additional gross area to the existing building | $30K | Closed |
| May 30, 2022 | Inside and Outside Drains | Revision 01 - water line connectionDrain - Proposal to construct new building 'A3' automated car wash. | — | Closed |
| May 3, 2022 | Sign Building Permit Related | To erect and display two illuminated wall signs displaying static copy located at first storey.Dimensions of both signs:0.61m L x 3.06m W x 0.13m D at a height of 4.61m.**Tim Hortons** | — | Closed |
| Oct 28, 2021 | Sign Building Permit Related | To erect and display two illuminated wall signs, displaying static copy.****ARIZANI GROUP OF COMPANIES**** | — | Closed |
| Sep 22, 2021 | Sign Building Permit Related | Application fof a permit to erect and display three overhanging structure signs and one ground signs, all illuminated and displaying static copy. *****PIONEER***** | — | Closed |
| Aug 18, 2021 | Building Permit Related(PS) | Revision 01 - separate sanitary linePlumbing - Proposal to construct a one-storey addition to accomodate three new truck bays to existing welding shop. | — | Closed |
| Aug 17, 2021 | Site Service | Revision 02: changes to the site services layout | — | Closed |
| Aug 13, 2021 | Building Permit Related(MS) | HVAC - Proposal interior alterations for tenant fit-out of a new take-out eating establishment with drive-thru *Tim Hortons* in building 'A1'. Base Bldg Pemrit #20-139117 | — | Closed |
| Aug 10, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct new building 'A1' convience store and take-out eating establishment with drive-thru *Shell Only* | — | Closed |
| Aug 10, 2021 | Building Permit Related(PS) | Plumbing - Proposal interior alterations for tenant fit-out of a new take-out eating establishment with drive-thru *Tim Hortons* in building 'A1'. Base Bldg Pemrit #20-139117 | — | Closed |
| Aug 10, 2021 | Building Permit Related(MS) | HVAC - Proposal to construct new building 'A1' convience store and take-out eating establishment with drive-thru *Shell Only* | — | Closed |
| Aug 10, 2021 | Interior Alterations | Proposal interior alterations for tenant fit-out of a new take-out eating establishment with drive-thru *Tim Hortons* in building 'A1'. | $1K | Closed |
| May 3, 2021 | Canopy w/o Enclosure | Proposed new gas bar canopy with 6 pumps | $100K | Open |
| Apr 21, 2021 | New Building | Proposal to construct new building 'A3' automated car wash. | $300K | New build |
| Apr 21, 2021 | New Building | Proposal to construct new building 'A1' convience store and take-out eating establishment with drive-thru *Shell Only* | $354K | New build |
| Apr 21, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct new building 'A3' automated car wash. | — | Closed |
| Apr 21, 2021 | Building Permit Related(MS) | HVAC - Proposal to construct new building 'A3' automated car wash. | — | Closed |
| Oct 15, 2020 | Building Permit Related(MS) | HVAC - Proposal to construct 2 storey office building | — | Closed |
| Sep 10, 2020 | New Building | To construct a new detached vehicle storage garage | $10K | New build |
| Jul 31, 2020 | Building Permit Related(MS) | HVAC - Proposal to construct a one-storey addition to accomodate three new truck bays to existing welding shop. | — | Closed |
| Apr 28, 2020 | New Building | Rev03: changes as per bubbled drawings | — | New build |
| Apr 27, 2020 | Building Permit Related (DR) | Drain - Proposal to construct new building 'A1' convience store and take-out eating establishment with drive-thru *Shell Only* | — | Closed |
| Feb 28, 2020 | Building Permit Related(MS) | HVAC - Proposal to construct a 1 storey pre-fabricated storage building and a 2 storey office building. | — | Open |
| Apr 24, 2019 | Building Permit Related(PS) | Plumbing - Proposal to construct 2 storey office building | — | Closed |
| Oct 17, 2018 | New Building | Proposal to construct 2 storey office building | $500K | New build |
| Sep 12, 2018 | Demolition | Proposal to demolish existing 2-storey building. | — | Demolition |
| May 7, 2018 | Multiple Projects | Proposal for a 2nd. storey addition with interior alterations. | $500K | Closed |
| Aug 31, 2017 | Building Permit Related(PS) | Revision 1: to the interior layout of the building (basement and first floor)Plumbing - Proposal to construct 1-storey cultural centre (A2). (Related to Site Plan Approval 13 159180 WET 01 SA.) | — | Closed |
| Aug 25, 2017 | Building Permit Related(MS) | Revision 2: revised floor plans as per bubbled drawingsRevision 1: to the interior layout of the building (basement and first floor)HVAC - Proposal to construct 1-storey cultural centre (A2). (Related to Site Plan Approval 13 159180 WET 01 SA.) | — | Closed |
| Apr 10, 2017 | Backflow Prevention Devices (Water only) | Proposal to install a backflow preventor in existing industrial building. | $2K | Closed |
| Oct 20, 2016 | Site Service | Drain - Proposal to construct 1-storey cultural centre (A2). (Related to Site Plan Approval 13 159180 WET 01 SA.) | $500K | Closed |
| Feb 9, 2016 | Backflow Prevention Devices (Water only) | To install (1) Backflow Prevention Devices (Water only). | $2K | Closed |
| Aug 5, 2015 | Multiple Projects | Permit to construct partial 1st floor addition, 2nd floor addition and interior alterations to existing 2-Storey Office (converted house) | $75K | Closed |
The 40 most recent of 90 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.