Street · 473 of 8,565 by permit count
Building permits on Beechgrove Dr
The City of Toronto has 346 building permits on record for Beechgrove Dr, going back to 1995. Those permits created 26 homes and removed 18, a net change of +8. Declared construction value totals $525.7M. The most recent permit was issued Sep 3, 2026 at 51 Beechgrove Dr.
- Permits on record
- 3461995–2026
- Declared construction value
- $525.7Mas filed, not adjusted
- Homes created
- 26dwelling units
- Homes removed
- 18net +8
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 3, 2026 | New Building | Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for the existi | $310.5M | New build |
| Sep 3, 2026 | Building Permit Related(MS) | HVAC - Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for the | — | Open |
| Sep 3, 2026 | Inside and Outside Drains | Drain - Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for th | $900K | Open |
| Sep 3, 2026 | Building Permit Related (DR) | Drain - Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for th | — | Open |
| Sep 3, 2026 | Building Permit Related(PS) | Plumbing - Proposal to construct new industrial building for open to air tanks, underground service galleries, utility rooms & access houses, process buildings & miscellaneous demolition - Contract 2, "Highland Creek Water Treatment Plant" | — | Open |
| Aug 25, 2026 | Backflow Prevention Devices (Water only) | Install 3/4¿ DCVA premise isolation valve and potable expansion tank. | $4K | Open |
| Apr 22, 2026 | Back Water Valve (Sewer only) | Back water valve installation | — | Closed |
| Nov 7, 2025 | Alternative Solution | Proposal for the standpipe installation to meet the requirements of the 2024 OBC as opposed to the 2012 OBC that this project is permitted under. Specifically, it is proposed that a Class 1 standpipe system, with risers and 65 mm hose connections (not in cabinets) be provided on the main landing of | — | Closed |
| Oct 10, 2025 | Building Permit Related(PS) | Revision 01 - Proposal to add one bathroom on the first floorPlumbing - Proposed rear addition and attached garage, interior alterations, rear deck, and rebuild front verandah | — | Closed |
| Sep 18, 2025 | Building Permit Related(PS) | Plumbing - Proposal for TWAS roof upgrades | — | Open |
| Sep 16, 2025 | Other(BA) | Proposal for TWAS roof upgrades | $1.0M | Open |
| Sep 2, 2025 | Demolition | Proposal to demolish of entire building (Plant Store) | — | Demolition |
| Aug 8, 2025 | Building Permit Related(MS) | HVAC - Proposal for TWAS roof upgrades | — | Closed |
| May 13, 2025 | Building Permit Related (DR) | Drain - Proposal for a new SFD-Detached | — | Open |
| May 13, 2025 | Building Permit Related(PS) | Plumbing - Proposal for a new SFD-Detached | — | Open |
| May 13, 2025 | Building Permit Related(MS) | HVAC - Proposal for a new SFD-Detached | — | Open |
| May 13, 2025 | New Building | Proposal for a new SFD-Detached | $1.2M | New build |
| Apr 10, 2025 | Demolition | Proposal to demolish the 1 storey decommissioned Chlorination Building at a water treatment facility. | — | Demolition |
| Mar 26, 2025 | Interior Alterations | Proposal for Renovation & Upgrades to existing TWAS and Sludge Storage Tanks. Upgrades to existing biofilters including new heated enclosures for humidifier equipment. New structures will be built for the heating to accommodate the humidifier equipment; works includes mechanical, plumbing and electr | $6.0M | Open |
| Mar 26, 2025 | Building Permit Related(PS) | Plumbing - Proposal for Renovation & Upgrades to existing TWAS and Sludge Storage Tanks. Upgrades to existing biofilters including new heated enclosures for humidifier equipment. New structures will be built for the heating to accommodate the humidifier equipment; works includes mechanical, plumbing | — | Open |
| Mar 26, 2025 | Building Permit Related(MS) | HVAC - Proposal for Renovation & Upgrades to existing TWAS and Sludge Storage Tanks. Upgrades to existing biofilters including new heated enclosures for humidifier equipment. New structures will be built for the heating to accommodate the humidifier equipment; works includes mechanical, plumbing and | — | Open |
| Feb 3, 2025 | Deck | Extension to a pre-existing from deck. | $12K | Closed |
| Nov 8, 2024 | Building Permit Related (DR) | Drain - Proposed interior alterations to create second suite in basement of existing single family dwelling. | — | Closed |
| Nov 8, 2024 | Second Suite (New) | Proposed interior alterations to create second suite in basement of existing single family dwelling. | $100K | Closed |
| Nov 8, 2024 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to create second suite in basement of existing single family dwelling. | — | Closed |
| May 6, 2024 | Building Permit Related(PS) | Revision 02 - Changes to existing plumbing systems within disinfection building and south effluent pumping station.Revision - related to washer dryer and hose bibs.Plumbing - Expansion and renovation to south effluent pumping station, disinfection building and storage plant building along with remov | — | Closed |
| May 6, 2024 | Building Permit Related(PS) | Revision 01: See cover letter for detailed revisionsPlumbing - construct 4 access houses for water treatment plant, interior alteratio toexisting tunnels, concrete repair thorughout existing South plant tunnels, plumbing for 6 new site trailers | — | Closed |
| May 3, 2024 | Demolition | Proposal to demolish a chlorine contact tank, anerobic filters and Old Headhouse structure - "Highland Creek Water Treatment Plant" | — | Demolition |
| Apr 18, 2024 | Second Suite (New) | Proposed interior alterations to create second suite in basement of existing single family dwelling. | $100K | Closed |
| Apr 18, 2024 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to create second suite in basement of existing single family dwelling. | — | Closed |
| Feb 23, 2024 | Multiple Projects | Revision 02 - Changes structure and hvac drawings as per bubbled drawingsProposal to change interior alterations and resize the front porch and rear deck. Proposed rear addition and attached garage, interior alterations, rear deck, and rebuild front verandah | — | Closed |
| Feb 14, 2024 | Building Permit Related(MS) | HVAC Revision 01 - Changes to structural and HVAC drawings as per bubbled plans.Proposed rear addition and attached garage, interior alterations, rear deck, and rebuild front verandah | — | Closed |
| Nov 21, 2023 | Building Permit Related(MS) | HVAC - Construction of the new Northeast (NE) Plant, a 110 ML/dconventional activated sludge treatment plant, a new high-voltage substation | — | Open |
| Nov 21, 2023 | New Building | The Highland Creek Fluidized Bed Incineration Project and South Facility Upgrades Project include the demolition of the existing Heat Treatment Building (under separate permit), and construction of a new Fluidized Bed Incinerator (FBI) Building. The new FBI building is 4-storeys. There are various u | $26.7M | New build |
| Nov 21, 2023 | Building Permit Related(PS) | Plumbing - Construction of the new Northeast (NE) Plant, a 110 ML/dconventional activated sludge treatment plant, a new high-voltage substation | — | Open |
| Oct 18, 2023 | Building Permit Related(PS) | REVISION 01: Plumbing - Proposal to construct four (4) new hydraulic unit buildings and renovation of below grade Tunnel No. 12. | — | Closed |
| Sep 21, 2023 | Building Permit Related(PS) | Plumbing - To create a legal second unit in basement | — | Closed |
| Sep 14, 2023 | Building Permit Related (DR) | Drain - To create a legal second unit in basement | — | Closed |
| Sep 14, 2023 | Second Suite (New) | REV 01: Proposal for changes due to site conditions.To create a legal second unit in basement | — | Closed |
| Mar 6, 2023 | Demolition | demolish existing house | — | Demolition |
The 40 most recent of 346 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.