Street · 68 of 8,565 by permit count
Building permits on Adelaide St E
The City of Toronto has 1,546 building permits on record for Adelaide St E, going back to 1988. Those permits created 1,179 homes and removed 0, a net change of +1,179. Declared construction value totals $445.1M. The most recent permit was issued Sep 10, 2026 at 1 Adelaide St E.
- Permits on record
- 1,5461988–2026
- Declared construction value
- $445.1Mas filed, not adjusted
- Homes created
- 1,179dwelling units
- Homes removed
- 0net +1,179
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Downtown Yonge East 1,169 permits
Moss Park 328 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 10, 2026 | Electromagnetic Locks | Installation of 7 maglocks - 14th Floor Elevator Lobby two Double Maglock & one at Freight Vestibule 143412th floor Elevator Lobby two Double Maglock, Freight Vestibule 123311th floor Elevator Lobby Two Double maglock, Freight Vestibule 1134 | $6K | Open |
| Sep 9, 2026 | Interior Alterations | Revision to lobby rated walls to rated ceiling. Proposal for interior alterations of existing office for new landlord fit out. | — | Open |
| Sep 1, 2026 | Building Permit Related(MS) | Revision 01: Revision to permit (refer to permit amendment)HVAC - Proposal for interior alterations | — | Open |
| Sep 1, 2026 | Building Permit Related(PS) | Revision 01: Revision to permit (refer to permit amendment)Plumbing - Proposal for interior alterations | — | Open |
| Aug 19, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alteration to existing group D space. | — | Open |
| Aug 19, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration to existing group D space. | — | Open |
| Aug 17, 2026 | Building Permit Related(MS) | HVAC - Proposed alterations for the build-out of office space of floors 3, 4, 6, 7, 15, 16.See also 26-155335 BLD 00 BA | — | Open |
| Aug 17, 2026 | Interior Alterations | Proposal for interior alteration to existing group D space. | $800K | Open |
| Aug 17, 2026 | Building Permit Related(PS) | Plumbing - Proposed alterations for the build-out of office space of floors 3, 4, 6, 7, 15, 16.See also 26-155335 BLD 00 BA | — | Open |
| Aug 12, 2026 | Interior Alterations | Proposed alterations for the build-out of office space of floors 3, 4, 6, 7, 15, 16.See also 26-155335 BLD 00 BA | $28.0M | Open |
| Aug 12, 2026 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed alterations for the build-out of office space of floors 3, 4, 6, 7, 15, 16.See also 26-155335 BLD 00 BA | — | Open |
| Aug 6, 2026 | Building Permit Related(MS) | Revision to lobby rated walls to rated ceiling. HVAC - Proposal for interior alterations of existing office for new landlord fit out. | — | Closed |
| Aug 5, 2026 | Building Permit Related(MS) | HVAC - Remove three offices and construct one new office and staff room - Colliers Management Office. | — | Open |
| Aug 5, 2026 | Building Permit Related(PS) | Plumbing - Remove three offices and construct one new office and staff room - Colliers Management Office. | — | Open |
| Jul 29, 2026 | Interior Alterations | Remove three offices and construct one new office and staff room - Colliers Management Office. | $50K | Open |
| Jul 29, 2026 | Electromagnetic Locks | Proposal to install 2 maglocks. | $40K | Open |
| Jul 23, 2026 | Building Permit Related(PS) | Plumbing - INTERIOR ALTERATIONS TO 1 EXISTING OFFICE & 1 NEW OFFICE SUITE FIT-OUT | — | Open |
| Jul 23, 2026 | Building Permit Related(MS) | HVAC - INTERIOR ALTERATIONS TO 1 EXISTING OFFICE & 1 NEW OFFICE SUITE FIT-OUT | — | Open |
| Jul 21, 2026 | Interior Alterations | INTERIOR ALTERATIONS TO 1 EXISTING OFFICE & 1 NEW OFFICE SUITE FIT-OUT | $100K | Open |
| Jul 20, 2026 | Electromagnetic Locks | Proposed new maglock installation | $1K | Open |
| Jul 20, 2026 | Alter: Boiler/Furnace/AC Replacement | Replacement of existing heating system with Air Source Heat Pumps and a back up condensing boiler. Mechanical room update to renew building pumps. | $2.0M | Open |
| Jul 15, 2026 | Building Permit Related(MS) | HVAC - Interior tenant improvment for single tenant, on part of the 8th floor and full 9th and 10th floors.Scope includes stair infill, non-load beaing partition construction, re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations are | — | Open |
| Jul 14, 2026 | Building Permit Related(MS) | HVAC - Existing plumbing fixtures are being removed and replaced with new. Sprinkler heads and fire alarm devices are being removed and replaced to accommodate a new ceiling installation within corridors and washrooms. | — | Open |
| Jul 14, 2026 | Building Permit Related(PS) | Plumbing - Existing plumbing fixtures are being removed and replaced with new. Sprinkler heads and fire alarm devices are being removed and replaced to accommodate a new ceiling installation within corridors and washrooms. | — | Open |
| Jul 13, 2026 | Building Permit Related(PS) | Plumbing - Interior tenant improvment for single tenant, on part of the 8th floor and full 9th and 10th floors.Scope includes stair infill, non-load beaing partition construction, re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations | — | Open |
| Jul 9, 2026 | Interior Alterations | Interior tenant improvment for single tenant, on part of the 8th floor and full 9th and 10th floors.Scope includes stair infill, non-load beaing partition construction, re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations are existi | $21.2M | Open |
| Jul 9, 2026 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Interior tenant improvment for single tenant, on part of the 8th floor and full 9th and 10th floors.Scope includes stair infill, non-load beaing partition construction, re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing a | — | Open |
| Jul 6, 2026 | Interior Alterations | Existing plumbing fixtures are being removed and replaced with new. Sprinkler heads and fire alarm devices are being removed and replaced to accommodate a new ceiling installation within corridors and washrooms. | $44K | Open |
| Jun 26, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing office. | — | Open |
| Jun 26, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing office. | — | Open |
| Jun 26, 2026 | Interior Alterations | Proposal for interior alterations to existing office. | $500K | Open |
| Jun 24, 2026 | Other(PS) | — | $45K | Open |
| Jun 24, 2026 | Other(MS) | Mechanical stand alone (balance exhaust) for existing office space on the 10th floor. | $45K | Open |
| Jun 18, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to SUITE 2400 - FLOOR 24. | — | Open |
| Jun 18, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to SUITE 2400 - FLOOR 24. | — | Open |
| Jun 17, 2026 | Interior Alterations | Proposal for interior alterations to SUITE 2400 - FLOOR 24. | $500K | Open |
| Jun 8, 2026 | Building Permit Related(PS) | Plumbing - The scope of work includes demolition of existing office space of floors 3, 4, 6, 7, 15, 16 | — | Open |
| Jun 8, 2026 | Interior Alterations | The scope of work includes demolition of existing office space of floors 3, 4, 6, 7, 15, 16 | $28.0M | Open |
| Jun 8, 2026 | Building Permit Related(MS) | HVAC - The scope of work includes demolition of existing office space of floors 3, 4, 6, 7, 15, 16 | — | Open |
| Jun 2, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations of existing office for new landlord fit out. | — | Open |
The 40 most recent of 1,546 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.