Street · 2100 of 8,565 by permit count
Building permits on Brydon Dr
The City of Toronto has 91 building permits on record for Brydon Dr, going back to 1995. Declared construction value totals $11.1M. The most recent permit was issued Mar 25, 2025 at 20 Brydon Dr.
- Permits on record
- 911995–2025
- Declared construction value
- $11.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Mar 25, 2025 | Other(DS) | Installation of Compressed Natural Gas (CNG) fueling station equipment for clientsprivate vehicle fleet. Including MDS shop upgrade. This is not a building. There will beno running water and no attendants. | $535K | Closed |
| May 3, 2024 | Building Permit Related(PS) | Plumbing - repair wind damage to existing repair garage | — | Closed |
| Apr 9, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct a one storey addition to an existing buildingNote: Applicant wants to submit ASHRAE with HVAC | — | Open |
| Apr 3, 2024 | Multiple Projects | Revision 01: revision includes new office, new storage and washroomrepair wind damage to existing repair garage | — | Closed |
| Jun 1, 2023 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in an existing commecial building. | $4K | Closed |
| May 16, 2023 | Interior Alterations | To construct new doors on the west side of existing building (facing Brydon Drive) | $5K | Open |
| Feb 3, 2023 | Interior Alterations | REV 02: PROPOSING REVISION TO FOOD PROCESSING FACILITY AS BUBBLED | — | Open |
| Nov 18, 2022 | Building Permit Related(PS) | REV 01: proposing revision to plumbing layout as bubbled; number of fixtures are to remain the same | — | Open |
| Nov 18, 2022 | Building Permit Related(MS) | Rev 01: proposing revision to HVAC layout as bubbled | — | Open |
| Oct 4, 2021 | Site Service | Proposal for site storm drainage remediation. | $500K | Closed |
| Aug 10, 2021 | Site Service | Installation of a jellyfish filter unit for stormwater quality treatment and small pump downstream of the filter units, work located in the parking lot and will connect to the existing stormwater concrete trench drain | $200K | Open |
| Apr 29, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a one storey addition to an existing buildingNote: Applicant wants to submit ASHRAE with HVAC | — | Open |
| Feb 25, 2020 | Backflow Prevention Devices (Water only) | Proposed: Backflow preventer Replacement on domestic cold water system. Y strainer, expansion tank and associated piping and fittings. | $2K | Closed |
| Dec 2, 2019 | Sprinklers | Proposal to install new fire sprinkler system. | $25K | Open |
| Aug 6, 2019 | Site Service | Site service. | $250K | Open |
| Jun 21, 2019 | Building Permit Related(MS) | Revision 01: Redesign of the HVAC layoutHVAC - Proposal for interior alterationst o existing industrial building and relocation of one loading dock. | — | Open |
| Aug 30, 2018 | Multiple Projects | Proposal for interior alterationst o existing industrial building and relocation of one loading dock. | $2.8M | Open |
| Aug 30, 2018 | Inside and Outside Drains | Drain - Proposal for interior alterations to existing industrial building and relocation of one loading dock. | — | Open |
| Aug 30, 2018 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing industrial building and relocation of one loading dock. | — | Open |
| Jun 8, 2018 | Backflow Prevention Devices (Water only) | Proposal to install back flow prevention device. | $4K | Closed |
| May 1, 2018 | Backflow Prevention Devices (Water only) | PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING | $3K | Closed |
| Feb 14, 2018 | Other(BA) | Proposed (6.295m x 31.641m) mezzanine extension (203.8 sq. m.) at the rear of the assembly hall in an existing Place of Worship. | $200K | Open |
| Jan 30, 2018 | Building Permit Related(PS) | Plumbing - Alterations to an existing building. Construction of new entrance wall and interior alterations. Bldg B. | — | Open |
| Jan 30, 2018 | Building Permit Related(PS) | Plumbing - Alterations to an existing building. Construction of new entrance wall and interior alterations. Bldg A. | — | Open |
| Jan 24, 2018 | Addition(s) | Proposal to construct a one storey addition to an existing buildingNote: Applicant wants to submit ASHRAE with HVAC | $600K | Open |
| Dec 19, 2017 | Building Permit Related(MS) | HVAC - Alterations to an existing building. Construction of new entrance wall and interior alterations. Bldg A. | — | Open |
| Nov 1, 2017 | Building Permit Related(MS) | HVAC - Alterations to an existing building. Construction of new entrance wall and interior alterations. Bldg B. | — | Open |
| Aug 17, 2017 | Interior Alterations | Proposed Vehicle Repair Garage - To install three (3) O/H garage doors at the rear of the existing building. | $20K | Closed |
| Jul 13, 2017 | Inside and Outside Drains | Drain - Alterations to an existing building. Construction of new entrance wall and interior alterations. Bldg A and B. | — | Open |
| Jun 6, 2017 | Interior Alterations | Alterations to an existing building. BUILDING - "B" (ADMINISTRATIVE OFFICE) - Construction of new entrance wall and interior alterations. New sprinkler room, recaldding and underpining | $1.0M | Open |
| May 1, 2017 | Other(BA) | Alterations to an existing building. BUILDING - "A" (VEHICLE DEPOT/ MAINTENANCE GARAGE) - Construction of new entrance wall and interior alterations. | $1.0M | Open |
| May 1, 2017 | Building Permit Related (DR) | Drain - Alterations to an existing building. Construction of new entrance wall and interior alterations. Bldg A. | — | Open |
| Mar 7, 2017 | Backflow Prevention Devices (Water only) | Proposal to install a backflow preventer. | $20K | Closed |
| Sep 27, 2016 | Backflow Prevention Devices (Water only) | install backflow preventor | $3K | Closed |
| Aug 17, 2016 | Backflow Prevention Devices (Water only) | INSTALL BACKFLOW PREVENTOR | $2K | Closed |
| Jun 28, 2016 | Demolition | Proposal to demolish existing industrial manufacturing plant (8,000m2 area to be demolished). | $800K | Demolition |
| Jun 7, 2016 | Backflow Prevention Devices (Water only) | Installation of one premise isolation back flow preventer. | $6K | Closed |
| May 16, 2016 | Site Service | Relocation of existing fire hydrant to outside of proposed Compressed Natural gas equipment compound | $10K | Closed |
| May 11, 2016 | Backflow Prevention Devices (Water only) | install back flow preventer | $3K | Closed |
| Apr 19, 2016 | Backflow Prevention Devices (Water only) | Install a 1" backflow prevention device | $3K | Closed |
The 40 most recent of 91 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.