Street · 6159 of 8,565 by permit count
Building permits on Brunel Crt
The City of Toronto has 15 building permits on record for Brunel Crt, going back to 2011. Declared construction value totals $60.4M. The most recent permit was issued Apr 28, 2026 at 15 Brunel Crt.
- Permits on record
- 152011–2026
- Declared construction value
- $60.4Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20112026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Apr 28, 2026 | Sign Building Permit Related | 2 Overhanging Structure Sign | — | Open |
| Jun 4, 2025 | Interior Alterations | Proposal to install an egress door for an additional emergency exit | $2K | Open |
| Feb 11, 2022 | Sign Building Permit Related | In conjunction with a shared community facility which include a community centre, a child care centre and two elementary schools. proposal to erect and display two ground signs displaying both static and readograph copy and four way finding ground signs displaying only static copy. All illuminated a | — | Closed |
| Mar 16, 2020 | Electromagnetic Locks | Proposed to install 1 maglock | $5K | Closed |
| Dec 17, 2018 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | — | Closed |
| Jan 11, 2018 | New Building | Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | $60.0M | New build |
| Dec 15, 2017 | Building Permit Related(MS) | HVAC - Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | — | Closed |
| Nov 16, 2017 | Building Permit Related(PS) | Plumbing - Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | — | Closed |
| Nov 10, 2017 | Shoring | Proposal for stand alone excavation and shoring for soil remediation. | $236K | Closed |
| Sep 18, 2017 | Inside and Outside Drains | Drain - Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | $100K | Closed |
| Sep 15, 2017 | Building Permit Related (DR) | Drain - Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | — | Closed |
| Jul 26, 2017 | Partial Permit - Structural Framing | Conditional Permit - Part Permit - Proposal for a shared community facility which will include a community centre, a child care centre and two elementary schools (TDSB and TCDSB). | — | Closed |
| May 29, 2015 | Alternative Solution | Alternative solution for piping in connection to 15 117035 PSA. | — | Closed |
| Mar 2, 2015 | Backflow Prevention Devices (Water only) | Install one 8" and one 6" back flow preventer in existing condominium building | $12K | Closed |
| Aug 26, 2011 | Electromagnetic Locks | Proposal to install 3 mag locks (1-ground and 2-27th floor) of existing condo. | $3K | Open |
The 15 most recent of 15 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.