Street · 1862 of 8,567 by permit count
Building permits on Alness St
The City of Toronto has 104 building permits on record for Alness St, going back to 1998. Declared construction value totals $18.1M. The most recent permit was issued Jul 27, 2026 at 850-894 ALNESS ST.
- Permits on record
- 1041998–2026
- Declared construction value
- $18.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 27, 2026 | Building Permit Related(MS) | Revision to - Amendment to existing permit 25 190668 HVA 00 MS to add wall mounted A/C unit to LAN Roomon 2nd floor and to change exhaust fan in kitchen to exhaust outside.Rev 02: Amendment to existing permit 25 190668 HVA 00 MS to add wall mounted A/C unit to LAN Room on 2nd floor and to change exh | — | Open |
| Apr 15, 2026 | Interior Alterations | Rev 02: changes to add a dropped acoustic tile ceiling on the 2nd floor. Lighting, HVAC and sprinkler layouts have been revised.Rev 01: changes to barrier free entrance and repairs to fire separations on second floor exit stairsProposal for interior alterations for the construction of new offices, w | — | Open |
| Apr 1, 2026 | Building Permit Related(PS) | Rev 01: changes to add a dropped acoustic tile ceiling on the 2nd floor. Lighting, HVAC and sprinkler layouts have been revised.Plumbing - Proposal for interior alterations for the construction of new offices, washrooms, meeting spaces, lunchroom and elevator. New plumbing, new HVAC and electrical d | — | Open |
| May 27, 2025 | Special Ventilation System | Proposed commercial kitchen ventilation and fire suppression system. | $20K | Closed |
| May 26, 2025 | Re-Roofing/Re-Cladding | Proposal for structural work to reinforce the roof of an commercial building - UNIT 3Convenience address is 877 Alness St | $4K | Closed |
| Aug 27, 2024 | Interior Alterations | Proposal to install a new commercial cooler and freezer in an existing warehouse. Install nessessary rooftop equipment for coolers/freezer with structural reinforcing. Modify existing sprinkler system. | $50K | Open |
| Aug 23, 2024 | Interior Alterations | Proposal to remove existing non-loadbearing cmu wall between units 947 and 949 | $5K | Open |
| May 27, 2022 | Building Permit Related(PS) | Plumbing - Proposal to install fuel cells and natural gas piping at exterior of building; domestic cold water piping as well as a transformer and cooling system inside the building. | — | Closed |
| May 27, 2022 | Building Permit Related(MS) | HVAC - Proposal to install fuel cells and natural gas piping at exterior of building; domestic cold water piping as well as a transformer and cooling system inside the building. | — | Closed |
| May 27, 2022 | Other(BA) | Proposal to install fuel cells and natural gas piping at exterior of building; domestic cold water piping as well as a transformer and cooling system inside the building. | $1.8M | Closed |
| Feb 11, 2022 | Building Permit Related(PS) | Plumbing - Tenant fit-out in basement for a food production facility | — | Closed |
| Feb 11, 2022 | Building Permit Related(MS) | HVAC - Tenant fit-out in basement for a food production facility | — | Closed |
| May 5, 2021 | Interior Alterations | Tenant fit-out in basement for a food production facility | $500K | Closed |
| Feb 27, 2020 | Sign Building Permit Related | To erect and display an illuminated static copy wall sign at the first storey on the north east elevation.*CIBC* | — | Closed |
| Oct 3, 2019 | Building Permit Related(MS) | HVAC Revision #2 - Changes to interior layout to add a new office.HVAC Revision #1 - Proposal to convert existing production television studio to university use (lecture hall/offices); interior alterations - upgrade interior partitions to meet 1hr fire separation and build new water closets. | — | Closed |
| Sep 25, 2019 | Interior Alterations | Revision 2. Changes to interior layout to add a new office.Revision 1. Interior alterations due to change of tenant, see the attached bubbled drawings | — | Closed |
| Dec 18, 2018 | Fire Alarm | Fire alarm related to permit # 16 196877 BLD 00 BA | $3K | Open |
| Dec 7, 2018 | Building Permit Related(PS) | Plumbing - Interior alteration of warehouse space to accomodate the construction of a medical marihuana production facility. Scope of work will include demo of existing walls, construction of new walls, new electrical distribution, new HVAC, sprinklers, plumbing and re-inforcement of existing open w | — | Closed |
| Dec 7, 2018 | Building Permit Related(MS) | HVAC - Interior alteration of warehouse space to accomodate the construction of a medical marihuana production facility. Scope of work will include demo of existing walls, construction of new walls, new electrical distribution, new HVAC, sprinklers, plumbing and re-inforcement of existing open web s | — | Closed |
| Dec 7, 2018 | Interior Alterations | Interior alteration of warehouse space to accommodate the construction of a manufacturing use. | $12.0M | Closed |
| Aug 14, 2018 | Change of Use | Revision - provide fire separation in the aisles, Unit 121 | — | Closed |
| Jul 30, 2018 | Building Permit Related(MS) | Revision - provide fire separation in the aisles, Unit 121 | — | Closed |
| Nov 6, 2017 | Other(PS) | Proposal to install new grease interceptor in unit #3 of existing multiple unit building "Fruit Blossom Creations" | $5K | Closed |
| Nov 6, 2017 | Special Ventilation System | Proposal to install new kitchen exhaust system in unit #3 of existing multiple unit building "Fruit Blossom Creations" | $5K | Closed |
| Oct 19, 2017 | Site Service | Proposed sanitary piping, storm piping, catch basins, interceptors and manholes. | $200K | Closed |
| Oct 18, 2017 | Retaining Wall | Construct retaining wall for future development | $120K | Closed |
| Jul 4, 2017 | Building Permit Related(PS) | Plumbing - Proposal to convert existing production television studio to university use (lecture hall/offices); interior alterations - upgrade interior partitions to meet 1hr fire separation and build new water closets. | — | Closed |
| May 9, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations for and industrial fit-out - Unit 17-18-19 | — | Open |
| May 9, 2017 | Building Permit Related(MS) | HVAC - Interior alterations for and industrial fit-out - Unit 17-18-19 | — | Open |
| May 9, 2017 | Building Permit Related(MS) | HVAC - Alterations to - Unit 16 - Warehouse | — | Open |
| May 9, 2017 | Building Permit Related(PS) | Plumbing - Alterations to - Unit 16 - Warehouse | — | Open |
| May 9, 2017 | Building Permit Related(MS) | HVAC - Interior alterations for and industrial fit-out - Unit 20-21 | — | Open |
| May 9, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations for and industrial fit-out - Unit 20-21 | — | Open |
| May 8, 2017 | Building Permit Related(MS) | HVAC - Interior alterations for and industrial fit-out - Unit 9-15 | — | Open |
| May 8, 2017 | Building Permit Related(MS) | HVAC - Interior alterations for and industrial fit-out - Unit 6-7-8 | — | Open |
| May 8, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations for and industrial fit-out - Unit 6-7-8 | — | Open |
| May 8, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations for and industrial fit-out - Unit 9-15 | — | Open |
| May 4, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations for and industrial fit-out - Unit 5 | — | Open |
| May 4, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations for and industrial fit-out - Unit 4 | — | Open |
| May 4, 2017 | Building Permit Related(MS) | HVAC - Interior alterations for and industrial fit-out - Unit 4 | — | Open |
The 40 most recent of 104 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.