The City of Toronto has 301 building permits on record for Arrow Rd, going back to 1985. Declared construction value totals $89.8M. The most recent permit was applied for Aug 31, 2026 at 64 Arrow Rd.
- Permits on record
- 3011985–2026
- Declared construction value
- $89.8Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 31, 2026 | Solar Collector | Proposal for the installation of a rooftop 321kW-DC solar photovoltaic system at Univar Solutions, | $538K | Open |
| Aug 20, 2026 | Building Permit Related(PS) | Plumbing - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical s | — | Open |
| Aug 20, 2026 | Building Permit Related(MS) | HVAC - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical stora | — | Open |
| Jun 12, 2026 | Partial Permit - Foundation | Conditional Permit - Part Permit - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated | — | Closed |
| Jun 12, 2026 | Building Permit Related (DR) | Drain - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical stor | — | Open |
| Jun 12, 2026 | Site Service | Conditional Permit - Drain - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storag | — | Open |
| Apr 23, 2026 | Partial Permit - Structural Framing | Part Permit - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemica | — | Open |
| Apr 23, 2026 | Site Service | REV 01: Revision to include adjustment to routing layout of storm lines to suit inverts determined by site conditions Proposal for new piping to be installed with manholes and connection to City storm at street. | — | Open |
| Mar 23, 2026 | Addition(s) | Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical storage room | $17.5M | Open |
| Mar 12, 2026 | Building Permit Related(PS) | Plumbing - Proposed to install a sales trailer on a vacant industrial site, as a permanent structure. | — | Closed |
| Mar 5, 2026 | Building Permit Related(MS) | HVAC - Proposed to install a sales trailer on a vacant industrial site, as a permanent structure. | — | Closed |
| Mar 3, 2026 | New Building | REVISION - due to minor changes that have come up due to the sales trailer specificationsProposed to install a sales trailer on a vacant industrial site, as a permanent structure. | — | New build |
| Feb 27, 2026 | Demolition | Demolition of one-storey steel-clad workshop located at 30 Arrow Road and one-storey brick building located at 24 Arrow Road. Demolition includes removal of building envelope, structural framing, slabs, foundations, and footings. See 25 144000 WET 07 SA for future development. | — | Demolition |
| Jan 29, 2026 | Demolition | Proposal to demolish the 1.5 storey storage building.See 25 144000 WET 07 SA for future development. | — | Demolition |
| Jan 14, 2026 | Building Permit Related(MS) | HVAC - Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. | — | Open |
| Jan 14, 2026 | Building Permit Related(PS) | Plumbing - Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. | — | Open |
| Jan 13, 2026 | Other(BA) | Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. | $9.9M | Open |
| Dec 3, 2025 | Building Permit Related(PS) | Plumbing - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. | — | Open |
| Oct 28, 2025 | Interior Alterations | Proposal for interior alterations for structural bracing modifications to enlarge an existing interior wall opening. | $50K | Closed |
| Sep 8, 2025 | Inside and Outside Drains | Drain - Proposed to install a sales trailer on a vacant industrial site, as a permanent structure. | $175K | Closed |
| Aug 21, 2025 | Addition(s) | REV 01: Removal of ceiling & relocation of siamese connection.Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. | — | Closed |
| Jul 11, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC | — | Closed |
| Jul 11, 2025 | Multiple Projects | The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC and exhaust systems along wit | $16.0M | Open |
| Jul 11, 2025 | Building Permit Related(MS) | HVAC - The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC and exhaust systems al | — | Open |
| Apr 16, 2025 | Backflow Prevention Devices (Water only) | Proposal to replace existing backflow prevention device and associates | $6K | Closed |
| Apr 8, 2025 | Alternative Solution | Proposal for an alternative solution to omit the standpipe system | — | Closed |
| Mar 18, 2025 | Sprinklers | Fire protection | $50K | Open |
| Nov 29, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. | — | Open |
| Oct 24, 2024 | Alternative Solution | A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, ¿EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT¿ TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILA | — | Closed |
| Sep 18, 2024 | Other(BA) | REVISION - increase the concrete pad height below the tanks, increase the height of the service platform, modifications to the retaining wall design above the padExterior concrete pad for 3 exterior alcohol tank and service platform (Beverage filling facility) | — | Open |
| Aug 16, 2024 | Building Permit Related(MS) | HVAC - To add one exterior exit door - Arrow Road Garage | — | Open |
| Aug 16, 2024 | Interior Alterations | To add one exterior exit door - Arrow Road Garage | $20K | Open |
| Aug 9, 2024 | Inside and Outside Drains | Drain - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. | $1.0M | Open |
| Aug 1, 2024 | Partial Permit - Structural Framing | Part Permit - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. | — | Closed |
| Aug 1, 2024 | Partial Permit - Foundation | Part Permit - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. | — | Closed |
| Jul 29, 2024 | Other(BA) | SHORING - Excavate & shoring for the removal of existing underground tanks at TTC bus garage at 3 locations, totaling 90.95m2 of shoring. There is a building permit for the work but does not include the shoring. The permit number is 22 229761 BLD 00 BA.Dispose and replace underground storage tanks a | — | Open |
| Jul 5, 2024 | Alternative Solution | A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT , TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILA | — | Closed |
| Nov 27, 2023 | Other(DS) | Replacement of two existing 45,000L volume diesel fuel above ground storage tanks and associated appurtnenances | $3.0M | Closed |
| Sep 19, 2023 | Backflow Prevention Devices (Water only) | Proposal to install a backflow preventor in an existing warehouse. | $3K | Open |
| Aug 2, 2023 | Multiple Projects | Revision 02: Proposal to modify an existing flammable liquid filling room to be in compliance with OFC Part 4 and as approved by Toronto Fire Services.Revision #1 - to main roof beams and fire protection. | — | Open |
The 40 most recent of 301 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.